The hands are shaken, the room empties. A result that is not written down exists twice, once in each head. A result that is not checked exists until the first invoice.
One page before you leave
At the end of the talk about the housing H-40, the lead read every point aloud and wrote it on one page that both sides initialed.
| Point | Agreed |
|---|---|
| Price | EUR 25.80 per unit from 1 January, fixed for 12 months |
| Volume | 43,200 units committed for the year |
| Term | 24 months, index rule for year two still to be worded |
| Delivery | Every two weeks, 1,920 units |
| Quality | Measurement report with every batch |
| Payment | 60 days, unchanged |
Within two working days the result memo goes to the other side with a request for confirmation. Each point has a start date and an owner on both sides. Contract wording, the index rule and the signatures go to the people who own them. They are check points, not table talk.
Then tell everyone who has to act: planning, logistics, quality, incoming goods and accounts payable. A price that is not in the system does not exist.
The implementation check
Every agreed point gets a check with a due date. For H-40 there were eight. Seven were closed after ten weeks, one was still open: the inspection plan at incoming goods had not yet been changed.
One check paid for all the others. The first invoice in January showed EUR 26.10 instead of EUR 25.80. Nobody had cheated. The supplier’s system still held an older offer. The credit note for 1,920 units came to EUR 576. Unchecked, the difference of EUR 0.30 would have cost EUR 14,400 over the year.
The review
Within two weeks, the people who were in the room meet for twenty minutes. Four questions are enough.
Result against target and limit? The equivalent price of the package was EUR 25.90, the target EUR 25.75, the limit EUR 26.70. Target attainment is (26.70 - 25.90) / (26.70 - 25.75) = 84 percent. Zero means the limit, 100 the target.
Were our assumptions right? Planning security and batch size yes, payment no.
What did the package add? Against a deal in the middle of the zone, EUR 12,000 a year for us and EUR 31,200 for the supplier.
What do we change next time? Ask for the cost drivers in writing before the talk. Value the topics with planning one week earlier.
A review without a change for the next negotiation was a meeting.
The register
Every negotiation above an agreed annual value gets one line: date, partner, subject, limit, target, result, target attainment, whether a preparation sheet existed, how many topics were on the table, whether the result was confirmed in writing and checked, and one lesson.
After one year the register of the pump manufacturer held eight negotiations: four with suppliers, two with customers, two internal.
| Negotiations | Number | Average target attainment |
|---|---|---|
| With a preparation sheet | 5 | 64 percent |
| Without a preparation sheet | 3 | 25 percent |
| All | 8 | 49 percent |
The register is not a ranking of negotiators. It shows what preparation is worth in the company’s own numbers and where the next person can start.
Four key figures
- Target attainment per negotiation and on average.
- The amount avoided against the first demand: EUR 52,800 a year for H-40.
- The joint gain of the package: EUR 43,200 a year.
- The number of concessions without a return in the log: zero.
Review them twice a year with management, and change the preparation sheet by what they show.
What to take away
One page at the table, a memo within two days, a check for every point, a review within two weeks and one line in the register. Together with the preparation, the package and the log, it turns negotiating from a talent into a method.