What a standard time contains, how to break an operation into elements, how to time fifteen cycles and what to do with the one that was interrupted, how to rate a pace and document the allowances, and how the finished times become net capacity and a named bottleneck. The Starter Kit takes one area through the first 30 days, with a worked example whose six station times sum to exactly the old total and are wrong at every station, and a ready-to-use Excel sheet that recalculates every step.
What's inside
- Work Measurement and Capacity Quick Start Checklist
- Starter Kit Guide (10 pages)
- Time Study Sheet (Excel, 7 sheets: setup, time study with mean, spread, outliers and precision, allowance calculator, standard times, capacity with the bottleneck, status)
- Read Me and License