Skip to content
OKR | Part 5 of 10

Health Metrics Keep OKR Honest

Operations teams carry a full daily business. Separating health metrics, OKR and initiatives is the key to OKR that work on the shop floor.

A production team leader writes the first OKR draft and ends up with nine objectives: safety, output, scrap, absence, 5S, changeover time, first pass yield, training and the new line. All important. All on the list. The result is a goal list, not a choice.

The way out is not to drop the daily business. It is to give it a different home.

Three lists

Every operations team needs three lists, and each one has its own rhythm.

List What is on it Example in a warehouse Reviewed
Health metrics Five to ten numbers that must stay in range Lost time incidents, inventory accuracy, overtime share Daily or weekly on the board
OKR Two or three objectives with key results Ship complete and on time without firefighting Weekly check-in
Initiatives The work that moves the key results Second scan at packing, carrier slot booking In the team meeting

Health metrics have a range rather than a target. Inventory accuracy above 98.5 percent, overtime below 6 percent, scrap below 1.2 percent. As long as a number stays inside, the team does not discuss it. When it leaves the range, the normal countermeasures start: a problem solving loop, an escalation, a short action.

When a health metric becomes an OKR

A health metric moves into the OKR list when it stays out of range and the normal countermeasures do not bring it back. Then it needs a real change, not more of the same.

In a plant that builds electric drive units, supplier on-time delivery was a health metric for purchasing with a lower limit of 92 percent. It dropped below that limit for two months and caused eleven line stops in one quarter. Purchasing made it an objective for the next quarter: stop missing parts from stopping our lines, with line stops from 11 to 3 and weekly delivery data from the ten main suppliers.

When the number is stable again, it returns to the health list. OKR are temporary by design.

The capacity question

Operations teams cannot spend half their time on change. The plant must still ship, produce and maintain. Agree openly how much time the team has for OKR beyond the daily business. In many operations areas it is 10 to 20 percent.

If the OKR need more, something on the list of normal work must stop or slow down. Write it down. A short “not this quarter” list is one of the most useful documents of OKR planning, because it makes the trade-off visible to the leader.

On the board

Put both on the shop floor board, in two clearly labeled areas. Health metrics with their range and a simple in or out mark. OKR with start, target, current value and confidence.

The daily meeting looks at the health side. The weekly check-in looks at the OKR side. When the two are mixed on one chart, the daily business always wins, because it is more urgent. Separating them is what gives the change a chance.

Newsletter

One Lean idea.
Every week.