Certificates are easy to count. Many companies can tell how many green belts they have trained. Far fewer can tell how much money those belts have saved and whether the savings held.
A program is more than training. It is a portfolio of projects, people with time, and managers who decide.
The roles
| Role | Does |
|---|---|
| Champion | Selects projects, removes barriers, decides at tollgates |
| Black belt | Coaches green belts, runs complex projects, teaches |
| Green belt | Runs one project next to the daily job, 20 to 30 percent of the time |
| Yellow belt | Team member, collects data, knows the basics |
| Process owner | Owns the result and the control plan after handover |
The champion is the role that most often fails. A champion who delegates tollgates, does not protect the belt’s time or never asks the controller to confirm savings turns projects into side activities.
Time is the budget
A green belt project needs about one day per week for four to six months, plus coaching every two weeks. If that time is not in the calendar, agreed with the belt’s manager in writing, the project will lose against the daily business every time.
Steer the portfolio
Four measures are enough for a steering review:
- confirmed savings per year, confirmed by the controller,
- projects through each tollgate on time, a measure of decisions and time,
- results held after six months, a measure of Control,
- cost of poor quality as a share of sales, a measure of choosing the right problems.
Savings estimated by the project team are a forecast. Only confirmed savings belong in the result.
Lean and Six Sigma
Lean removes waste and shortens lead time. Six Sigma reduces variation. Most processes need both, and the order matters:
- Long lead time, stock, waiting: start with Lean, the value stream and flow.
- Defects with unclear, interacting causes: start with Six Sigma.
- Unstable processes with frequent stops: first basic stability with standard work and maintenance. Statistics on chaos are wasted.
In the pump housing example, the machining cell was the bottleneck of the value stream and lost 1.2 percent of its output to oversize bores. Six Sigma came first, because every reject cost bottleneck time. Once the cell was capable, a pull loop with a smaller buffer cut the lead time.
A twelve-month start
- Months 1 to 3: cost of poor quality list, champion named, two green belt projects with a coach.
- Months 4 to 6: projects through Improve, gage studies for all critical characteristics.
- Months 7 to 9: control plans live, next four projects selected by score.
- Months 10 to 12: portfolio review, an internal trainer, and a check of the whole program.
A small program that delivers two confirmed results in six months builds more trust than a large training wave. Start with the projects, and let the belts grow with them.