Skip to content
Series | 6 parts

SMED and Changeover Reduction

Cut changeover time in three stages and turn the minutes into smaller batches. 6 parts in three blocks, from batch size logic and the recorded changeover to internal and external work, quick clamps, the changeover standard and the key figures.

Long changeovers force large batches, and large batches create inventory, long lead times and late deliveries of everything that is not running. SMED, the single minute exchange of die, is the method that breaks this chain. This series follows one worked example, a 4,000 kN press with 12 part numbers and 96 minutes per changeover, through the whole sequence: why changeover time decides batch size, how to record a changeover and break it into steps, how to move external work out of the stop, how to convert settings and streamline clamping, locating and trials, how to write a standard for two people, and how to keep the time down and use it for smaller batches. It deepens the Flow and Just in Time module of the Production System.

6 parts

Newsletter

One Lean idea.
Every two weeks.