OEE Calculator
Overall equipment effectiveness from one shift: availability, performance and quality, plus the minutes lost in each of the three.
Enter your figures and select Calculate. The fields are prefilled with a worked example.
How to read it
How it was calculated
Please confirm your newsletter subscription via the link in your inbox.
The formula
Use this calculator when you want to know how much of the planned time a machine turns into good parts, and which loss is the largest.
OEE = Availability × Performance × Quality
Availability = Run time / Planned production time
Performance = (Ideal cycle time × Total parts) / Run time
Quality = Good parts / Total parts
Worked example
Inputs
- Planned production time: 450 min
- Stop time: 60 min
- Ideal cycle time: 30 s per part
- Total parts produced: 700 parts
- Good parts: 665 parts
Calculation
- Run time = 450 min - 60 min = 390 min
- Availability = 390 / 450 = 86.7%
- Performance = (30 s × 700 parts) / (390 min × 60) = 89.7%
- Quality = 665 / 700 = 95%
- OEE = 86.7% × 89.7% × 95% = 73.9%
- Losses: stops 60 min, speed 40 min, quality 17.5 min
Result
OEE: 73.9%. 73.9% of the planned time became good parts at ideal speed. That is above the usual range of 55 to 70 percent; 85 percent is the frequently quoted mark for very good lines. The largest loss is stops with 60 minutes: start there.
How to read the result
- An OEE figure is only comparable when the planned production time and the ideal cycle time are defined the same way. Compare a machine with itself over time, not with other plants.
- The percentage is the summary, the lost minutes are the work list. Rank stops, speed losses and quality losses in minutes and attack the largest.
- Raising OEE only pays when the extra output is needed or the freed time is used. On a machine without demand, a higher OEE just builds inventory.
- MTBF, MTTR and Availability
Reliability in three figures: the average running time between failures, the average repair time and the technical availability that follows.
- Cycle Time and Line Capacity
Checks whether a line can meet demand: capacity from the slowest station, load against demand and the number of operators from the work content.