Skip to content
Series | 6 parts

FMEA and Control Plan

The process FMEA in seven steps, from the scope to the control plan at the station. 6 parts in three blocks, from structure and function analysis to failure chains, ratings, the action priority and the reaction plan.

A failure found on paper costs a discussion. The same failure found at the customer costs a complaint, a sorting action and trust. The process FMEA moves the finding to the cheapest possible moment, and the control plan keeps the answer alive at the station. This series follows one worked example, a new assembly cell for hydraulic hose assemblies with 7 process steps and 24 failure causes, through the whole method: when an FMEA is due, how to set the scope and build the structure, how to write functions and failure chains, how to rate severity, occurrence and detection with your own anchors, why the action priority replaced the risk priority number, and how every control ends up as a line in the control plan with a reaction plan.

6 parts

Newsletter

One Lean idea.
Every two weeks.