A review is decided before it starts. If expectations were written down in January and feedback was given during the work, the review holds nothing new. It adds the summary, the rating and the plan. In the example area, each of the 60 people has two reviews per year, a mid-year review in June and a year-end review in December, 60 minutes each.
One week before
Both sides prepare with the same questions.
The employee receives a self-assessment sheet and the own goal sheet. For each goal: what was the result, and what did I contribute? For each criterion: which level do I see, and which example shows it? What went well, what was in my way, what do I want to learn? And one question in the other direction: what should my leader do more of, and what less?
The leader collects the results per goal with numbers, the notes from the monthly check-ins, the feedback notes of the period and two or three examples per criterion, then proposes a level.
A simple test protects against the most common error. Look at your examples. If more than half are from the last six weeks, go back to the notes of the first months before you propose anything.
Which personal data may be used for a review is a checkpoint for the personnel department.
Sixty minutes in a fixed sequence
| Step | Minutes |
|---|---|
| Open: purpose, time and sequence | 5 |
| The view of the employee: self-assessment first | 10 |
| Goals and results: target, result, evidence | 15 |
| Behavior and cooperation: observations with their effect | 10 |
| Rating and reasons: a level per criterion | 10 |
| Development and next goals | 10 |
Two rules carry the sequence. The employee speaks first, because a person who has already heard the verdict stops thinking aloud. And the facts come before the judgment: agree on what happened before you discuss what it means.
The setter at mid-year
The setter of team 3 had three goals. At mid-year the changeover on his machine group was at 38 minutes, the target. Two operators were released at the measuring station. Scrap after changeovers stood at 2.2 percent against a target of 1.8.
Both rated five criteria on levels from 1 to 4, where 3 means fully at the expected level:
| Criterion | Self | Leader |
|---|---|---|
| Results | 3 | 3 |
| Quality and safety | 4 | 3 |
| Reliability and standards | 3 | 4 |
| Cooperation | 3 | 3 |
| Improvement and learning | 4 | 3 |
With a weight of 40 percent for results and 15 percent for each other criterion, the self-assessment gives 3.30 and the leader’s view 3.15. The conversation is about the three differences, not about the second decimal. On quality, the leader pointed to three rejected first parts in April. On reliability, he rated higher than the setter himself: the late shift had confirmed complete written handovers since February.
Difficult messages
- A level below the self-assessment. Say the level and the reason in two sentences. Then ask for the view of the employee and listen.
- A much higher self-assessment. Go to the examples: “Tell me about a situation where you showed that.” Compare evidence, not opinions.
- Disagreement to the end. Write the different view into the record. Agreement is not a condition for a clear message.
Questions about pay, grading or the contract are not decided in the review. The leader names who answers and by when.
Listening
In a good review the employee speaks at least half of the time. Open questions help: what, how, what else. “Why” sounds like an accusation.
The record and the days after
The record holds target, result and comment per goal, a level per criterion with one reason each beside the self-assessment, one to three development actions with owner and date, and the comment of the employee in the own words. Both sign that the conversation took place, and the employee receives a copy.
Within one week the leader asks one question: did anything in the rating surprise you? In 2026, 14 of 33 people said yes. At the end of 2027, 4 of 58 did.