A quote that lists technical data and a price invites one question: can someone else do it cheaper? A quote that shows the result in the customer’s numbers starts a different conversation.
Five parts of a quote
- The task in the customer’s words, with the data the customer gave.
- The solution: concept, scope of supply, interfaces, exclusions.
- The benefit in numbers: energy, cycle time, space or service effort, in the customer’s figures.
- Price and terms: price per unit and per lot, validity, delivery time, payment.
- Next step: a date for the conversation, agreed before sending.
A worked benefit
Customer AC-102 builds injection molding machines and asks the example company for a power unit. Two versions go out.
| Item | Standard unit | Variable speed drive |
|---|---|---|
| Price per unit | EUR 15,900 | EUR 18,400 |
| Average power draw | 11.0 kW | 7.4 kW |
| Energy per year, 6,000 hours | 66,000 kWh | 44,400 kWh |
| Energy cost at EUR 0.18 per kWh | EUR 11,880 | EUR 7,992 |
The end user saves 3.6 kW times 6,000 hours times EUR 0.18: EUR 3,888 per machine and year. The extra EUR 2,500 pays back in 7.7 months. Operating hours and energy price came from the customer and are stated in the quote.
Three rules apply. Use figures the customer gave or confirmed, and say so. Show one or two effects, not ten. State your assumptions: guaranteed values are a contract matter for your legal adviser.
Discount rules
A discount is the fastest way to end a difficult conversation and the most expensive. Rules protect salespeople from their wish to close.
| Discount on the calculated price | Approved by | Condition |
|---|---|---|
| Up to 3 % | Field sales engineer | Something in return, noted |
| Above 3 % to 8 % | Sales manager | Written reason, margin effect shown |
| Above 8 % | Managing director | Only with a plan or frame agreement |
Below the price floor there is no quote. The floor is set per product group once a year; how the price is calculated belongs to the Cost and Controlling line.
Something in return
Every discount is linked to something the customer gives: a larger lot or a yearly volume, a longer delivery time or a fixed schedule, a standard design instead of a special one, or a second product group. A discount without a return teaches the customer that the first price was not serious.
What discipline is worth
In year one the average discount on orders from quotes fell from 8.5 to 6.0 percent. Orders from quotes were EUR 22.4 million at a list value of EUR 23.8 million; at last year’s discount they would have brought about EUR 600,000 less. Quotes discounted above 8 percent fell from 31 to 7 percent.
The quote register
One list of all quotes shows what no salesperson can see alone: customer, class, value, hours, discount, status, decision date and reason for a loss.
Last year a reason was on record for 210 of 936 lost quotes, 150 of them “price”. In year one someone other than the owner called the customer within two weeks. For the 630 lost quotes:
Price 30 percent, project postponed or canceled 24 percent, a competitor’s technical solution preferred 18 percent, no feedback obtained 15 percent, delivery time 13 percent.
Each reason has an owner: postponed projects point at the check before quoting, a preferred solution at the concept talk, delivery time at planning.
Checkpoints
Prices are set by your company alone. Contact with competitors about prices, discounts, territories or customers, and any rule on resale prices, belongs to your legal adviser beforehand, as do liability, warranty and penalty clauses. Leading the price conversation is covered in the Negotiation line.
Take one recent quote above EUR 50,000 and rewrite it with one benefit in the customer’s numbers. Then compare which version you would rather defend.