Machine Data Availability

The share of planned time in which machine data is actually received and usable.

Formula

Data availability = Time with valid data / Planned time

Worked examples

  1. 0112 machines, 450 planned minutes each: 5,400 minutes, data present for 5,238. Availability = 97.0%.
  2. 02One machine with a network problem: 210 of 450 minutes = 46.7%.
  3. 03After fixing the switch: plant average 99.6% over the next week.

Pitfalls

  • Gaps in the data make OEE look better or worse depending on how they are treated.
  • Data that arrives but is wrong counts as not available.