Quality Tools | Part 3 of 8

The Pareto Chart: By Count and by Cost

How to build a Pareto chart, why the same data should be charted by count and by cost, and what to do when the chart is flat.

A Pareto chart is a bar chart sorted from the largest bar to the smallest, with a line that adds up the shares from left to right. It answers one question: which few items carry most of the problem? The idea behind it is an observation that holds surprisingly often. A small number of causes, defect types, customers or products accounts for the larger part of the effect.

Build it in five steps

  1. Add up each defect type over the period.
  2. Sort from largest to smallest. The category Other always goes last.
  3. Calculate the share of each type and the cumulative share.
  4. Draw the bars and the cumulative line, which ends at 100 percent.
  5. Mark the types that together reach about 80 percent. Start there.

For powder coating line 2, with 1,920 parts with a defect in 20 days:

Defect type Parts Share Cumulative
Thin coating 720 37.5 % 37.5 %
Inclusions 480 25.0 % 62.5 %
Orange peel 288 15.0 % 77.5 %
Scratches and handling damage 192 10.0 % 87.5 %
Craters and pinholes 120 6.3 % 93.8 %
Color deviation 72 3.8 % 97.5 %
Other 48 2.5 % 100.0 %

Three of seven types carry 77.5 percent of the defects.

Chart it again by cost

Counting treats every defect alike. The plant does not. On line 2, a part with thin coating is simply coated again, which costs EUR 10. A part with inclusions is sanded first, which costs EUR 20. Multiply each count by its rework cost and sort again:

Defect type Share of cost EUR
Inclusions 33.3 % 9,600
Thin coating 25.0 % 7,200
Orange peel 20.0 % 5,760
Scratches and handling damage 10.0 % 2,880
Craters and pinholes 8.3 % 2,400
Color deviation 2.5 % 720
Other 0.8 % 240

The total is EUR 28,800 in four weeks. By cost, inclusions move to the front with a third of the total. In this case both charts name the same top three, so the decision is easy: thin coating and inclusions first, worth EUR 16,800 of EUR 28,800.

Rules for a useful chart

Seven to ten bars. With thirty categories nobody classifies the same way, and the chart becomes a comb.

Other stays small. If Other grows above 5 to 10 percent, the categories do not fit the process anymore. Split it.

Same period, same scale. A smaller bar after an action means nothing if the second chart covers two weeks and the first one four.

Chart effects first. A Pareto chart of defect types shows what you can see. A Pareto chart of causes that nobody has verified only counts opinions. Causes come later, with data.

When the chart is flat

Sometimes no bar stands out. Then the 80 to 20 pattern does not apply to this view of the data. Try another view: by product, by process step, by customer, by machine. If every view is flat, the problem is general, and the process as a whole needs attention rather than one defect.

The 80 percent is a hint, not a law. Nobody should argue whether the limit is at 77.5 or 80 percent. The purpose is to stop working on seven things at once.

Before and after

The Pareto chart is also the simplest proof that an action worked. Twelve weeks after the baseline, the same check sheet gave this picture for 20 days:

Defect type Before After
Thin coating 720 168
Inclusions 480 216
Orange peel 288 288
All seven types 1,920 1,104

The defect rate fell from 8.0 to 4.6 percent and the rework cost from EUR 28,800 to EUR 18,000 in four weeks. Orange peel, untouched, is now the largest bar. The chart is flatter than before, and the next round starts with a new top defect. That is how the tool is meant to be used: not once for a presentation, but every month at the board.