A plant for electric drive units holds EUR 3.65 million of purchased parts. That is 73 days of consumption. In the same plant, assembly reports 38 stockouts per month, and only 91 percent of production orders start with all parts available.
Five types of stock
Every unit in a warehouse belongs to one of five types. Four of them can be calculated.
- Cycle stock exists because you order in lots, not piece by piece. On average, half an order quantity is on the shelf.
- Safety stock exists because demand and lead time vary. Its size follows from the service level you want and from the variation you measure.
- Pipeline stock is on the truck, in goods receipt or in inspection. It equals demand multiplied by the time on the way.
- Anticipation stock is built for a known event: a seasonal peak, a shutdown, a supplier change. It has a start date and an end date.
- Unplanned stock is everything else. Old parameters, large minimum quantities, engineering changes, booking errors. Nobody sized it, and this is where the reduction is.
The first four are decisions. The fifth is what happens when nobody decides.
What stock costs
Stock ties up money, and it costs money every year it lies there. A typical structure for purchased parts in a manufacturing plant:
| Cost of holding stock | Percent of stock value per year |
|---|---|
| Capital tied up | 8 % |
| Space, handling and equipment | 5 % |
| Obsolescence, damage and loss | 5 % |
| Insurance and administration | 2 % |
| Holding cost rate | 20 % |
Agree the rate once with your controller and use it everywhere. At 20 percent, the EUR 3.65 million of the example plant cost EUR 730,000 per year.
What a stockout costs
The other side of the scale is the shortage. When the inverter module is missing, six operators of the assembly cell wait or are moved for four hours, a courier brings the parts, and the planner rearranges the week. That is EUR 1,910 for one event, before a single late delivery is counted.
The safety stock that prevents it costs EUR 5,434 per year. Three stockouts a year cost more.
Only stock value appears in the monthly report, so the usual reaction is a cut across the board. It removes the fast items first, and the shortages follow.
Stock hides problems
High stock lets a plant live with late suppliers, quality rejections, long changeovers and wrong records. That is why it grows without anyone asking for it.
It also explains why the sequence matters. First calculate what the present conditions need, item by item. Hold exactly that. Then improve the conditions: delivery reliability, lot sizes, record accuracy. Each improvement lowers a parameter, and the stock follows.
Where to start
Take one item group that one planner owns, 30 to 80 items. In the example it is drive family D3 with 40 purchased items, EUR 2.38 million of yearly consumption and EUR 465,498 of stock.
Once every item has a reason and a calculated quantity, the pilot group shows a pattern that almost every warehouse shares. Twenty-four of 40 items hold more than their maximum. Four must be reordered today. Four have had no demand for a quarter. The total is close to right, and almost every item is wrong.