Produce times you can defend and turn them into a capacity statement with a named bottleneck. 8 parts in three blocks, from the element breakdown and the time study to rating, allowances, work sampling, the standard time register, capacity and six key figures.
Every planning number in a plant stands on a time. The quotation, the product cost, the capacity plan and the takt of a line all read the same figure, and in most plants nobody can say where that figure came from, who rated it or when it was last checked. This series produces times that survive the question. One worked example, an assembly and test area for hydraulic control blocks with six stations and a program that grows from 44,000 to 52,000 units, runs through the whole sequence: six station times from 2019 that sum to the right total of 14.10 minutes and are wrong at every single station, an element breakdown and fifteen timed cycles that give 150.4 seconds with a spread of 2.6, a rating of 95 and a documented 13 percent of allowances that make 2.83 minutes, and 1,200 work sampling observations that turn a guessed availability into a measured utilization factor of 80 percent. Those times then build the capacity: 165,600 net minutes per station per year, a load of 105.5 percent at the test bench, an area capacity of 49,285 units against a program of 52,000, and a EUR 95,000 investment request for the wrong station withdrawn. Methods of predetermined motion times such as those offered under the names MTM and REFA are explained in principle only and are not reproduced here. All rating levels and allowance values in the example are freely chosen example values, and nothing in the series is legal advice: working time rules and co-determination are named as checkpoints for the responsible function at your site. The program and its sequence belong to production planning and control, head count and shift models to workforce planning, the standard work sheet and the takt to standard work, and the rates to cost and controlling.
Block 1Measure the Work
Block 2Other Ways to a Time
Block 3From Times to Capacity
No part found. Try a shorter word.