How it works
- 02 Setup: machine, time, cost and targets. 03 Machines: compare your machines and choose the pilot.
- 04 Steps and 05 Stages: the recorded changeover, the split and the effect of each stage.
- 06 Ideas: every lever with minutes, cost, owner and status. 07 Standard: the sequence for two people.
- 08 Log and 09 Trend: every changeover and the weekly average and range.
- 10 Batch Size and 11 Business Case: what the gain is used for and what it pays.
- 12 Audit every three months. 13 Status every week.
Definitions used in the workbook
- Changeover time: From the last good part of the old job to the first good part of the new job at full speed.
- Interval: Days until every part of the machine has been produced once: number of parts / changeovers per day.
- Cycle stock: Half the batch on average: interval / 2 x demand per day.
Sheets in the workbook
- Start
- Setup
- Machines
- Steps
- Stages
- Ideas
- Standard
- Log
- Trend
- Batch Size
- Business Case
- Audit
- Status
Who it is for
Production managers and lean leads who roll out quick changeover to several machines.
The method behind the numbers
This workbook is part of the SMED toolkits. The Starter Kit adds the guide and the checklist for the first 30 days. The Excellence Bundle adds playbook, workshop pack, templates, deck and the complete Excel system.