How it works
- Open 02 Setup. Enter the machine, planned minutes per day, changeovers per day, the machine hour rate, the target and the reaction limit.
- Record one changeover on video. Enter one row per step in 03 Steps with minutes and group. The total must equal the changeover time.
- Set the target class for every step: internal, external before or external after. Add the lever, the minutes after and the stage.
- Read 04 Stages: the changeover time after each stage and what it means per day and per year.
- Log every changeover in 05 Log with two clock times. Read 06 Status every week at the board.
Definitions used in the workbook
- Changeover time: From the last good part of the old job to the first good part of the new job at full speed.
- Internal: The machine must stand for this step.
- External: The step can be done while the machine runs, before the stop or after the restart.
- Stages: 1 separate internal and external work. 2 convert internal work to external. 3 streamline what remains.
Sheets in the workbook
- Start
- Setup
- Steps
- Stages
- Log
- Status
Who it is for
Supervisors, setters and lean coordinators who want to cut the changeover time of one machine.
The method behind the numbers
This workbook is part of the SMED toolkits. The Starter Kit adds the guide and the checklist for the first 30 days. The Excellence Bundle adds playbook, workshop pack, templates, deck and the complete Excel system.