What do you want to calculate?
15 calculators for the shop floor and the office: enter your figures, see the result with the calculation step by step and a short reading. Free for newsletter readers.
Not sure? Choose a directionWe do not store your data. Every calculation runs entirely in your browser. The figures you enter are neither transmitted nor stored. Results are shown after a one-time newsletter sign-up, and we store only your email address for that.
Pick a calculator and start
15 calculators
Flow and takt
- Takt Time
The pace of customer demand: how many seconds you have for one unit so that the daily demand is met exactly.
Takt time = Available working time / Customer demand - Cycle Time and Line Capacity
Checks whether a line can meet demand: capacity from the slowest station, load against demand and the number of operators from the work content.
Line capacity = Available time × Planned efficiency / Bottleneck cycle time - Lead Time and Process Cycle Efficiency
Turns the inventory in a value stream into lead time and shows which share of that time adds value.
Lead time = Inventory in the value stream / Demand per day
Equipment and availability
- OEE
Overall equipment effectiveness from one shift: availability, performance and quality, plus the minutes lost in each of the three.
OEE = Availability × Performance × Quality - MTBF, MTTR and Availability
Reliability in three figures: the average running time between failures, the average repair time and the technical availability that follows.
MTBF = Total operating time / Number of failures
Changeover and lot size
- Changeover Share and EPEI
Every part every interval: how often you can run all part variants with the time that demand leaves for changeovers.
Time for changeovers = Available time - Run time for the daily demand - Economic Order Quantity
The order or lot quantity at which ordering cost and holding cost together are lowest.
EOQ = Square root of (2 × Annual demand × Cost per order / Holding cost per unit and year)
Inventory and replenishment
- Kanban Card Count
The number of kanban cards or containers a loop needs: demand during the replenishment lead time plus safety, divided by the container quantity.
Kanban cards = Demand per day × Replenishment lead time × (1 + Safety factor) / Container quantity (rounded up) - Safety Stock
The stock that protects a service level against variation in demand and in lead time.
Safety stock = z × Square root of (Lead time × Standard deviation of demand² + Average demand² × Standard deviation of lead time²) - Reorder Point
The inventory level at which a new order has to be placed, and whether today is the day.
Reorder point = Average demand × Lead time + Safety stock - Inventory Turns and Days on Hand
How often the inventory turns per year, how many days it covers and what holding it costs.
Inventory turns = Annual cost of goods sold / Average inventory value
Quality and capability
- Process Capability Cp and Cpk
How well a stable process fits into its tolerance: Cp for the spread, Cpk for spread and centering together.
Cp = (Upper limit - Lower limit) / (6 × Standard deviation) - DPMO and Sigma Level
Defects per million opportunities and the sigma level that goes with it, to compare processes of different complexity.
DPMO = Defects / (Units × Opportunities per unit) × 1,000,000 - First Pass Yield and Rolled Throughput Yield
The share of units that are right the first time at one step, and the share that passes a whole chain of steps without any defect.
FPY = Units good the first time / Units entering the process
Cost and payback
No calculator matches. Try a shorter search term or choose a direction.