LANGUAGE OF LEAN

The Language of Lean Lukas Breucha The Language of Lean Lukas Breucha

FLOW

Flow is one of the key principles of Lean, and it refers to the smooth, uninterrupted progression of work from one step to the next.

Flow is an essential aspect of Lean Management and is closely tied to the value stream of an organization. Lean is a management philosophy that emphasizes the elimination of waste and the creation of value in all areas of a business, from the production floor to the office. Flow is one of the key principles of Lean, and it refers to the smooth, uninterrupted progression of work from one step to the next.

The value stream is the series of activities that a company performs to deliver its products or services to customers. It includes everything from the design and development of a product to the delivery of that product to the customer. The goal of Lean is to optimize the value stream, eliminating waste and ensuring that the flow of work is as efficient as possible.

To achieve flow, Lean experts focus on creating a smooth and continuous flow of work, from the initial stages of design and development to the final stages of delivery and customer service. This requires a deep understanding of the value stream and the identification of any bottlenecks, or areas where work is slowing down or coming to a stop. By removing bottlenecks, Lean experts can increase the speed of work and improve overall efficiency.

One of the key tools used in Lean for optimizing flow is Value Stream Mapping (VSM). VSM is a visual representation of the value stream, showing the flow of work from start to finish, including all the steps involved and the time required for each step. With VSM, Lean experts can identify areas of waste and inefficiency, such as excessive inventory, overprocessing, and wait times.

Another important tool for optimizing flow is Just-In-Time (JIT) manufacturing. JIT is a Lean method that emphasizes the need for production to occur only when it is needed, and no earlier. This helps to eliminate inventory waste and reduces the amount of time spent waiting for parts or materials. JIT also helps to minimize the risks associated with inventory, such as obsolescence, damage, and theft.

Another aspect of flow in Lean is the concept of "pull" production. This means that production should be driven by the demand from customers, rather than by forecasting and forecasting-based production schedules. Pull production helps to ensure that work is only done when it is needed, eliminating the waste associated with overproduction and reducing the risk of obsolescence.

Finally, it's important to understand that flow is not just about efficiency and productivity. It is also about creating a culture of continuous improvement and empowering employees to identify and eliminate waste in their own work. This can be achieved through the use of tools such as Kaizen, a Lean method that encourages employees to identify and suggest improvements to the value stream.

In a nutshell, flow is a critical aspect of Lean Management and is closely tied to the value stream of an organization. By focusing on creating a smooth and continuous flow of work, Lean experts can optimize the value stream, eliminate waste, and improve overall efficiency. Whether through the use of tools such as VSM and JIT, or through a focus on continuous improvement and employee empowerment, flow is a key part of the Lean philosophy and is essential for success in the modern business environment.

Read More
The Language of Lean Lukas Breucha The Language of Lean Lukas Breucha

One Point Lesson

One Point Lesson (OPL) is a method used in the manufacturing industry that can greatly improve operational efficiency and overall quality.

One Point Lesson (OPL) is a method used in the manufacturing industry that can greatly improve operational efficiency and overall quality. This method is often used within the context of Lean Management, which is a strategy that focuses on maximizing value while minimizing waste. As a Lean Management Expert, I will be discussing how OPL can be used to improve operations in the manufacturing industry.

OPL is a simple but effective tool that helps to standardize and spread best practices across an organization. It is a one-page document that summarizes a lesson learned from a problem or improvement opportunity. This document is designed to be easy to understand and share, so that others can learn from the lesson and apply it in their own work. The purpose of OPL is to promote continuous improvement by capturing and sharing knowledge that can be used to prevent similar problems from happening again in the future.

One of the key benefits of using OPL is that it allows for quick and easy dissemination of knowledge and best practices. The one-page format makes it easy for employees to understand and remember the information, and the lessons learned can be quickly spread throughout the organization. This can lead to significant improvements in the quality of products and services, as well as increased efficiency in operations.

OPL can also help organizations to identify and eliminate non-value-adding activities. This is because the lessons learned can be used to identify areas where improvements can be made, and then the appropriate changes can be implemented. For example, if a problem occurs during the production process, an OPL can be created to document the cause of the problem and how it was resolved. This information can then be used to make changes that will prevent the problem from happening again in the future.

In addition to improving quality and efficiency, OPL can also help organizations to foster a culture of continuous improvement. By capturing and sharing knowledge, employees are encouraged to look for ways to improve processes and to find solutions to problems. This leads to a more engaged workforce, as employees feel that their ideas and contributions are valued.

In order to successfully implement OPL in the manufacturing industry, there are a few key steps that organizations should follow. Firstly, it is important to have a clear understanding of what information should be included in each OPL. This includes the problem or opportunity that was identified, the cause of the problem, the solution that was implemented, and the results of the solution.

Secondly, organizations should develop a system for sharing OPLs throughout the organization. This could be done through regular meetings, email, or an online platform. The key is to make sure that the information is easily accessible and can be quickly shared with others.

Finally, organizations should ensure that they have the resources in place to support the implementation of OPL. This includes providing training to employees on how to create and use OPLs, as well as having dedicated staff to manage the process.

In a nutshell, One Point Lesson (OPL) is a powerful tool that can help organizations in the manufacturing industry to improve quality, efficiency, and overall operations. By standardizing and spreading best practices, organizations can foster a culture of continuous improvement and identify and eliminate non-value-adding activities. To successfully implement OPL, organizations should follow a few key steps, including having a clear understanding of what information should be included in each OPL, developing a system for sharing OPLs, and ensuring that they have the resources in place to support the implementation.

Read More
The Language of Lean Lukas Breucha The Language of Lean Lukas Breucha

Rapid Improvement Event

Rapid Improvement Events, also known as Kaizen events, are a powerful tool for improving production processes in every industry.

Rapid Improvement Events, also known as Kaizen events, are a powerful tool for improving production processes in the manufacturing industry. They are focused, short-term initiatives aimed at solving specific problems and improving processes in a rapid and efficient manner.

At the heart of a Rapid Improvement Event is the involvement of a cross-functional team of employees, each bringing a unique perspective and skillset to the table. The team works together to identify and solve problems, test new ideas, and implement solutions that can have an immediate impact on the production process.

One of the key benefits of Rapid Improvement Events is the speed with which they can deliver results. By focusing on a specific problem and working together as a team, significant improvements can be made in just a few days or weeks. This can be especially valuable in the manufacturing industry, where time is often of the essence and even small improvements can make a big difference.

To ensure the success of a Rapid Improvement Event, it's important to follow a structured methodology. This typically includes the following steps:

  1. Define the problem and scope of the event. What is the specific issue that needs to be addressed, and what is the desired outcome of the event?

  2. Assemble the cross-functional team. Choose team members who have a strong understanding of the problem and can bring a variety of skills and perspectives to the table.

  3. Conduct a thorough analysis of the problem. Gather data, observe processes, and engage in root cause analysis to understand the underlying cause of the problem.

  4. Develop and implement a plan of action. Based on the findings of the analysis, create a plan of action that addresses the root cause of the problem and implements solutions that will improve the production process.

  5. Implement and monitor the changes. Once the plan of action is in place, implement the changes and monitor the results to ensure they are having the desired impact.

  6. Reflect and celebrate successes. Reflect on the successes of the event and celebrate the improvements that were made.

Rapid Improvement Events are a powerful tool for improving production processes in the manufacturing industry. By bringing together a cross-functional team, focusing on a specific problem, and following a structured methodology, organizations can achieve significant improvements in a short amount of time.

In a nutshell, it is important to embrace a continuous improvement mindset and actively seek out opportunities to improve production processes. Rapid Improvement Events provide a structured and efficient way to do just that, delivering results that can have a lasting impact on an organization's success.

Read More
The Language of Lean Lukas Breucha The Language of Lean Lukas Breucha

Mura

A traditional general Japanese term for unevenness. It is the waste of variation in the production process.

Mura, one of the three types of waste in the Toyota Production System, translates to "unevenness" or "inconsistency" in English. It refers to the irregularity in the flow of work, causing fluctuations in capacity and production. Identifying and removing Mura is essential for creating a steady work pace and optimizing resources.

One of the main causes of Mura is multitasking. When team members are constantly switching between tasks, they often lose focus and efficiency, leading to unevenness in the workflow. This results in longer lead times, increased inventory, and higher costs.

Another cause of Mura is overproduction. Producing more than what is needed, whether it's goods or services, creates an imbalance in the system and results in unnecessary inventory. This not only ties up valuable resources but also increases the risk of defects and rework.

To handle Mura, one must first understand the root cause of the unevenness. This can be done through value stream mapping, a tool that visually represents the flow of work and helps identify areas of waste. By analyzing the current state of the process, one can identify the steps that are causing Mura and implement solutions to eliminate them.

One effective solution is to implement a pull system, also known as "kanban" in Japanese. This system ensures that work is only produced when it is needed, eliminating overproduction and promoting a steady flow of work.

Another solution is to implement standard work. By standardizing the work process, team members are able to work consistently and efficiently, resulting in less Mura. This also helps in identifying and addressing any abnormalities that may occur in the process.

Additionally, involving the team members in problem-solving and continuous improvement activities can lead to increased ownership and accountability, leading to a reduction in Mura.

Implementing a pull system, standard work and involving team members in problem-solving and continuous improvement activities can help organizations to create a steady flow of work and optimize resources.

It's important to note that Mura is not a problem that can be solved once and for all. It's a continuous effort and requires constant monitoring and improvement. Regularly conducting value stream mapping and Gemba walks, where one goes to the place where the work is done to observe and understand the process, can help in identifying and addressing Mura.

In conclusion, Mura is a key concept in lean management and must be addressed to ensure a steady work pace and optimize resources. By understanding the root cause of Mura and implementing solutions such as pull systems, standard work, and involving team members in problem-solving and continuous improvement activities, organizations can achieve the goal of smooth and well-organized workflow.

Read More
The Language of Lean Lukas Breucha The Language of Lean Lukas Breucha

Kanban

The material in the Kanban System is exclusively oriented to the consumption of your production process.

In this article we want to talk about another classic from Lean Management Kanban or the so called Pull System.

The word Kanban itself has its roots in the Chinese Japanese language and means card, label or sticker. In industrial manufacturing planning systems or general in logistics control Kanban describes a replenishment system for consumed parts according to the amount used steered by cards that give the signal following the Pull Principle.

The material in the Kanban System is exclusively oriented to the consumption of your production process. The cards are a key element of this kind of control system and provide proper information transfer. Kanban control loops from the work station of flexible production control and serves to smooth material flow through your inbound or even outbound logistics. In addition Kanban serves you to implement a sustainable reduction of material stocks, increases the ability to deliver and saves you pure cash.

In an ideal world Kanban would control your entire value chain from the supplier to the end customer. In this way you would have installed an complete smooth supply chain with almost no chance of interruption and massive stocks. And now comes the but – to steer production with Kanban – a continuous monitoring is required for a smooth material supply. To make it short: it requires discipline from all involved parties along the supply chain.

Lets have a look to the development of Kanban.

The first Kanban System was developed by none other than Taiici Ohno (of course) at Toyota Motor in the 1940s. One of the main reasons for the implementation of Kanban was the low productivity and efficiency of Toyota compared to western competitors. With the Kanban System, Toyota achieved a significant change towards flexible and efficient production control that had a massive impact on productions output while at the same time reducing the costs for inventory in raw material, work in progress (WIP) and finished goods.

To give the complete picture it wasn’t implementing the Kanban system itself to drive the success of Toyota, there are other key factors that together where making the difference. Just to name Just in time as an example of key elements of the Toyota Production System. It is and always will be a combination of different methods and philosophy that brings you forward.

In the 1970s the Kanban Concept was adapted in the industry in the USA and Germany. As they haven’t known better, they pretty much copied the complete Toyota Production System (TPS) in order to get the principles running.

Pull or Kanban System

Either way you call it, the material flow is controlled by boxes or cards. Kanban Cards serving in a simple way all information needed to identify what parts are needed in what quantity at what place. The amount typically is defined by the replenishment time at the work station. With the so called two box principle you make sure that the operator never runs short on components. Nowadays there are also digital version of it called eKanban, but the principle behind is the same. The trigger of supply is the Kanban Card starting of the pull chain of material.

To use Kanban efficient, it is not suitable for all parts. Kanban is perfect for small parts with a small amount of variants and a consistent demand. For this reason, you’ll see Kanban Systems in the industry mostly used for C-Parts management. The rest of the components are steered with the support of MRP. Only in rare cases you find that even the supply of big components are controlled with the Kanban methodology.

One nice side effect with Kanban, you can set up the way you can steer your bottleneck. That means, when you have done a proper value stream analysis you know the capacity for your bottleneck and will only order what this process step can handle.

Read More
The Language of Lean Lukas Breucha The Language of Lean Lukas Breucha

Poka Yoke

Poka Yoke are all mechanisms that prevent unplanned mistakes from happening.

Poka-Yoke is any mechanism that helps to avoid unplanned mistakes. Poka-Yoke is that the application of straightforward, error-proof mechanisms to systematically avoid incorrect assembly, mix-ups or the downstream movement of defective parts. As a result of stable and high-quality methods begin long before the assembly section, simple Poka-Yoke measures will be enforced preventively within the construction and coming up with phase to make sure quality. Poka-Yoke is implemented to avoid: going away out or forgetting process steps, process or operational-related mistakes, incorrect or missing parts, setup or installation errors.

POKA YOKE ポカヨケ ("stupid mistakes - avoidance") is associate ideology that takes a spread of approaches to optimize production processes, particularly assembly. The main target of Poka-Yoke is strive for zero-defect production and to attain it approximately. If defects are detected, the cause is determined. If the cause can be avoided, it's eliminated pretty much as good as doable within the sense of Poka-Yoke and at the best doesn't occur again at all. Poka-Yoke was originally an initiative of Dr. Shingo, Shigeo (新郷 重夫), who is additionally a co-founder of the Toyota production system, of that Poka-Yoke is a core component. Poka-Yoke is beneath the umbrella of Kaizen 改善 ("continuous improvement for the better").

Poka-Yoke may be about recognizing the root causes in time and so eliminating them. Mistakes shouldn't solely be corrected, however prevented the in the longterm by eliminating their root causes. Within the ideal case, in the sense of Poka-Yoke, there are measures that utterly rule out a discovered error by eliminating the cause in the future, e.g. as a result of incorrect mounting is not any longer doable because of fixed given mounting ways (e.g. fitting shapes). Poka-Yoke demands product style ability to make a product design that forestalls errors (avoid incorrect operation) and is powerful against errors (despite incorrect operation no faulty processes). Thus the philosophy of Poka-Yoke doesn't solely begin within the production, however already in the product design.

A widely known everyday example is that the plug of the electric devices and the power outlets, that can't be inserted into the socket the incorrect way round. Measuring instruments may also be designed or programmed in such a way that they will not be misused. Poka-Yoke principles can also be found in other cases, e.g. ATMs dispense your credit card before the payout takes place. Fuel dispenser faucets solely work into the right tank for diesel or petrol, creating it tougher to refuel incorrectly. And so on.

Looking at Poka-Yoke in production "Nobody makes any mistakes" is the target of the Poka-Yoke methodology. Here a list of some mistakes that can typically be found in production:

  • Incorrect positioning of assembly components

  • Incorrect change of a die

  • Incorrect mounting

  • Wrong interpretation of directions

  • Incorrect polarity in electrical connections

  • Incorrect reading of measured values

  • Incorrect connection of hoses

  • Incorrect entries in devices

  • Assembly of wrong components

  • Skipped operations

  • Operation/programming errors on machines

POKA YOKE follows three simple steps
Measurement:

If you can’t measure you can’t control. Simple fixtures or sensors up to high performance camera systems can support the right execution of processes and provides feedback about the correct or incorrect task completion. Measures can be taken by cameras, mechanical, sensor for light and colors, position, vibration, voltage or temperature.

Detection of deviation:

E.g. deviations are determined by checking the amount of tasks done during one operation - has had the operator enough movement to do the job? Are enough components used? (actual-target comparison). Or simple exploitation geometric mismatches when pins or special marking at the workstation are still visible or not used.

Regulation

When deviations occur make sure that measures are taken such as pulling the ANDON CORD by the so called stop the line authority. Only when error-causing steps are cancelled out a permanent production of OK parts can be achieved.

Only when living according to the Poka-Yoke philosophy on a daily basis and following the principles of Poka-Yoke you will be able to achieve with smart automation and trained operators long term success. Root Cause Analysis and sustainable counter measurements are key. In addition each operator should be trained to detect their own faults during operation.

It might seam to be waste to train operators to detect failures, but no matter how much you planing and effort you put in design, failures occur during assembly or manufacturing. Just think about wiring that is now crossing moving components, parts where the collision was not seen during design and so on, trust me the list can be endless. Some failures will be detected with smart automation checking devices. But these are typically very costly and need special trained people to maintain and most of the time these little pieces of technology can only do one job. Here joins Poka-Yoke the game. Cost efficient, failures or incorrect assemblies can’t be passed on and each operator develops an eye for deviation.

Just keep in mind that if you have mass production or small to middle series can determine if you should install a 100% check or if simple Poka-Yokes can get you where you want.

The most important part of Poka-Yoke at all is that failures are detected when they occur and the exponentially rising costs of defective parts passed on are prevented.

Read More
The Language of Lean Lukas Breucha The Language of Lean Lukas Breucha

Milkrun

The Milkrun is the preset intralogistics concept to bring raw material, semi finished and finished goods to the place they belong at the time they are needed.

The Milkrun is the preset intralogistics concept to bring raw material, semi finished and finished goods to the place they belong at the time they are needed. The Mikrun is implemented based on existing consumption values, an internal supply cycle is defined in which deliveries on fixed routes are installed with specific times.

Based on these current consumption values, a logistic supply cycle is defined wherein raw material, semi and finished goods are delivered and picked up by a fixed route at a specific time. With this you will also optimize your intralogistics concept in general taking on action for a Milkrun concept.

So what is the idea behind the Milkrun concept.

The term Milkrun comes from the traditional milkman that was supplying milk to homes on a fixed route in a specific time. The milk delivery was based on the consumption of the households, by this only the amount of milk needed was delivered. Empty bottles have been picked up at the same time and brought back to the distribution center. So quite simple full bottle(s) delivered, empty bottle(s) picked up.

The cross company Milkrun
Nowadays the material management got a little bit more complex. Speaking in the external way of logistics a Milkrun is a supplier concept where customers ask for one or more shipping companies to manage different suppliers or customers on after the other in the form of a shipping cycle. In this way, goods and empty containers can be delivered and received at the same time without the need of centralization. The main goal is to have as less as possible empty trucks and at the same time being under full control of external material flow. Tours and deadlines are the guard rails on these cycles, reducing storage space is the nice to have side effect.

The benefits of the Milkrun concept

  • With installing a Milkrun you will be able to reduce shipping times, processing processes and therefore handling costs.

  • Just in Time and Just in Sequence deliveries are possible

  • Your planning is more structured as you will have fixed time frames

  • Less capital needed due to decreasing inventory/stock/WIP

  • You can integrate waste and empty container management

  • Increase of sustainability due to ecologically smarter transportation routes

Of course there are also some challenges with the Milkrun concept

  • Time consuming planning as quantity, duration, replenishment time, etc. needs to be considered

  • Processes and products need constant supply

  • Outbound Milkruns can be delayed by traffic or weather conditions

  • Economically relevant for larger business or higher demands of goods

  • Reliable supplier for products and transport needed

One last note for the internal Milkrun

Inbound the concept can be used in both ways, intralogistics and manufacturing. E.g. certain raw materials or semi-finished goods can be delivered on a regular basis to predefined workstations where the consumption can simply calculated. And on the fixed route the Mizusumashi can collect empty container and waste from production. This reduces internal ways of operators and guarantees a continuous supply of workstations. The next level would be to interlink all workstations or cells with your internal supply cycles to create an intralogistics flow, reducing the manual replenishment work. To find out what the Mizusumashi is just go here. In short: he/she is the guy who supllies goods on the shop floor in a structured process.

Read More
The Language of Lean Lukas Breucha The Language of Lean Lukas Breucha

Sensei

In the lean world a sensei is a lean production expert that transfers his knowledge as mentor on to his mentees.

In the lean world a sensei is a lean production expert that transfers his knowledge as mentor on to his mentees.

To be successful with a Sensei it's been revealed that you need to start at the top and find a sensei to work with in order to engage all employees on the shop floor. As Lean activities reach industrial maturity, the role of the Sensei remains a gray area.

It is obvious that your organization needs a Sensei to adapt and successfully implement Lean principles. Therefore, the Sensei position will be your bottleneck in Lean implementation. In every Lean transformation process, one learns at some point that the success of a company consists in learning to learn.

As a little guide, consider the following three effects:

Learning curve: The learning curve of each department and initiative is tracked by their manager in the organization rather than having to compare it to established best practices across your organization.

Spillover: Effective learning practices are passed through hands-on, experiential learning from person to person within your organization rather than through predetermined processes.

Value-Based: Lean as a whole provides a learning framework that aims to balance customer satisfaction (which leads to organizational success) with employee satisfaction (and personal fulfillment) through a set of principles and tools aimed at discovering how MUDA can be reduced and value can be increased . Adding activities in all areas of the organization.

This approach has both sides of the medal, but the weak and the strength are lying in the learning path of each employee. Following the lean principles, every employee is expected to discover:

What do I need to learn: What is my personal challenge in order to better align my work with customer value and thus sustainable and profitable growth with the satisfaction of all my colleagues to reconcile.

Learning from the shop floor: The learning style is deeply embedded in daily operations. Employees are learning results from their support of learning activities at all levels. Because all employees solve their problems or show initiative, everyone is expected to interpret the conclusions of others and find a way to adopt the solutions to their own work. It is the responsibility of the Sensei to support its learners in this learning phase. Learning by doing is the correct way to describe it.

Create a learning environment for your employees: Learning on the job is never easy, especially in today's business climate. Consequently, one of the key functions of a Sensei in the Lean perspective is to create a visual environment for employees where it is easier to recognize than normal and where opportunities for continuous improvement in small steps (Kaizen in Lean jargon) are clearly visible Everyone. A learning environment also means a stable affective environment where mistakes are not punished but seen as a source of learning.

The Sensei is not a boss at all. He or She has no power and can only suggest. The Sensei's task is to help all employees in your organization to develop their own lean thinking through practical exercises in workshops. The Sensei's job is to convince middle managers that solving today's problems will, in the long run, prevent tomorrow's fires.

The essence of Lean is learning while solving problems. This is a difficult task at the best of times, and indeed every person in your organization must be taught to learn how to learn. In relation to managers, the Sensei has five main roles of support:

  1. Finding problems

  2. Tackling problems

  3. Creating problems

  4. Solving problems

  5. And finally learnings from problems

"If you have no problems, you are dead". is a classic lean principle. Perhaps the most important part of Lean's problem-solving learning approach is the initial problem-finding phase. Lean's approach to business is to capitalize on every problem.

Sometimes you WIN sometimes you LEARN!
— Operations Insider
Read More
The Language of Lean Lukas Breucha The Language of Lean Lukas Breucha

KAIZEN

The mother of all lean terms. The change for good.

KAIZEN the mother of all lean terms.

The word Kaizen is a combination of two Japanese words - KAI meaning change and ZEN meaning good. Kaizen is the epitome of continuous improvement and stands for the “change for the good”. Kaizen for your organization means continuous improvement involving everyone.

All together Kaizen is a collection of simple principles for improving your work but also stands for a management philosophy that has turned manufacturing principles upside down the way organizations think and act. The key of all success is that all employee should constantly critically review their processes and workplaces and improve them every day a little more.

You see Kaizen is a fundamental attitude for all players in your organization that results in high quality processes with zero defects on finished goods. Living Kaizen is the continuous strive to improve, simplify or optimize. This ongoing never ending process is therefore best known as the Continuous Improvement Process (CIP).

You can’t say that Kaizen is a methodology or tool, it is a mindset. I can’t emphasize this enough.

“The message of Kaizen is that no day should go by without any improvement in the company”
— Masaaki Imai

Kaizen does not depend on major innovations or fundamental changes, but on the everyday small improvements of your employees. The multiple suggestions for improvements paired with a rapid implementation mentality will show really fast their effect on success. The term of continuous improvement is fairly said just another way of the old fashioned suggestions scheme or idea management, which has a long history in the industry but less successful communicated and accepted.

To make a little list before writing too much I want to make it short. In order to pave the way for Kaizen thinking, a number of principles are linked to it, which should guide the thinking and behavior of all players in your organization.

  • Daily small improvements in all areas of your organization

  • Avoid any waste of material, time and money

  • Consider all downstream process steps as customers and then improve performance and quality

  • Improvements are always possible, it will never stop

  • Constant improvements are made on a small scale and step by step

  • No restrictions in terms of scope; products, services, processes, activities, technology, workplace - everything can be improved

  • Different methods and tools can be used, the decisive factor is the effect, not the procedure

  • Workplaces, work areas and the situation are viewed "on site", things are viewed and analyzed live (Gemba Walks)

  • with constant improvements, higher and higher standards are set and made the rule

  • Kaizen is a task for all employees in the company

All employees of your organization are directly involved in the Kaizen activities and everyone has to participate. To secure the success of Kaizen each individual should invest an adequate amount of time of their working hours in Kaizen activities and focus on their commitment on improvements. As your organization has different departments and by this different employee groups their Kaizen activities are different as well (e.g.):

  • Top management has to introduce and promote Kaizen as the fundamental principle and drive and monitor its implementation. It creates the right conditions within your organization

  • Middle management implements the requirements of top management and ensures that standards are kept. It also promotes the way of thinking by offering appropriate training

  • Team leaders support employees in developing ideas and implementing them. They are responsible for execution and success confirmation

  • The operators or administrators at the operational level work out concrete suggestions for improvement and implement them. This can also be done in small groups. Kaizen employees improve their specialist knowledge and experience by participating in further training courses.

To give you an example of daily Kaizen routines 5S seems the all time favorite.

You can read the full article on how to implement 5S here. But I will make a short excursion on 5S just to explain the way of thinking. 5S prescribes:

Seiri: Sort out all unnecessary objects

Seiton: Clean-up and correct arrangement of needed objects

Seiso: Keeping the workplace tidy so as to achieve the already established standards through 5S

Seiketsu: Establishing regulations for work standards

Shitsuke: Adherence to the Work standards and continuous improvement

Kaizen is always and everywhere its right to be applied.

Even when most of the people think that it is originally developed and deployed for the automotive industry (best known as the Toyota Production System) with clear mass manufacturing and assembly processes, there is no organization, yours included, that can not improve its performance and quality in terms of customer satisfaction, services, products and processes.

You see Kaizen has become a general way of thinking in all organizations and industries.

Thinking about organizations without Kaizen, you’ll see employees stick to rules and procedures with a “not my task” mentality. Only a few managers have to come up with fundamental long term changes. Kaizen on the other hand stands for the involvement of all employees and that everybody has to think every day what he/she can improve, simplify or optimize in his/her area of work for the “change for the good” of the complete organization, securing the long term success of your organization

Read More
The Language of Lean Lukas Breucha The Language of Lean Lukas Breucha

Point Kaizen

Point Kaizen describes improvement actions concentrated on one workstation = on the spot.

Point Kaizen describes improvement actions concentrated on one workstation = on the spot.

In general, all lean activities are striving to increase the output of your processes by simultaneously increasing the level of quality by shorten lead times and using less resources. But not all lean initiatives are reaching these targets. Typically the cause lies in the lack of clear targets by the management combined with a misinterpretation of kaizen activities and organizational change.

Kaizen is the Japanese term for “change for the better” on a continuous matter. Point Kaizen refers to a compressed focus on one workstation and improvement actions during a few days, where e.g. in the end the station is no more the bottleneck of the line/cell. For many people this is considered as “Lean”, but it is only a small part of the journey to real operational excellence.

As mentioned Point Kaizen is a scheduled event. When you have an own Lean Management Team or Kaizen Manager these are the guys who are in charge for the upcoming days. Once the team is gathered the action starts.

5S all over: Yes! Let’s start! Use the euphoria and sort out, get rid of all unwanted objects. Clean-up and proper arrange tools needed. Install e.g. flow racks following the 2 bin principle to ensure straight material flow. The Kanban System and FIFO can’t be skipped. Once the workstation is transformed - everybody is proud to have been part this lean activity and communicates the success story.

If you continue with Point Kaizen activities you will reach a better performance on each isolated workstation and probably everybody thinks that you have a great lean initiative. But the real long term results are missing out. So why to continue with lean activities?

Take a step back and see what you have so far. With the improvement actions on each workstation you have raised the efficiency of all single steps but didn’t consider the flow of material in between. It might be tiring to put all this effort in and then the management comes along and sees no obvious progress. This is the point when you move from Point Kaizen action to a systematical organizational change. This process is focusing on the underlying targets of the organization, such as raising performance, decreasing lead times, improving quality and making more profit.

The A3 format comes back in the game. Not only the A3-report and A3 problem solving but more the target setting on an A3 format that tells the story of how the targets can be reached by preset measures. Combined with the future state Value Stream Map showing all Kaizen Bursts each representing a Point Kaizen activity. All those measures lead to a future state of material and information flow that drives your organization into new spheres. In the future with the new Value Stream your bottlenecks will shift along this stream and always creating new point kaizen starting points. Bottlenecks by this can be either stocks of material, high process times or a lack of information. All Kaizen activities, no matter concerning material or information flow, are implemented following a prioritized list. You not only will have to reallocate resources, but also actively participate on the process of organizational change. You and your mid-management are in the driving seat, you have to know where your organization is heading, so make sure that you and your management are participating on Kaizen activities.

Point Kaizen is the first brick of the foundation for organizational change. With the systematic identification of bottlenecks, Point Kaizen activities can be planned and conducted. To have quick changes but is still able to deliver, one bottleneck after the other is worked on. Each Point Kaizen delivers one piece of improvement for the overall improvement needed. These superordinate targets are an increased output, reduction of lead times by simultaneously achieving Zero Defects Policy and all this combined with lower labor costs.

Read More
The Language of Lean Lukas Breucha The Language of Lean Lukas Breucha

Quick Response Manufacturing Control

The concept of "Quick Response Manufacturing" (QRM) describes a corporate philosophy which propagates the orientation towards the reduction of lead times as the primary goal of all corporate decisions.

“ Quick Response Manufacturing Control” (QRMC) is a concept developed in the 90’s and describes an organizational philosophy which propagates the orientation towards the reduction of lead times as the primary target of all corporate decisions.

An approach was developed against the backdrop of the thinking that emerged in the 1990s, moving away from specialization and toward strong customer orientation and the resulting process-oriented organization, with the result that the entire organization was fundamentally transformed and aligned to the factor of time. Improved quality, lower prices, and greater responsiveness are accomplished as a result of the company's ongoing focus on the QRMC principles.

The concept of short lead times does not clearly stop when production reaches its limits; rather, all divisions of the complete organization must be incorporated into this strategy and align the targets, as determined by customer needs. Furthermore, this model allows for an outwardly adaptable and quick response to changing customer requirements.

Properties of QRMC

QRMC is distinct from existing "lean management" approaches, which are not in competition with QRMC but rather complementing it.

QRMC is appropriate for usage in businesses where production has the features of a significant number of variants manufactured in small batches with customer-specific characteristics. To make a decision if QRMC is the right approach for your business, see the following matrix.

A paradigm shift from the dominance of cost-based approaches and ways of thinking (e.g. unit costing) to measuring instruments is proposed, with the lead time for customer order fulfillment as the only essential indicator for controlling the overall material flow. It is vital to consistently use the four QRMC core concepts in order to successfully implement the QRMC philosophy in your organization in a durable and broad manner:

  1. Time is crucial

  2. Adaptation of organizational structures

  3. Organizational-wide application

  4. Dynamic toolset

Time is crucial

The common wisdom about work is that the quicker, harder, and greater you work, the more work you accomplish in less time. This mindset is represented in today's control systems, which consider "touch-time" control (value-adding activities) to be the most important component in time efficiency. Because the "touch-time" can be precisely measured without any doubt. And each and every controller assumes: Only what I can measure I can control. However, because touch-time lead times account for only around 5% of all lead time, the cost-cutting potential is modest as most of the time it is already squeezed to a minimum.

Furthermore, no matter what system you look at, the presumption of “faster, higher, further” only applies to a certain point, the break point. See it overstressing the the system. E.g. when the manufacturing input factors (5M) are pushed to their limits, the quality level will drop, toolings will wear out faster or even destroyed, in short: the system will collapse.

But to keep on going, how is the “non-touch-time” (non-value-adding tasks) measured. According the standard, cost-based approach, all expenditures for incoming and finished goods storage are covered including all overhead that is needed on defining processes on how and when a product will be produced. With existing traditional systems, these overhead costs are not really accurate apportioned.

As a rule, overcharges are utilized to spread this cost block among the things. Most of control frameworks don't correspond upward an ideal opportunity to the genuine causes. These overheads, then again, address the costs of time, or all the more explicitly, the expenses of lead times.

QRMC doesn't suggest that upward costs can be allocated all the more effectively, yet rather that more limited lead times mean lower upward expenses. The lead season of associations that attention on a QRMC technique is continually limited, permitting the organization to prosper in market significant numbers (e.g. delivery reliability or delivery time).

It may be challenging trying to begin utilizing QRMC approaches. Toward the beginning of a QRMC project, taking on the QRMC methodology and rules will prompt higher item costs.

The formation of cycle arranged hierarchical units eliminates the division of work into little useful work steps in free handling units (purported QRMC cells). The "autonomous working gatherings" work association standards are utilized in this QRMC cell's rundown steps. Inside the QRMC cell, multi-functional staff has a bigger responsibility, which is addressed in an expansion in "touch-time."

More modest clumps ought to be fabricated, as indicated by QRMC, to upgrade responsiveness. Thus, there are more set-up processes, which raise unit costs. Producing more modest bunches requires a higher recurrence of set-up processes, prompting more noteworthy set-up costs.

How does the lead time consumption influence you in the event that you can deliver on request and not in stock in light of the QRMC drive?

Cost decreases for distribution center terminations, as well as continuous structure uses, staff compensations for material dealing with, and deterioration costs, are completely limited. Notwithstanding these immediate consumptions, managerial expenses, for example, arranging and establish the executives have been brought down essentially.

Inventories ascend in esteem since they are not sold on the grounds that they are not created because of direct client interest.

All things considered, lead times brings down upward expenses. As opposed to the accepted problem of the following expense expansion in customary controlling, an increment in “touch-time" will subsequently bring about a general expense decrease, thinking about hierarchical QRMC structures!

Adaption of organizational structures

With a traditional and capacity arranged construction, an organization working in a confounded and dynamic market environment described by small batches, huge variations, customer specific goods, and intense competition can't achieve the objective of significantly bringing down the lead times. Accordingly, many errands have almost no immediate market reference; the longings of both outer and inner clients are just obscure. Besides, a capacity arranged association is wasteful, with long coordination and choice cycles.

Four areas of activity are determined to meet the points of "responsiveness to the customer" as a vital cutthroat component and leap forward into new aspects as far as adaptability and execution.

  1. Change to cell manufacturing

  2. Group liability rather than hierarchical control

  3. Broadly educated workers > Qualification Matrix

  4. Lead time as key figure

CELL MANUFACTURING

The solid consideration towards customers needs delivers a QRMC cell. This requires the mix of all capacities expected to meet customers assumptions, and henceforth focuses on a painstakingly characterized and limited market and additionally customer target.

Thusly, a QRMC cell involves the express task of man, machine, material, and procedure in a multi-useful structure, as well as their actual mix in one spot. Subsequently, outline work exercises are handled autonomously and completely to make a cell result.

Team responsibility

The drop from a hierarchical organization, in which those in control train e.g. operators what and how they should work, to a self-mindful organization inside a cell, is the following field of activity. Representatives plan and assemble their own corporate philosophies. The notable strategies for autonomous gathering work, like work revolution, work advancement, and occupation growth, come into consideration here. By working autonomously, productivity and product quality are improved endlessly. After totally planned requests have been finished; time is accessible to finish one more part of the QRMC hierarchical design: multi-practical employee qualification.

Multi-Qualified employees

At the point when workers are sick or on vacation, their obligations can be taken over and dealt with by different colleagues. This is the most quick rationale in broadly educating exercises. One more part of "cross functional qualification" is that weariness in positions is killed, and the scope of assignments turns out to be seriously captivating. This inspiration has an unsuitable clarification, however it is considered unreasonably quickly. Other key explanations behind "cross functional qualification" with regards to QRMC includes:

  • Subject to the every day bottleneck, the obligations in a QRMC cell are incredibly adaptable. Various requests might happen at various stations inside the cell, expecting operators to work on an assortment of assignments consistently. The multi-qualified operators upgrade the cell's adaptability, empowering bottlenecks to be kept away from.

  • Advanced machine parks don't constantly request the full focus of operators. Subsequently, the operator should be qualified of handling different machines at the same time.

  • Long-term continuous improvements of process steps inside the QRMC cell are much of the time achieved because of the different work volumes.

Lead times as key figure

To evaluate the cell's performance, the lead time must be utilized and assessed frequently. Overhead costs can only be lessened by concentrating on lead times and the consequent suffering pressure to lower it.

The lead time is defined as the major goal as a result of this knowledge. On the 2nd layer, standard indicator systems and performance indicators do not need to be updated; instead, they operate as assistance and control function. The QRMC number can support this targeted orientation on cell level.

The following formula is used to compute the QRMC number:

Q "RM - Number "= "Lead Time reference period" /"Current Lead Time" ×100

Two points must be predetermined for a sufficient implementation of this new measurement technique:

  1. To commence, the cell must clearly control the start and end points of the lead time measurement ("When does the time starts to run?"). Only when the cell has both the necessary material and the order release, for example.

  2. The time, on the other hand, should only be monitored if the cell has absolute control over the associated time. Only those aspects of the cell's team that it has command on can be assessed.

As a result, employing the QRMC number has a variety of benefits:

While the assessment reveals a falling curve when appropriate measures to minimize the lead time within a cell are adopted, the graphical display of the QRMC number shows an ascending graph. The cell crew is much more inspired by increasing graphs than by dropping graphs.

Smaller lead time reductions at a later period are awarded more than greater lead time reductions at an earlier time by the QRMC number. This is demonstrated by the fact that lowering the lead time from e.g. 1hr to 30min is more difficult than cutting it from 3min to 2min.

Lastly, the QRMC number creates a dynamic competition within the organization, allowing teams and cells to monitor and analyze their progress in lead time reduction.

Organization wide application

In order to adopt the QRMC approach in your production areas it needs to be rolled out in the complete organization.

The fields of administration, purchasing, and product development are clearly referenced. As previously stated, it is also essential to minimize the interfaces by remodeling the cells to QRMC cells. Moreover, conventional process optimization techniques can be abolished, parallelized, integrated, or altered.

Planing your production with QRMC

A Material and Resource Planning (MRP) system helps you with production planning by assessing material requirements, initiating order proposals, and executing orders based on delivery dates.

The MRP system, on the other hand, is only as good as the employees filling it with information. In contrast to the processing time, "buffer times" for the order term are frequently scheduled to ensure smooth workflow and overcome planning flaws. The parameters for an MRP system are fairly straightforward after rebuilding the organization to QRMC cells. The MRP system is used to carry out greater cooperation and scheduling of the material flow from the supplier via the QRMC cells to the end date.

The system uses conventional logic based on lead times to regulate WIP levels, material orders, and backward scheduling by delivery date. The lead time is determined using the QRMC cell's lead time rather than the processing timings for every processing stage.

The MRP system is not used to manage micromanagement for each particular machining phase; this is performed by the cells independently. This implies the MRP system will be simpler, and the buffer times associated with each machining process will be shorter. Adjustments in the lead time as a result of cell optimizations are communicated back to the MRP system.

To synchronize order planning in QRMC systems with several QRM cells, a "capacity forecast" system, the so-called POLCA system, is initiated.

The POLCA (Paired-Cell Overlapping Loops of Cards with Authorization) system relies on the QRM cell structure and guarantees a constant flow of information among two cells. This prevents production from causing material blockages in the next cell. As a result, WIP accumulate between both the QRM cells. POLCA straightens out the varied capacities and lead time per cell, inhibiting the development of these "buffer or backlog stocks."

Due to planning in the MRP system, POLCA only operates on an order if it is required and genuinely needed POLCA aids in the identification of highly frequented bottlenecks in the system, narrowing the range of optimization techniques.

Coming to an end

Through the adoption of the QRMC methodology and its effective implementation, not only are lead times lowered, but also overhead expenses are diminished tremendously.

Additional effects include increased product and process quality, and also high variability against short-term market shifts and fluctuating client behavior. Customer responsiveness in today's marketplaces, with the appropriate items in the right location at the right time, is a crucial component that will result in greater market share. Cost savings and sales growth can both be achieved with QRMC.

In todays and tomorrows competitive market, a strategy that guarantees organizations are more competent and durable.

Read More
The Language of Lean Lukas Breucha The Language of Lean Lukas Breucha

Set up time reduction

Set up time reduction. Nice and simple.

First things first. In order to reduce set-up time the set-up process itself must be observed and analyzed (e.g. by using the EMIPS - eliminate, minimize, integrate, parallelize or synchronize - methodology).

After you have analyzed the process make sure you write down all identified kinds of waste. Try to define the ideal state of the new procedure. Only after verification through testing of the new procedure make it a standard and implement it in your TPM framework. By doing so your operators are now responsible for the new set-up procedure, assumed that your operators are properly trained.

The whole focus on set-up time reduction comes from the customer requirements to manufacture a higher variety of goods in smaller batches. In order to meet those requirements set-up or change over must be kept as short as possible.

But let us go a little bit more into the details.

The pure set-up time is defined as the time needed to change from the last part of a batch to the first part of the following batch.

The set-up includes all activities needed, preparation, action on side and adjustments needed. By doing this you automatically differentiate between so called “external” and “internal” activities.

The following steps should help you to make it easier to reduce set-up times

1 Classify each part of the set-up process to either internal or external. Internal steps are those that only can be done while the production is or has to be inactive. External steps are done without interrupting production.

2 Convert internal steps to external ones. The whole idea is to minimize the time needed shutting down operations. This is why we want to take internal steps out as much as possible.

3 Reduce the time needed for the remaining internal steps. There are for sure some steps you can not take out, for those the manufacturing has to be stopped. The whole focus is now on this internal steps and how to reduce them to an absolute minimum. Here the SMED methodology (Single Minute Exchange of a Die) can help. Too find out more you can read here.

4 Eliminate adjustments. Last but not least try to get stable process parameters. With effective process control in place you can get rid off adjustment activities.

A Pareto Diagram can be useful to prioritize the setup time reduction activities. Don’t start everywhere at the same time! Start with the biggest loss and you will see over the time how it will change. It also gives you a great opportunity to see the progress that you are making on set-up time reduction.

Read More
The Language of Lean Lukas Breucha The Language of Lean Lukas Breucha

DMAIC

Define, Measure, Analyze, Improve, Control. DMAIC is an incremental process improvement using Six Sigma methodology.

Define, Measure, Analyze, Improve, Control. Incremental process improvement using Six Sigma methodology.

DMAIC can bee seen as a data-driven improvement strategy and for sure is part, or will be a part, of your organizations SIX SIGMA quality initiative. DMAIC is an acronym for: Define, Measure, Analyze, Improve, and Control.

DMAIC is a cyclical process such as the PDCA is. The reason to go for the DMAIC is to strive for the best result possible with a structured approach.

These process steps are:

DEFINE: the customers and their CTQ (Critical to Quality) and the core process involved.

  • Who are your customers?

    • What are their requirements for products or services?

    • What are their expectations?

  • Go for a value stream and map the process flow through the complete business process

MEASURE:

  • Define a plan on how to collect data from your core process

  • Go for different sources of data in order to be as specific as possible on defects and metrics

ANALYZE:

  • While analyzing the data along the process map make sure to identify the real root cause of defects and

  • point out opportunities for improvement

  • Compare shortfalls with the results of customer surveys

  • Determine gaps between targeted performance and current performance

  • Prioritize potential improvement measures

  • Identify variation and their source

IMPROVE:

  • Gemba Walks

  • Improvement Kata

  • Kaizen Workshops

  • Target is to improve the current process in a simple and effective way

  • Develop a prioritized action plan

  • Do it!

If you want a structured approach, just read our PDCA article.

CONTROL:

  • Stay tuned on your process improvement measures

  • Make sure that they stay on track

  • Prevent falling back to the “old way”

In the end, when you are in charge, require the full documentation. Make sure that everything implemented is well documented and a clear monitoring is installed that deviation can be fast identified.

Having or installing a sustainable problem solving culture in your organization will be key for the future. Make sure to institutionalize problem solving or a kaizen culture through training, training and more training.

Read More
The Language of Lean Lukas Breucha The Language of Lean Lukas Breucha

Waste

The opposite of value creating are non-value adding activities. Those can be remembered with TIMWOOD.

Waste (MUDA)

Waste or MUDA is the opposite of value creation. Waste describes all non-value-adding activities the customers are not willing to pay for. The two main categories are obvious and hidden waste. While obvious waste can be eliminated, hidden waste can only be minimized.

When talking about waste there is no way around the 7 kinds of waste according to Taiichi Ohno most known in the lean world as TIMWOOD. Feel free to read the complete article on TIMWOOD(S) - yes you are right - where is this S coming from… keep on reading and you will see.

The 7(8) kinds of waste:

  1. T = Transportation

  2. I = Inventory

  3. M = Motion

  4. W = Waiting

  5. O = Overproduction

  6. O = Overprocessing or - engineering

  7. D = Defects

  8. S = Unutilized stuff

It is important to be aware of these kinds of waste in the list. But overproduction is the worst and typically initiates the other types of waste.

To read more in detail about TIMWOOD go here.

Read More
The Language of Lean Lukas Breucha The Language of Lean Lukas Breucha

Pareto Principle

The 80/20 rule demonstrates that things have an unequal distribution. Out of 5 one will fly and have the most impact. With 20 percent of action 80 percent of your target state is already reached.

The Pareto Principle describes that 80% of problems can be closed with 20% of the causes. This principle is named after Vilfredo Pareto who found out that 80% of Italy’s wealth belonged to 20% of the population.

With this in mind it is worth to have a look at it.

Let us start with an assumption, according to the Pareto Principle it allows us to assume that

  • 20% of input creates 80% of the output

  • 20% of customers create 80% of your revenue

  • 20% of causes create 80% of failures

  • 20% of your employees create 80% of sales

  • and so on…

But before you run away now and think you have the answer hold a second. With the 80/20 rule you might tend to say that it always have to be 100 - it’s not. Make a deep analysis before making such statements! 20% of your employees can also make only 20% of sales or 60%. So before you fire 80% of your employees keep in mind that the Pareto Principle only gives you an idea on the distribution.

The whole idea behind it is that most things in life are not distributed evenly!

When we talk about value adding activities and the final product is 100% What is with all the necessary tasks, that are not adding any value to the final product but have to be done to run the company.

Or think about failures and finding the root cause, where to start to take actions? This is great when you think about a Failure Pareto and you want to satisfy your customer as quick as possible. Of course you are focusing first on the most failures and most of the time - not always - the other failures will disappear as well.

But most important of all, your customer gains trust in you that you have the competencies to do the job.

The key point is that most things are not in a 1/1 actio = reactio relationship.

So what can we use it for this 80/20 rule?
The Pareto Principle in first place supports you on realizing that most of the outcome are based on a minority of inputs. This means:

  • 20% of input creates 80% of the output > try to reduce those non value adding activities

  • 20% of customers create 80% of your revenue > install a key account manager that the customers knows he/she is important to your company > your customers success is your companies success

  • 20% of causes create 80% of failures > Focus on fixing those failures first

  • 20% of your employees create 80% of sales > get those employees a reward

We could continue on and on. To bring it to the point > focus on the 20% and not on everything at the same time.

Some examples that might help you for a better understanding:

  • Instead of spending a whole night to prepare a presentation and thinking about where to start > focus on one topic and do it. You will get a feedback anyway during the pitch. This feedback gives you the chance to take it and improve it.

  • Instead of focusing on one solution that might be the best and go through all the details. Make a list of three and go through the pros and cons with your colleagues that probably know the topic better anyway and based on their opinion make a decision with what to go on.

Maybe this examples are nuts for you but we want to emphasize that you should focus only on the important 20% and forget - for the moment - the other 80.

Last but not least - the Pareto Principle is not a law of nature it is a guideline to steer your focus and to save time on problem solving or simply getting your job done faster.

Read More
The Language of Lean Lukas Breucha The Language of Lean Lukas Breucha

FMEA

The method of the FMEA - Failure Mode and Effect Analysis has been used for years in the automotive and manufacturing industry.

Failure Mode Effects Analysis - FMEA

The method of the FMEA - Failure Mode and Effect Analysis has been used for years in the automotive and manufacturing industry.

The risk analysis framework has been applied in a wide range of industrial sectors. The first areas of application were traditionally in product development. Based on this the integration of the production process planning and the production. In the automotive industry, the joint creation of FMEA for products and processes by Today customer, supplier and subcontractor are a natural part of a cooperation. 

The user is guided through the "10 Steps to Creation of the FMEA".

Step 1 - Review the process

  • Use a process flow chart or an already existing value stream map to identify each part of a process

  • List all process steps in a FMEA table

  • If you think the list gets too long it might is. Use this chance to split up the process and cut the elephant. It makes more sense to work on smaller parts of the process instead of getting lost in the woods.

Step 2 - List potential failures

  • Review all existing data and documents that can give you a hint about each component that can lead to a failure

  • After having a complete list try to cut it down and to combine the parts of the initial list

  • The chances are high that you will identify several potential risks of failures for each component

Step 3 - List potential effects of failures

  • The effect is the outcome of a failure on the finished good or a process step

  • It is common that not only one effect will occur for a single failure, don’t be suprised

Step 4 - Assign the level of failure to risks

  • This is based on the consequences for each failure

  • Think about the ranking as the worst impact that it can have

Step 5 - Assign the possibility of occurrence

  • How high is the possibility of occurrence

  • What impact will it have if occur

Step 6 - How can it be detected

  • What are the chances that you will detect the failure before occurring

Step 7 - Calculate the RPN (Risk Priority Number)

  • Severity (S)

  • Severity x Occurence (S x O) = criticality

  • Severity x Occurence x Detection (S x O x D) = RPN

Step 8 - Define the action plan

  • With the decision making process followed by the prioritization from the RPN (Step 7) focus on the topics with the highest RPNs

  • Follow a classic action plan by defining who will be doing what till when

Step 9 - Take action

  • Get things done!

  • Implement the defined improvement actions

  • Follow the PDCA principle

    • Plan - done

    • Do - right now

    • Check - Step 10

    • Act - loop starts over

Step 10 - Re-evaluate the RPN

  • Time to check on the impact of your actions

  • Re-evaluate each potential failure identified and determine if the improvement measures have an effect or not

  • If not follow the PDCA and start over with step 8

The FMEA is linked to all CIP and Kaizen activities - there is always something to improve.

Read More
The Language of Lean Lukas Breucha The Language of Lean Lukas Breucha

Doctor Nurse Principle

The operator creating the value (doctor) receives the materials and tools from the logistics provider (nurse), so that his/her primary activity is not interrupted by secondary activities.

In the Doctor Nurse principle, the operator creating value is considered as the doctor, he receives tools and goods he needs to do his job from the nurse in this case logistics. For this reason, the doctor can’t do his job without the support of the nurse.

What can we learn from hospitals and how can we adapt it to the lean world.

In hospitals it is crucial that the doctor can fully concentrate on a surgery, the doctor is the single point of contact towards the patient using his tools combined with his training. Everything distracting him from being focused has to be eliminated. In order to give him this capability he needs assistant right next to him. The nurse’s job is to support the doctor and provide him with all equipment, tools and material he needs just in time.

Applying this principle to production is not that hard. To use the doctor nurse principle on the shop floor some requirements have to be met. As mentioned think about the operators as the doctor, they have to concentrate on production. As they are the once generating value for the whole organization by assembling the components which customer are willing to pay for – they need to be placed in the center of all activities – the rest is supportive.

In lean manufacturing this is called the line-back approach. Primary processes are the once that add value so focus on the operation and prepare everything that supports it. The nurse takes care of all other activities, most of the time non-value adding activities but necessary.

Doctor Nurse Principle

Arrange the work station in a way that gives the nurse free accessibility to the work area without disturbing the doctor, i.e. filling up kanban shelfs with new material while simultaneously removing empty boxes.

With the approach of separation of primary and secondary processes in two physical areas none of the process will be interrupted by the other.

In addition, this principle is driving the mindset of the organization to focus on a lean production process and how best it can be supported. If you do so, you will also have the advantage by separating value-adding and non-value-adding activities to find you approaches to minimize the non-value adding activities.

Another way of calling the nurse a nurse is a water spider or in lean terms a Mizusumashi – the inbound material supplier.

Read More
The Language of Lean Lukas Breucha The Language of Lean Lukas Breucha

Kamishibai Board

The Kamishibai Board helps your organization to visualize and manage recurring tasks in a very simple but effective way.

The Kamishibai Board is part of the visual management in Lean Management that supports you on managing recurring tasks in a way that the status of each task is clearly recognizable by everyone in your organization.

The tasks are listed by their frequency and the responsible persons. The design of the cards can vary, but typically T-Cards are used as the handling is quite easy. These cards contain on both sides the information of each task. One side of the card is red the other one green. RED: to do, GREEN: done. So the color is indicating the status of each task.

By using these two color coded cards everybody in the organization will recognize if all activities are on track or if there is a backlog ahead on performing daily, weekly or monthly activities.

Example Kamishibai Board - weekly tasks with assigned persons

Kamishibai is a Japanese term, to bring it in operations terms it can be understood as mini-audits. The Kamishibai is a great starting point for Gemba Walks mainly in the admin area of your organization but can also be utilized in the service and maintenance department. It also supports 5S activities and assists in checking the continuous improvement actions on checking on standards and improvements during regular meet ups.

The Kamishibai approach has different sections. E.g. a simple planning board with T-cards with a red and a green side, a list of person in charge and a 3C list. The 3C list thereby describes the Concern, defines the Cause and lists the Countermeasures, find a free template (in flip chart format) here.

The planning section has the tasks tank, on the far left side all tasks are stored in holders (T-Cards) or e.g. magnetic cards that are also green on the one and red on the other side. One section further to the right you can implement a matrix with responsible person for each row and all weekdays as column. By this you can easily assign tasks.

Between the organizational and the problem solving part there should be space for the escalation or support needed tasks. It might happen that an assignee is not able to fulfill a task as he/she is in the need of information or active support from a different level or department.

To sum it up. The benefits of the Kamishibai methodology is mainly the visualization part. It gives clear structure and is understandable at first sight. With the Kamishibai you are able to perform so called “mini-audits” on a regular basis that helps you driving the continuous improvement process in your organization and supports you on performing effective Gemba Walks. Instead of heaving some chit chats you can bring information straight to the point and address any issues fast.

You can use the Kamishibai methodology for all kinds of work areas in your organization, e.g. you have control indicators for methods, processes, documents, standards and much more. In the end the Kamishibai helps you to keep the routine of defined standard work procedures as results of KAIZEN activities. If it works congrats, if not congrats - you found something that can be improved.

Read More
The Language of Lean Lukas Breucha The Language of Lean Lukas Breucha

Kaizen Manager

Kaizen Mangers are the people in your organization who initiate changes within your organization or support departments on the path along the continuous improvement process (CIP).

Kaizen Manager (Change Agents)

Kaizen Mangers are the people in your organization who initiate changes within your organization or support departments on the path along the continuous improvement process (CIP).

Change Agents are the key players in your organization to integrate new processes or improvement actions and simultaneously stabilize departments throughout a change or transformation process.

When talking about a Kaizen Manager or Change Agent he/she has the following duties with the support of the Change Leader:

  • Support the change process by defining the program, participants, selecting suitable processes and defining the targeted state

  • Set individual targets for responsible/affected persons

  • Support responsible persons for each individual improvement process through coaching or scheduling exchange rounds with other key players. (To stay on track)

  • Support the onboarding process for new people to the program

  • Support on the transformation process from learning to actually doing

  • Coordinate and support further expansion within departments

  • Support on the transformation process of organizational culture

  • Challenge status quo with fundamental questions on existing procedures

  • Work closely with the heads of departments to anchor the new improvement culture across the complete organization

What ever it takes, it has to be clear that a sustainable change culture can only be established if all of your mid and top mgmt. themselves drive the integration of all their direct reports. The Kaizen Manager is the pure supportive function in the role of an internal consultant to guide the process.

Read More
The Language of Lean Lukas Breucha The Language of Lean Lukas Breucha

SMED

Single Minute Exchange of Die. A method of increasing the amount of productive time and to reduce the planned downtime to single digit minutes.

Single Minute Exchange of a Die

This series of techniques was invented by Shigeo Shingo to set-up manufacturing equipment in less than 10 minutes. Most of the time people think in one minute but is thought as single digit minutes.

So what is behind the set-up time reduction?

This method is driving to increase the net production time as much as possible by minimizing the needed time to change from one model to another. As far as you have two or more products running on your line or to simply exchange parts of your machine or equipment that regularly needs to be replaced. This is increasing the flexibility of your production and allows you to react on changes in demand more quickly.

When trying to reduce changeover tomes the typical goal is to reach less than 10 minutes. The short summary of SMED activities is to analyze each element of the changeover with the EMIPS method to see if it can be eliminated, modified or moved outside the process, integrated, tasks are parallelized or synchronized.

SMED

SMED

When looking at those three stages we can simplify it further for each stage:

Just ask yourself:

Separate:
Can this task, as currently performed, be done while the line is still running?

Convert:
Which process steps can be moved out of the changeover itself and be parallelized or completely taken out? How can you do it?

Synchronize:
How can the remaining tasks be synchronized so you need as little time as possible to complete the changeover?

I save you the story with the pit stop in formula 1 - just google it by yourself and you will find the evolution of pit stops. Quite interesting and still valuable.

So what are the benefits of SMED?

The first effect you will see on improvements of the OEE of your manufacturing facility. If this is important for you and you are numbers driven. In the end you will reduce downtimes and therefore manufacturing costs as your machines will have a greater net operating time.

With a long term perspective SMED will enable you to have smaller batch sizes, which will improve your possibilities to react faster on changes of customer demands and in addition your inventory (tied capital) and WIP (work in progress) will decrease.

Read More

Stay Connected


Ad

We want information fast and in a nutshell. We from OI recommend Blinkist* - because it’s simply the best.