Skip to content
Recruiting and Onboarding | Part 6 of 8

The Onboarding Plan: Day One, Week One and the First 90 Days

How a prepared first day, a buddy, a 90-day plan with learning goals and three feedback talks bring a new hire to full performance.

Four of the fifteen people who left the example plant in their first year after starting in 2025 gave the same reason: nobody had shown them anything properly. They were handed to the shift and counted as a full operator after two days. The plant had spent EUR 6,500 to hire each of them and nothing to keep them.

Day one

The first day decides what the new hire tells people at home. The plant gave it a fixed plan.

At 05:45 the buddy waits at the gate, with locker key, workwear and badge. At 06:15 the shift leader welcomes the new hire at the board and introduces the team. At 06:45 follows the safety instruction for the area and the cell, with emergency stop and escape routes shown at the place. At 08:00 the buddy walks the flow of the product. From 09:30 the new hire is at the own workplace with the trainer, watching and doing the first steps to the work instruction. At 13:15 the shift leader takes ten minutes: how was the day, what is the plan for tomorrow?

The buddy

The buddy is an experienced colleague of the same shift who volunteers. Not the leader, and not always the trainer. The buddy is there for everything that is in no instruction: where to eat, whom to ask, how the shift works. The role takes 24 hours in 90 days, planned in the roster. For 39 new hires in 2026 that cost EUR 42,120.

Instruction at the stations itself follows the four-step method described in the series on the skills matrix and training on the job.

The 90-day plan

What the job profile lists under “can be learned” becomes learning goals with dates. Each goal says what the person can do and how it is seen. The plan of one machine operator in cell 4:

When Learning goal
Week 1 Loads and unloads machine 4.2 to the work instruction under supervision
Weeks 2 to 4 Runs machine 4.2 alone at 60 percent of the standard output
Days 31 to 60 Runs machine 4.2 at 85 percent, is trained on machine 4.3
Days 61 to 90 Runs both machines at the standard output for two weeks in a row

The full plan has 17 lines, with a responsible person for each: shift leader, buddy or trainer. It belongs to the new hire, who brings it to every talk.

At the end of week one the shift leader sits down for fifteen minutes with three questions: what was good, what is unclear, what is missing? What is missing is there on Monday.

Three feedback talks

After 30, 60 and 90 days the shift leader and the new hire talk for thirty minutes, in a room, with the plan on the table. The new hire speaks first.

Day 30. Does the job match what we told you? What do you need from us? Anything that differs from the ad is corrected or explained.

Day 60. Where are you safe, where not yet? How is the work with the shift and the buddy? The release for the first station is entered in the skills matrix.

Day 90. Are the goals of the plan reached? What comes after the plan?

Both sides give feedback: the second question of every talk is what the plant should do differently. The decision before the end of a trial period and its form are matters for the personnel department.

The result

Full performance means standard output and quality at the own station without help for two weeks in a row. In 2025 new hires needed 26 weeks to get there, in 2026 they needed 16. Of 113 feedback talks due in 2026, 105 took place on time, 93 percent.

Newsletter

One Lean idea.
Every two weeks.