Skip to content
Project Management | Part 4 of 10

RACI: Exactly One A per Row

A responsibility matrix that names who does the work, who decides, who is consulted and who is informed.

The design freeze is overdue. The mechanical lead waits for production, production waits for the project manager, and the project manager thinks the plant manager has to decide. Everybody is involved, nobody is accountable.

A RACI matrix solves this with four letters and one rule.

Four roles

For every deliverable and every important decision, each person gets at most one letter:

  • R, responsible: does the work.
  • A, accountable: decides and signs. Exactly one per row.
  • C, consulted: is asked before, and the answer can change the result.
  • I, informed: is told after.

Rows are deliverables and decisions from the work breakdown structure. Columns are roles: sponsor, project manager, mechanical lead, software lead, purchasing, production.

An example

Decision Sponsor Project manager Mechanical lead Software lead Production
Charter approval A R C C C
Design freeze mechanics I A R C C
Software release for commissioning I A C R C
Budget change above 5 percent A R C C I
Acceptance after run at rate A R C C R

Three checks

Exactly one A per row. Two A means nobody decides. If two managers both claim the A, the sponsor settles it now, in the kickoff, not in the crisis.

At least one R per row. An accountable person without anybody doing the work is a wish.

Few C. Every C costs time and creates a veto. Consult the people whose input changes the result, inform the rest.

A fourth check is worth a minute: count the R and A per person. If one name carries half the matrix, that person is the bottleneck of the project, whatever the schedule says.

Decisions need limits

The RACI works best together with decision limits from the charter. The project manager may approve changes up to a certain cost and delay. Above that, the A moves to the sponsor or the steering committee. Write these limits into the matrix so that nobody has to ask.

Keep it alive

A RACI made in the kickoff and never opened again is decoration. Use it every time a decision is stuck: look up the row, find the A, ask that person to decide by a date.

Update it when people change. A new software lead inherits the R and the A of the predecessor, and the team needs to know.

The matrix is small. Its effect is large, because it turns “we need to align” into “Maria decides by Friday”.