Skip to content
Shop | Work Measurement and Capacity

Work Measurement and Capacity Starter Kit

Checklist, 10-page guide and Excel time study sheet for the first 30 days in one production area.

What a standard time contains, how to break an operation into elements, how to time fifteen cycles and what to do with the one that was interrupted, how to rate a pace and document the allowances, and how the finished times become net capacity and a named bottleneck. The Starter Kit takes one area through the first 30 days, with a worked example whose six station times sum to exactly the old total and are wrong at every station, and a ready-to-use Excel sheet that recalculates every step.

What's inside

  • Work Measurement and Capacity Quick Start Checklist
  • Starter Kit Guide (10 pages)
  • Time Study Sheet (Excel, 7 sheets: setup, time study with mean, spread, outliers and precision, allowance calculator, standard times, capacity with the bottleneck, status)
  • Read Me and License
Newsletter

One Lean idea.
Every two weeks.