Skip to content
Occupational Safety and Health | Part 3 of 10

Hierarchy of Controls: Choosing Safety Measures by Effectiveness

Eliminate, substitute, engineering, organizational, personal. How to choose measures in this order and close them only after an effectiveness check.

When a hazard is found, the fastest answers are a sign, an instruction and a pair of gloves. They are cheap, and they depend on every person, every day. There is a better order.

Five levels

The order of measures ranks them by how much the protection depends on human attention.

  1. Eliminate. The hazard no longer exists.
  2. Substitute. Something less dangerous does the job.
  3. Engineering. A technical barrier separates people from the hazard.
  4. Organizational. Rules, procedures, limits of time and access.
  5. Personal. Equipment worn by the person. The hazard remains.

Levels 1 to 3 work without anyone having to think of them. Levels 4 and 5 are needed, often as a second layer, but a plan that consists mostly of them will not hold. The rule is simple: start at the top, and move down only when the level above is not possible. Write down why.

The levels in Hall 2

The example plant rated 24 hazards in its pilot hall. Each got one main measure.

Eliminate: packaging material was stored in the welding bay, within reach of sparks. It was moved out. The fire hazard at that place is gone.

Substitute: frames were cleaned with a solvent. A water-based cleaner does the same job.

Engineering: a walkway with a barrier and a gate at the forklift crossing, extraction at the welding torch, a door interlock at the robot cell, a vacuum lifter at the press brake, wheel chocks with key handover at the ramp.

Organizational: a lifting plan per frame type and a marked zone for crane work, a check of slings before use, a lockout procedure with a pressure release step.

Personal: cut-resistant gloves for sheet handling, sealed eye protection for grinding.

Level Share Measures
1 Eliminate 4 % 1
2 Substitute 8 % 2
3 Engineering 58 % 14
4 Organizational 17 % 4
5 Personal 13 % 3

Seventeen of 24 measures, 71 percent, sit on the top three levels.

The question that moves a measure up

For every high risk, ask: what would have to change so that the hazard is gone? At the crossing in Hall 2 the first idea was a mirror and a rule that pedestrians take care. The question led somewhere else: move the walkway so that it crosses the forklift route only once, and put a gate there. Severity stayed at 4, likelihood fell from 3 to 1, the score from 12 to 4.

From measure to closed action

A measure is a line in an action plan with five fields: the hazard it belongs to, the level, an owner by name, a due date and the interim protection that holds until it works.

Then comes the step most plans skip: the effectiveness check. Four questions at the workplace.

  • Is it there, at every workplace it was meant for?
  • Is it used? A guard that is opened with a tool every shift is not a measure.
  • Does it create a new hazard, such as a barrier across an escape route?
  • What are severity and likelihood now?

Only after the new rating is the action closed.

After twelve months

In Hall 2, 23 of 24 measures are done and checked. The classes moved from 8 high, 13 medium and 3 low to 1 high, 8 medium and 15 low. The sum of scores fell from 180 to 86, a reduction of 52 percent.

One high risk remains: the fall from the crane runway. The mobile work platform is ordered. Until it is in use, maintenance works there only from a rented lift and with a written clearance.

What to do this week

Take your action list and write the level next to every measure. Count, and ask the question again for the three highest risks.

Newsletter

One Lean idea.
Every two weeks.