OEE Calculator

Overall equipment effectiveness from one shift: availability, performance and quality, plus the minutes lost in each of the three.

Your figures

min

Shift time minus breaks and planned non-production.

min

Breakdowns, changeovers, waiting for material.

s per part
parts
parts

Good the first time, without rework.

Calculated in your browser. Your figures are neither transmitted nor stored.

Enter your figures and select Calculate. The fields are prefilled with a worked example.

The formula

Use this calculator when you want to know how much of the planned time a machine turns into good parts, and which loss is the largest.

OEE = Availability × Performance × Quality

Availability = Run time / Planned production time

Performance = (Ideal cycle time × Total parts) / Run time

Quality = Good parts / Total parts

Worked example

Inputs

  • Planned production time: 450 min
  • Stop time: 60 min
  • Ideal cycle time: 30 s per part
  • Total parts produced: 700 parts
  • Good parts: 665 parts

Calculation

  1. Run time = 450 min - 60 min = 390 min
  2. Availability = 390 / 450 = 86.7%
  3. Performance = (30 s × 700 parts) / (390 min × 60) = 89.7%
  4. Quality = 665 / 700 = 95%
  5. OEE = 86.7% × 89.7% × 95% = 73.9%
  6. Losses: stops 60 min, speed 40 min, quality 17.5 min

Result

OEE: 73.9%. 73.9% of the planned time became good parts at ideal speed. That is above the usual range of 55 to 70 percent; 85 percent is the frequently quoted mark for very good lines. The largest loss is stops with 60 minutes: start there.

How to read the result

  • An OEE figure is only comparable when the planned production time and the ideal cycle time are defined the same way. Compare a machine with itself over time, not with other plants.
  • The percentage is the summary, the lost minutes are the work list. Rank stops, speed losses and quality losses in minutes and attack the largest.
  • Raising OEE only pays when the extra output is needed or the freed time is used. On a machine without demand, a higher OEE just builds inventory.