Machine Data Availability
The share of planned time in which machine data is actually received and usable.
Formula
Data availability = Time with valid data / Planned time
Worked examples
- 0112 machines, 450 planned minutes each: 5,400 minutes, data present for 5,238. Availability = 97.0%.
- 02One machine with a network problem: 210 of 450 minutes = 46.7%.
- 03After fixing the switch: plant average 99.6% over the next week.
Pitfalls
- Gaps in the data make OEE look better or worse depending on how they are treated.
- Data that arrives but is wrong counts as not available.