Overhead Rate

Manufacturing overhead allocated per unit of an allocation base, for example per machine hour or per labor hour.

Formula

Overhead rate = Manufacturing overhead / Allocation base (machine hours, labor hours)

Worked examples

  1. 01Machining cost center: overhead EUR 1.86 million per year, 12,400 planned machine hours. Rate = EUR 150 per machine hour.
  2. 02Product needing 0.25 machine hours carries EUR 37.50 of overhead.
  3. 03Actual hours 11,200 at EUR 150: absorbed EUR 1,680,000, actual overhead EUR 1.86 million. Under-absorbed EUR 180,000.

Pitfalls

  • Allocating machine-heavy overhead by labor hours distorts product costs.
  • Under-absorbed overhead in low-volume months is a volume effect, not a cost problem.