Hazard Identification and Risk Assessment: Activity, Hazard, Rating

How to find the hazards of one area with the people who do the work and rank them by severity and likelihood on a simple matrix.

Many plants have a hazard assessment. It sits in a folder and was written by one person at a desk. The assessment that protects people is made at the workplace, by the manager of the area, with the people who do the work.

In most countries a documented assessment is a legal duty, with rules on content and review. Clarify those with your safety professional. This part describes the management side: how to do it so that it finds what matters.

Start with the work

The example plant chose Hall 2 as its pilot: welding and frame assembly, 46 employees, and four of last year’s nine lost time accidents. The team was the area manager as lead, a supervisor, two operators, a maintenance technician and the safety professional as adviser.

Step one is a list of activities. Not only normal operation, but everything around it: set-up, cleaning, fault clearing, maintenance, transport. Hall 2 has ten: press brake bending, sheet handling, manual welding, the robot welding cell, grinding, forklift transport, crane lifting, cleaning with solvents, maintenance, and racks and ramp.

Step two is a walk. Watch each activity and ask three questions: what has hurt someone here, what almost did, what worries you? One line per hazard: what can hurt whom, and how.

Hall 2 ended with 24 hazards. Nine of them were named by operators and maintenance technicians and had been in no document before.

Two questions per hazard

A list of 24 hazards does not say where to start. A rating does. The example plant uses two scales of four steps, its own choice and not taken from a standard.

Severity asks how bad it can get in the worst realistic case: 1 minor, first aid at the workplace; 2 moderate, a few lost days; 3 serious, weeks of lost time or lasting effects; 4 severe, permanent harm or a fatal injury.

Likelihood asks how probable that is with the measures in place today: 1 very unlikely, 2 unlikely, 3 possible, 4 likely.

The score is severity times likelihood, from 1 to 16. High from 9, medium from 4 to 8, low from 1 to 3.

Four rules for an honest rating

  1. Rate the situation as it is, with the measures that are really in place and used.
  2. Severity is the worst realistic outcome, not the most frequent one.
  3. Likelihood looks at exposure: how often, how many people, how long, and how often the safeguards fail.
  4. When the team disagrees, take the higher value and write down why.

The result in Hall 2

Class Rule of the plant Hazards
High, 9 to 16 Measure decided within one week, interim protection at once 8
Medium, 4 to 8 Measure planned within three months 13
Low, 1 to 3 Keep the existing measures, review once a year 3

The eight high risks have names: the hand in the tool area of the press brake, welding fume, a person in the robot cell during fault clearing, forklift and pedestrians at the hall crossing, people under a crane load, a fall from the crane runway, a pallet falling from a damaged rack and a truck that leaves while the forklift is inside. The sum of all 24 scores is 180.

What the score cannot do

The score ranks. It does not prove that a risk is acceptable. Most measures lower the likelihood, not the severity. In Hall 2, seven of the 24 hazards have severity 4. They stay on a separate list of the plant manager, whatever their score, and their safeguards are checked more often.

Interim protection

Engineering measures take weeks. The hazard is there tonight. So every high risk gets interim protection on the day it is rated: a barrier, a second person, a speed limit, a stop of the activity. No high risk leaves the room without a name next to it.