Starting the Routine in a Plant: Who Practices First

How to choose the first process, the first learner and the first coach, what the learning curve of a pair looks like, and the figures that say whether anybody is still practicing.

A routine is not introduced by training people in a room. It is introduced by one pair practicing in public, where other supervisors walk past them every day.

Who practices first

Choice Take Avoid
The process Repeating, measurable, with a named owner who is there daily A project, a one-off, or a process in the middle of a breakdown
The learner The person responsible for the process, whatever their grade A specialist from a staff department who cannot change the work
The coach The learner’s own manager, in the area every day A trainer or consultant who is there on Tuesdays
The first target condition One station or one step, four weeks The whole line, or anything that needs a budget decision

The learner has to be the person who owns the process: they have the authority to change the work and the duty to be there every morning. A staff expert can coach, but cannot practice on somebody else’s behalf.

The learning curve of a pair

The first target condition takes four to six weeks, and half of that goes into learning what a target condition is. Expect to rewrite it three times.

The second takes three to four weeks, and the coach mostly asks about the expected figure. By the third, the learner sees obstacles before they bite and the conversation gets shorter. From the fourth the learner is ready to coach somebody else, and the coach drops back to two or three visits a week.

The cadence of an area

Every working day, twenty minutes: the conversation at the process. Once or twice a week: the second coach observes, then coaches the coach. Every month, forty-five minutes: the sponsor with all pairs, at the process, deciding on the obstacles that sit above the pairs and on which area starts next.

The monthly slot is the one that gets dropped first and costs the most. Obstacles that nobody above the pair removes teach the pair that the routine does not reach far.

Count the practice, not only the output

Output figures say whether the process got better. Practice figures say whether the routine is alive.

Figure of practicing After sixteen weeks on L3
Conversations held of those planned 71 of 75
Experiments run 24
Working days per experiment 2.9
Experiments whose result differed from the expectation 11 of 24
Obstacles named and closed 19 of 27
Target conditions reached by their date 3 of 3

Two of them belong on the board where everybody can see them: days since the last experiment, three or less, and conversations held in the last ten working days, eight or more. The share of experiments that surprised the pair should not be low either.

What it produced, and what it cost

In sixteen weeks the line went from 310 to 358 units per shift, from an effective cycle of 87 seconds to 75, from 41 to 91 percent of cycles inside the planned cycle and from 23 to seven line stops per shift. The two catch-up shifts a month stopped.

The effort was 75 days of practice at 1.25 hours a day between the two of them, EUR 5,625 of time, plus EUR 4,300 of small devices and EUR 975 for the second coach: EUR 10,900. The benefit was EUR 37,800 from the catch-up shifts no longer needed and EUR 23,920 from rework avoided, EUR 61,720 a year, payback 2.1 months. The 48 extra units per shift were not counted in money: the plant kept them as cover for the demand it expects from 2027.

The part that pays next year is not in the table: two team leaders who can take a process from a measured condition to a target condition without help.