Emergencies are rare. That is the problem: nobody is practiced. What is not prepared and rehearsed will not work on the day.
Numbers and training of first aiders, equipment, alarm systems and contacts with authorities are regulated locally. Clarify them with your safety professional. This part describes what the line manager checks and practices.
Five elements
Alarm plan. Who calls whom, with which words, from where. One page at every phone and area board.
Reporting chain. The first call, the internal call, who meets the rescue service at the gate and leads them in, who informs the management.
First aid. Trained first aiders on every shift and in every area, material complete, names posted. The example plant has 22 trained first aiders among 240 employees, by its own rule.
Escape and assembly. Routes free and marked, doors that open, an assembly point everybody knows, a head count by list.
Special scenarios. A person trapped in a machine, a person hanging in a harness after a fall, a leak of a substance. For each one, an idea how to get the person out.
Check it by asking
Paper tells little about readiness. Questions at the workplace tell a lot.
- Ask three people what they would do right now if a colleague collapsed.
- Call the internal emergency number. Does someone answer on the late shift?
- Walk one escape route to the outside. Is it free, and does the door open?
- Ask where the assembly point is, and who counts.
The example plant turned this into twelve readiness questions, answered every quarter with yes, partly or no. In month 12, nine of twelve are a yes. The three answers of “partly” are honest ones: an escape door in Hall 3 was blocked by pallets on the day of the check, and for a person trapped in the press brake or working on the crane runway there is no practiced rescue yet.
The first drill
Month 3, day shift. Scenario: fire in the solvent store. The alarm is given, the plant is evacuated, the head count at the assembly point is complete after 7 minutes and 40 seconds.
Three findings. Two visitors were on no list. One escape door was blocked from the outside by a container. And the alarm was not heard inside the grinding booth. The booth got a visual alarm signal.
The drill produced five actions. All were closed.
The second drill
Month 9, late shift. Scenario: fire in Hall 2. The head count is complete after 4 minutes and 50 seconds.
One finding: a contractor team working in the yard was not known to the person leading the assembly point. Two actions followed, both closed: clearances of the day now go to the gate, and the head count list has a line for contractors.
| Drill 1, month 3 | Drill 2, month 9 | |
|---|---|---|
| Findings | 3 | 1 |
| Actions, all closed | 5 | 2 |
| Minutes until the head count was complete | 7.7 | 4.8 |
Choose the uncomfortable drill
The second drill was held on the late shift on purpose. A drill at ten in the morning with everyone informed proves little.
After a drill and after a real event
Review on the same day with the people who were there: what worked, what did not.
Put the actions into the same plan as every other safety action, with owner and date.
After a serious real event, take care of people. Witnesses and colleagues need a conversation, not a form.
What to do this week
Walk one escape route from a workplace to the assembly point, with one employee of the area. Time it. Note everything that stands in the way.