Material Flow

Material Flow - Pull in the best from you can get, just another part of the “little production system” series.

The means of this article in the series “little production system” we will have a short insight on material flow without buffers - or simply called pull principle.


Definition

The indicator of material flow without buffer is that only as much material is moved, as in the next step is used and can be processed. Anything beyond that is in the way and obstructed.


The targets:

  1. Avoid overproduction

  2. Stocks are reduced flexibility is elevated

  3. Areas are reduced, distances are shortened


Key elements:

  1. Material is only available on planned and visualized buffers

  2. 1 piece or 1 set is delivered by low cost automation

  3. Consumption control / Pull - principle

  4. Mixed transport at short intervals

  5. The material flow is continuous

  6. Transport containers and systems are delivered in smaller quantities and more frequent

  7. Delivery intervals are adjusted to the cycle time


Key Performance Indicators (KPI)

  1. Buffer area

  2. Stock value

  3. Logistics costs

Self assessing the levels of fulfillment of your material flow without buffers.

MICRO LEVEL of production flow

Level 1

Workshop production - Technology island

Level 2

Island production without linking the machines. Installation is flow-oriented

Level 3

In other elements (e.g. TPM, FTQ, Flexible Facilities) corresponding services are provided.

For example: Machines and equipment are in TPM level n. Flexible facilities for “A”- and “B”-parts are available.

Level 4

Upstream and downstream operations are close together, partially interlinked. Transport routes/time are used for testing, marking or washing.

Level 5

Upstream and downstream operations are moved close together and connected by chutes, roller conveyors, etc.

Documentation that should be available

Process layout; material flow without buffer, material flow in cycles and flow production

Micro level stock and buffer

Level 1

Stocks are not visualized.

Level 2

Stocks / buffers between the machines are visualized (place and quantity).

Level 3

Buffers are smaller than a daily amount.

Level 4

One-piece/set flow. Accumulating buffers as keying sequence and/or disturbances are still possible.

Level 5

One-piece/set flow. No buffer between the process steps.

Micro level transportation

Level 1

Transport of the work piece carriers or base frames by handcart between the machines. Unplanned transports.

Level 2

Transport with work piece carrier or base frame in equal, fixed Quantities. No forklift as a means of transport in the field.

Level 3

There are no base frames in use. Transport is carried out with work piece carrier.

Level 4

Manual transport at working height. Uniform transfer heights avoid lifting and lowering procedures.

Level 5

Work pieces are moved from machine to machine via rollers, slides, belts. No means of transport!

Micro level material flow control

Level 1

Manual job control is carried out by specialists. Push principle! High planning and control effort. No visualization available.

Level 2

The material flow is clearly identifiable. Order control is still required. Responsibility for the control lies with the shiftleader.

Level 3

No processed work piece is discharged from the process chain. Interventions in the process chain are only necessary in the event of malfunctions.

Level 4

Only available together with level 5.

Level 5

No order control within the process chain necessary.

Macro level stock and buffers

Level 1

Buffer between the islands are larger than 1 lot (partial lots in motion).

Level 2

Lot sizes are smaller than the daily requirement for “A” and “B” parts. “A” and “B” parts no longer go into stock.

Level 3

Lot sizes correspond to the quantities per handling rack. Buffers between the islands correspond to a maximum daily requirement.

Level 4

Reduced stocks through levelled production for “A”-parts (periodically the same quantity per part number).

Level 5

A buffer (smallest quantity is 1 piece or 1 set) is permitted for control. Levelled and smoothed production for “A” and “B”-parts.

Macro level transportation

Level 1

Transport according to order. In the processing shop, workpieces are loaded from transport racks into processing racks and vice versa.

Level 2

Mixed transports at short intervals, partly still with forklift, partly already with train + trailer between the halls.

Level 3

Continuous transport system (e.g. transport train / overhead conveyor) between upstream and downstream processes. In some cases, workpieces are already placed in the downstream needed racks during the upstream process. No transports between process step I and process step II within the process chain.

Level 4

The transport containers used avoid repackaging between upstream and downstream processes. Example:  Workpieces are placed directly on the finishing frame after the last pre-processing step. Uniform transfer heights avoid lifting and lowering

Level 5

Workpieces are transported in workpiece carriers or containers with standardized modular dimensions.

Macro level material flow control

Level 1

Demand-controlled batch size production. "Economic batch sizes".

Level 2

First part numbers in consumption control between assembly and last production process. Previous block formation (during material call-off, during transport, during processing, etc.) no longer applies. In the pre-assembly area, no more than two units from the same batch are processed one after the other.

Level 3

Consumption control for all “A” and “B” parts. Any part can be processed on any day. “C”-parts management for purchased parts through logistics service providers.

Level 4

Levelled production. Consistent consumption control for “A” and “B” parts throughout the entire process chain. Sequenced delivery for selected part numbers.

Level 5

Levelled and smoothed production.

Read More
Little Production System Lukas Breucha Little Production System Lukas Breucha

Ideas and solutions

Ideas and solutions as one key element of every production system - so it has to be in the series of “little production system”.

Ideas and solutions are our daily companions in manufacturing industry. For real operational excellence the continuous improvement is key - one part of it is the proper problem solving therefore we are having this article in the series “little production system”, to have a short look at the idea and solutions criteria.


Definition

The Ideas and Solutions element describes methods for the systematic creation of ideas that serve the continuous improvement of all company processes.


The targets:

  1. Systematic identification, elimination and avoidance of waste of all kinds is promoted, involving all employees of the company.

  2. The element has the task of making the creativity and knowledge of all employees available to the company.


Key elements:

  1. Targeted application of problem-solving techniques

  2. Interdisciplinary problem-solving teams for direct implementation

  3. Idea > Implementation > Standardization

  4. Premium (simple, unbureaucratic handling, rapid implementation)

  5. Works agreement CIP

  6. Raising awareness of problems


Self assessing the levels of fulfillment for your Ideas and solution process in your organization.

Cost reduction

Level 1

Specialists carry out partial improvements. Decisions are not made at all or only by upper management.

Level 2

Improvement mainly by specialists. Targets are set at departmental level. These must be achieved, no matter how. The costs for labour and material per unit are transparent. Standard costs are defined, monitoring mechanisms are in place.

Level 3

Clear objectives / target topics for waste reduction are defined (stocks, rejects, responsibility for indirect costs at factory level). Teams carry out cost reduction.

Level 4

Potentials are determined by value analysis. Clear goals and action plans are developed and implemented. Unit leaders prepare budgets for direct and indirect costs, make recommendations for targets and coordinate them with superiors and colleagues. 

Level 5

Budget responsibility at team level. Released resources are used for further optimization.

Productivity

Level 1

Productivity improvement through isolated instructions to work "more". Waste is ignored.

Level 2

Attempts are made to eliminate obvious waste and balance workloads. For the employees regular information on the performance of the company and its own performance level is provided.

Level 3

The eye for non-obvious waste is sharpened. Analytical waste analyses are carried out. Data is processed to compare value added to waste. Indirect activities are included and improved.

Level 4

In the reduction of waste, great importance is attached to details. Principles of economy of movement are applied. Analytical skills are developed.

Level 5

Continuous performance improvement based on agreed targets and action plans by teams. Customers and suppliers are involved.

Employee involvement

Level 1

No passing on of own implementation only for self-interest, no standardization. Hardly any formal improvement, "This is not my job, others are responsible".

Level 2

The existing system serves more for external presentation. Proposals are submitted, but implemented by others. Meetings take place regularly.

Level 3

A structured system has been introduced, but is only used by < 50% of employees. Resources are available. Everyone knows value-adding from non-value-adding activity to separate. Employees are relocating on site. Targets are agreed. Evaluation of development through process and result audits.

Level 4

CIP is part of your daily work. Core topics are intended to stimulate the imagination. Employees work together as a team on cross-team and cross-functional improvements. Infrastructure and resources are available for teamwork and on-site implementation.

Level 5

Improvements and their implementation are carried out autonomously by teams. Recognition programs (e.g. company visits, joint activities ...) are carried out.

Ideas and Solution.jpg
Read More
Little Production System Lukas Breucha Little Production System Lukas Breucha

Team Work

Team Work - what does it mean? What does it take? Great work can never be achieved alone. If you want to grow and take it to the next level - team work is key. Operations Insider - connecting the dots.

Team Work - what does it mean what does it take. Great work can never be achieved alone. If you want to grow and take it to the next level - team work is key. In this article of the “little production system” we will have a look at it and some self assessing elements.


Definition

Teamwork is characterized by the fulfillment of work tasks by a number of employees with complementary skills. They are committed to these tasks, have a common goal, use an approach for which they are committed as a team.


The targets:

  1. The activation and use of human resources

  2. The technical and organizational possibilities for achieving the company's goals


Key elements:

  1. Defined roles, tasks and communication structures for island teams, project teams, management teams, divisional and departmental teams

  2. Responsibility for quality, costs, time and improvement of standards

  3. Development of social, technical, methodological and leadership competence

  4. Regular development/appraisal interviews by managers

  5. Practical flexibility of use

  6. Regular team meetings

  7. Problem solving activities

  8. Team networking / cooperation


KPI

  • Team performance

  • Employee satisfaction


Check your organization with this brief self assessment of level of fulfillment

Work organization level of fulfillment

Level 1

Classical hierarchy, individual workstations division of labour.

Level 2

Spatial grouping of workplaces and plants to islands with classical division of labour.

Level 3

A new form of work organization has been developed and tested in pilot cases in the form of group work.

Level 4

The new form of work organization - all employees work in groups - has been implemented across the board.

Level 5

Within the framework of the agreed objectives, the groups jointly assume responsibility for quality, delivery dates, productivity and optimum use of resources.

Standards - level of fulfillment

Level 3

Standardized processes are documented and visualized.

Level 4

The established standards are lived.

Level 5

The established standards are lived and developed independently.

Communication structure levels of fulfillment

Level 3

Team or group discussion with a lack of efficiency. Established information and communication structures.

Level 4

Regular, efficient team or group discussions. A part of the communication structure is ensured across the board with the help of the "group speaker" function.

Level 5

Existing scope for action is perceived. Defined communication structures exist. Cross-team networking and cooperation serve to achieve goals.

Level of fulfillment – Qualification

Level 1

The level of qualification for professional competence is recorded according to the situation.

Level 2

The level of qualification for professional competence is regularly and systematically recorded and documented. Standardized training programs for occupational safety exist for new employees.

Level 3

The level of qualification in technical, methodological and social competence is regularly and systematically recorded and documented. For new employees, there are area-related familiarization programs.

Level 4

The level of qualification in technical, methodological and social competence is regularly and systematically recorded and documented. Demand-oriented and individual qualification plans are implemented and their effectiveness documented. Divisional and cross-divisional training programs are in place for new employees.

Level 5

The level of qualification in technical, methodological and social competence is regularly and systematically recorded and documented. Needs-oriented individual qualification plans are implemented and their effectiveness documented. Short training courses are a company standard. Divisional and cross-divisional training programs are in place for new employees.

Flexibility level of fulfillment

Level 2

Work tasks, time and place are determined by the supervisor.

Level 3

The employees organize themselves with support in terms of work tasks, time and place according to the standards

Level 4

The employees organize themselves partly independently with regard to work tasks, time and place in relation to the standards.

Level 5

The employees organize themselves independently with regard to work tasks, time and place in relation to the standards.

Read More
Little Production System Lukas Breucha Little Production System Lukas Breucha

Operating Time

The operating time is the time available for machines and systems. Targets are order adjusted usage of machinery and factories.

As usual in the series of our “little porduction system” we keep it short and serve it in a nutshell.


Definition

The operating time is the time available for machines and systems.

The targets:

Order-adjusted use of machinery and equipment.

Key elements:

e.g.

  1. The core operating time is 120 hrs/week (e.g. 5 days/week a. 24 hours) + flexibility (+ / -)

  2. The increased operating time is 144 hrs/week (6 days/week a. 24 hrs)

  3. The increased operating time in special cases is 168 hrs/week (7 days/week at 24 hrs)

  4. Team- and order-oriented use of personnel resources through flexible working hours (+ / -)

  5. Individual approval procedures are no longer necessary due to working time models agreed with the workers’ council

  6. Compliance with legal requirements and collective agreements

  7. Attendance time = working time

  8. Smooth shift hand overs without interrupting production

  9. Production through breaks

KPI

Factor of operating time used OT/168 hrs.

Level of fulfillment operating time in production

Level 1

Employees are divided into fixed shifts. Independent of the capacity situation, the shifts are run. Work absences (vacation, flextime, etc.) are primarily based on personal interests; approval by superiors. Rigid, uniform shift order without overlapping.

Level 2

Employees are divided into fixed shifts. They adapt to the current capacity situation according to instructions, various working time models can be applied using approval procedures. Work time off (vacation, flextime, and so on) is based on personal and company interests. Approval by superiors. In multi-shift operation there are fixed area-related shift changes with production interruption.

Level 3

Employees are divided into fixed shifts. Occasionally, employees adjust their working hours independently to the current capacity situation. By means of a sufficient number of agreed working time models, the entire range of necessary operating times is covered flexibly, with approval procedures. Work absences (vacation, flextime, etc.) are partly discussed in the team and coordinated with the supervisor. In multi-shift operation, there are fixed area-related shift changes without production interruption for bottleneck machines.

Level 4

Some of the employees adjust their working hours to their tasks and goals. By means of a sufficient number of agreed working time models, the entire range of necessary operating hours is covered flexibly, in some cases without the need for approval procedures. Time off work (vacation, flextime, etc.) is generally determined in the team and coordinated with the supervisor. In multi-shift operation, there are fixed area-related shift changes without interrupting production.

Level 5

Employees adapt their working hours to the tasks and objectives to be fulfilled. A sufficient number of agreed working time models cover the entire range of necessary operating hours flexibly without the need for approval procedures. Work absences (vacation, flextime, etc.) are arranged independently in the team. Work is handed over smoothly without interrupting production.

Operating time

Level 1

The core operating time is 5 working days per week á 20.5 hours.

Level 2

The core operating time is 5 working days per week á 20.5 hours. Plus special arrangements.

Level 3

The core operating time is 5 working days per week á 24 hours. Plus a maximum of one weekend shift + special arrangements. The operating time (capital-intensive / bottleneck machines) is six working days per week á 24 hours. For preventive maintenance, production downtimes are defined for bottleneck machines, taking into account dependencies.

Level 4

The core operating time is 5 working days per week á 24 hours. Plus maximum 2 weekend shifts + special arrangements.

Level 5

The core operating time is five working days per week of 24 hours. The maximum operational usage time is 6 days per week á 24 hours. The operational usage time (capital-intensive / bottleneck machines) is seven working days per week á 24 hours. For preventive maintenance, area-related production downtimes are defined taking dependencies into account.

Read More
Little Production System Lukas Breucha Little Production System Lukas Breucha

Payment

The remuneration system describes the link between performance, qualification, commitment and payment.

In this article me make it short and simple.

Definition

The remuneration system describes the link between performance, qualification, commitment and payment.


The targets:

Mobilization and utilization of the performance potentials of people, resources and organization. Remuneration is an important management instrument.

Key elements:

  1. System is simple, transparent and variable (+ / - ) and uniform for all collective agreement employees

  2. Qualification and requirements

  3. Result orientation (company, division)

  4. Coupling to standards for team/employees

  5. Achievement of objectives (team / employees)

  6. Special bonuses

  7. Performance reviews

Level of fulfillment payment

Level 1

The remuneration system is based on a description of requirements and the corresponding needs-oriented qualification for the individual workstation. Service components are partly fixed and partly variable. Target values of the employees are the degree of time and the "front water". Non-systemized, special payment independent of results at company level. No special bonuses.

Level 2

There are several charging systems. Bonus wages and other performance components are partly fixed and partly variable. Linking to performance standards is not practiced. The remuneration systems allow premiums for successful special promotions. Inconsistent, sporadic application

Level 3

Only the premium wage and the time wage exist in production. The first concepts for a uniform payment system have been developed. The remuneration systems are based on a description of requirements and the corresponding needs-oriented qualification related to individual workstations and group work. Service components are partly fixed and partly variable and linked to performance standards.

Level 4

A uniform remuneration system for wage earners has been developed and implemented in a cost-neutral manner. A uniform remuneration system has been developed and adopted for all levels. The basic performance component is linked to minimum conditions (fixed). The variable component is defined and linked to targets. Behavioural characteristics (e.g. compliance with standards) are taken into account. The remuneration system applies bonuses for defined and successful special promotions

Level 5

A uniform fee system has been implemented at all levels without affecting costs. The remuneration system is based on a description of requirements and the corresponding needs-oriented qualification for teamwork (comparison with teamwork). The variable component is defined and linked to targets. Participation in company results, divisional results according to the target agreement.

Read More
Little Production System Lukas Breucha Little Production System Lukas Breucha

Human Resources Mgt.

Human Resources Management as part of the series “little production system - short and simple. Including a self evaluation check for your own organization.

In this article we want to have a short read on Human Resources Mgt. and the impact on your production system. As standard procedure in this series we first define our understanding of HRM, the targets and key elements. Further on you will get the 5 levels of fulfillment to have a self check of your organization.


Definition

The manager creates framework conditions, gives orientation and motivates the employees to fulfill their tasks independently and efficiently.


The targets:

  1. Visions and strategies are developed and communicated

  2. Framework conditions are created and maintained

  3. Team building and team promotion is a continuous process

  4. Responsibility and decision-making competences are promoted

  5. Efficient personnel deployment is ensured

  6. Responsible handling of (personnel) resources to achieve the company's goals


Key elements:

  1. Corporate guidelines and objectives

  2. Corporate culture, conflict management, error culture, dispute culture

  3. Management structure / management span

  4. Flexibility, personal responsibility, social competence

  5. Communication and trust

  6. On-site presence of the manager

  7. Compliance with standards

  8. Employee selection and deployment

  9. Teamwork

  10. Decentralized decision-making authority within the framework of agreed rules

  11. Recognition

  12. Role model function (personal conduct and appearance)


KPI

Degree of target achievement - employee satisfaction


Self assessing the levels of fulfillment for your human resources management in your organization.

Goal oriented management structure

Level 1

Responsibility and decision-making powers are not regulated. Arbitrary decision-making processes. Employees are not involved.

Level 2

Responsibility is regulated. Decision-making competence is not regulated. Bureaucratic decision-making processes. Employees are asked about the decision-making process on a case-by-case basis.

Level 3

Responsibility and decision-making powers are regulated. Simplified decision-making processes in daily business. Employees / teams are involved on a case-by-case basis in the preparation of the decision-making processes relevant to them.

Level 4

Responsibility and decision-making powers are regulated and coordinated. Bureaucratic decision-making processes are limited to "high-quality" procedures. Employees / teams are involved in the decision-making processes relevant to them.

Level 5

Responsibility and decision-making competence are in balance. Unbureaucratic decision-making processes. Employees/teams are involved in the decision-making processes relevant to them or make decisions on their own responsibility.

Management, management culture, demands on the management level

Level 1

Differently practiced management styles available. Authoritarian leadership behavior more pronounced - "I have everything under control". Executives have high professional competence and are the "firemen" of the factory/unit.

Level 2

Management guidelines are formulated and are lived very differently. The managers work in cross-divisional projects for system development and design. They develop processes for their employees but cannot yet "let go".

Level 3

Uniform management guidelines are beginning to live. Management development programs support the new leadership roles. They encourage employees to bring in ideas for improvement, jointly draw up new standards and ensure that they are consistently adhered to. They bear responsibility for costs and budgets in their area and make consistent personnel decisions.

Level 4

Managers spend the majority of their working time on system development and on supporting and developing their employees and teams on site. Daily business is delegated. The manager trusts in the abilities of the employees and promotes them systematically, rewards efforts, supports improvements and agrees on Targets. Promotes, demands and trains the Identify and eliminate of waste. They become a leader methodologically assessed and developed.

Level 5

The manager is an "entrepreneur" for his or her area and designs a corporate culture in accordance with the company's guidelines. The Managers possess technical, social and methodological competence and use their scope for action and design. This can be seen, for example, in the promotion of employee/team initiatives and responsibility, agreeing on goals and this includes: increasing the cost of achieving objectives, determining the consequences of deviations (+/-), monitoring compliance with established standards, maintaining uncomplicated, open and honest communication in daily work, acting and acting in an exemplary manner, recognizing and using conflicts and contradictions, communicating visions and initiating innovations.

Human resource management level of fulfillment

Level 1

Planning, selection, deployment and control of personnel takes place at short notice on call.

Level 2

Planning, selection, deployment and control of personnel only takes place on a divisional basis.

Level 3

The planning, selection, deployment and control of personnel takes place across all divisions.

Level 4

Generally applicable rules for the planning, selection, deployment and control of personnel are applied.

Level 5

There is a future-oriented and long-term personnel management system with the components demand-oriented (quantity, quality) personnel planning procurement and deployment according to requirements qualification and development program exploitation of the qualification potential in the entire company. Formation of functional and efficient teams.

Read More
Little Production System Lukas Breucha Little Production System Lukas Breucha

Supporting Processes

The supporting processes (SP) provide services and material goods as a necessary prerequisite for all business processes.

Within the frame work of the series the “small production system” we have a look at the supporting processes. As usual we keep it short and to the point.

Definition

The support processes (SP) provide services and material goods as a necessary prerequisite for all business processes.

Note: Within the framework of the small production system, the SP are mainly considered in relation to value creation (e.g. service of operating resources, controlling, finance, manufacturing technology, IT, quality assurance, factory service, logistics, work preparation, purchasing, productive/unproductive material).

The targets:

  1. The value chain is designed in such a way that a minimum of support is necessary

  2. Optimum benefit for the value-adding process is guaranteed

  3. Synergies between the value-adding processes and the SP are established

  4. Specific technical know-how is available for the value-adding process.

  5. The value-adding process is relieved by the provision of the basic supply

  6. Legal framework conditions are conveyed to the operator and adhered by him.

Key elements:

  1. Transparency of the process

  2. Activity allocation

  3. Forms of cooperation

  4. Adherence to delivery dates, speed/responsiveness

  5. Customer/supplier relationship

  6. Creation of synergies

  7. Provision of specialist know-how

  8. Reduction of the SP effort

  9. Economic efficiency

  10. Development towards competitiveness

Levels of fulfillment – Transparence of processes

Level 1

Simply no transparency. Performance specifications. Catalogues of services. Process description. Lack of understanding for the necessity of benchmarking.

Level 2

Performance specifications are available. No clear structures that allow external benchmarking. Necessity for benchmarking is universally recognized.

Level 3

Service catalogues are available. Cost allocation to individual processes is given. Partial benchmarking for services and material goods

Level 4

Process sequences are documented. Costs for the entire process flow are available. Structures for benchmarking have been created. Benchmarking is increasingly applied, findings are used to optimize the processes

Level 5

Process sequences are documented and are continuously updated. External benchmarking and the resulting optimization is a continuous process. 

Cost allocation

Level 1

Allocation of costs. No cost transparency.

Level 2

Cost allocation according to expenditure. Disclosure of the monopolists' cost structures.

Level 3

Budgets via service level agreements with agreed targets.

Level 4

Service agreements with performance-based billing.

Level 5

Cost allocation on the basis of optimal processes.

Forms of cooperation

Level 1

The customer "pushes" the supporting processes.

Level 2

SP and customer approach each other as required.

Level 3

Regular comparison of activities between customer and SP.

Level 4

Planning of medium and long-term activities with common objectives.

Level 5

Synchronous, cooperative problem solving and meeting deadlines.

Adherence to delivery dates – delivery on schedule

Level 1

Delivery dates are not binding and are usually not kept.

Level 2

Delivery dates are agreed, but sometimes not met.

Level 3

Delivery dates are met. The customer will be informed in the event of a delay. The improvement of the adherence to delivery dates is continuously checked by means of key figures.

Level 4

Targets for adherence to delivery dates are agreed upon between customers and suppliers.

Level 5

Complete fulfillment to agreed customer delivery dates in 100% conforming parts.

Implementation speed

Level 1

The SP is judged by the customer to be too slow.

Level 2

Measures to improve the speed of implementation have been introduced.

Level 3

The customer increasingly feels that the implementation speed is appropriate.

Level 4

Confirmation of purchasing order in case of problems, feedback of responsibility, activities and deadlines are carried out within agreed time intervals. The customer is satisfied with the implementation speed.

Level 5

Preventive solutions for occurring problems have been developed. The service provider can act directly

Customer-supplier relationship

Level 1

Case-related statements of displeasure of the customer. No apparent reaction from the service providers. Responsibilities and processes of the service providers are not clear at first glance.

Level 2

General customer satisfaction surveys are carried out sporadically. Service providers react to deficits in customer satisfaction. Contact persons for service providers are defined and known.

Level 3

General customer satisfaction surveys are conducted regularly. The development of the results is visualized and leads to improvement measures. Contact persons for the SP's feel responsible.

Level 4

A balance sheet of the project progress for larger projects is standard. Measures for improvement are incorporated directly.

Level 5

The accounting is the basis for continuous improvement. Interdisciplinary teamwork is up and running.

Supporting Processes.jpg
Read More
Little Production System Lukas Breucha Little Production System Lukas Breucha

Target Setting

Target setting and success management describes a continuous goal agreement process, which starts with the company vision and extends to the executing team or employee. Thus all employees work target-oriented on the success of the company.

Target setting and success management is crucial for the success of all companies. If you don’t know where you want to be, sooner or later you will be lost. In this article of the series “the little production system” we will have a look at the target setting and how you can evaluate it for your organization.

Definition

Target setting and success management describes a continuous target agreement process, which starts with the company vision and extends to the executing team or employee. Thus all employees work target-oriented on the success of the company.

The targets:

  1. The formation of objectives leads to an orientation towards common process and result objectives

  2. The contribution to the corporate targets is ensured by the creation of measurement variables and continuous control of the achievement of objectives

  3. Every employee recognizes his or her contribution to the achievement of the company's targets and feels committed to "his or her" goal

  4. The achievement of objectives increases motivation and willingness to improve performance

Key elements:

  1. Company vision

  2. Company targets

  3. Strategic objectives

  4. Operational objectives

  5. Result targets / process targets

  6. 3-level voting

  7. Interdepartmental coordination

  8. Visualization in the responsible area

  9. Consistent, transparent and standardized system

  10. Freedom of action within the framework of concerted action

  11. Dealing with deviations

  12. Adaptation of the objectives to changing conditions (3 levels)


KPI

  • Degree of target achievement

Target setting and Measurements level of fulfillment

Level 4

Divisional targets are based on strategic and operational planning The goal formation process is consistent in all divisions. The process is coordinated across all divisions. Action plans are in place at divisional/cost center level to achieve the targets.

Level 5

  • Target agreement is carried out via 3-level coordination

  • Goals are coordinated across divisions

  • Goals are quantified

  • Individual goals and common goals are in harmony

  • There are goals for all levels up to the group or employee

  • At least once a year the goal formation process takes place

  • Measures to achieve the objectives are defined and documented

 Level of fulfillment - Success management

Level 4

KPIs are available. Possibilities for success control are used. Adaptation to changed conditions is carried out in part.

Level 5

  • Achievement of objectives and progress are reviewed regularly

  • In case of deviations, corrective measures are implemented and visualized

  • In the event of changes in the general conditions, the goals are adjusted

Information and communication

Level 4

There is a standardized reporting system. Targets/achievement of targets are communicated and visualized in all areas/cost centers/teams.

Level 5

  • Visualization of goals, achievement of goals and measures

  • There is a standard for the confirmation (bottom up) in case of deviations (+/- )

  • An integrated system has been installed and is used and lived in all areas and levels

     

Read More
Little Production System Lukas Breucha Little Production System Lukas Breucha

Technological Innovation

Technological innovation describes a systematic approach to securing competitiveness through new or further developed processes in production, including production-related support areas.

Within the frame work of the series the “small production system” we have a look at the supporting processes. As usual we keep it short and to the point.

Definition

Technological innovation describes a systematic approach to securing competitiveness through new or further developed processes in production, including production-related support areas.

The targets:

  1. Each cost center plans and implements innovation and technology projects for sustainable earnings improvement. Improvements in terms of costs, product quality and delivery capability are measurable.

  2. Solutions from technology projects have been incorporated into product developments.

  3. Synergy from technology projects is used organization-wide. Procedures to compensate for know-how transfer are applied.

  4. Technological leadership in core and key technologies and the associated process chains has been achieved. This leads to a positive image with customers.

  5. Discussions with customers and suppliers (internal and external) are held regularly.

Key elements:

  1. Technology projects

  2. Technology budget / costs

  3. Ideas and solutions

  4. Strategy

  5. Project Management

  6. Teamwork

  7. Organization

  8. Influence on product development

  9. Climate of innovation / corporate culture

  10. Dealing with know-how

  11. Image

  12. Benchmark

KPI

  • Innovation ratio

  • Rank in comparison with other companies

Innovations- and Technology projects – Level of fulfillment

Level 1

Sporadic technology development projects are taking place. Only solutions for individual technological problems.

Level 2

Planning and implementation of projects not comprehensive and only in the short term. Project costs are only partially and not integral anchored in operational planning.

Level 3

Target agreements on the number of projects to be completed per area of responsibility (e.g. 1 major project, 5 small projects). Systematic implementation of innovative projects in the support processes. Organizational prerequisites for recording project costs and calculable effects have been created.

Level 4

Project costs and calculable effects are entered in the installed tracking tool. Or: Percentages of the necessary savings from innovation and technology projects are entered in the operational planning.

Level 5

Systematic planning of innovation and technology projects with anchoring in operational planning (3 years). Realization of holistic, process-oriented solutions.

Funding of innovation and technology projects

Level 1

No budget planning, no cost transparency.

Level 2

Budget available for individual projects.

Level 3

System of internal financing has been established and is mainly applied.

Level 4

Development of external sources of financing systematically followed.

Level 5

Internal and external financing for projects has been developed and is being used.

Ad

Consultants Georg Tacke and Madhavan Ramanujam offer a zero -nonsense path for successful product design. Most companies go directly from scratch towards product design. They usually don’t know whether customers want and will pay for the product until launch is done. The authors describe “nine rules” for products and services designed to meet client demands and “willingness-to-pay.” 

Read more here.

 Location strategy

Level 1

Individual strategies for individual optimization are sporadically recognizable. High production depth. High number of variants, high complexity costs e.g. inventories, logistics and so on. Know-how carriers individually available, no synergy regarding know-how application.

Level 2

Core technologies are defined. Individual observations underway. Unbundling of complexity through allocation to products / locations. Knowledge is available both in central offices and decentralized. Central offices organize knowledge transfer.

Level 3

Key technologies / pacemaker technologies are defined. Overall consideration of guard rails (investment strategy, employment and qualification concept) has been carried out. Rules are defined for the selection and definition of technology partners in the context of simultaneous engineering (both for in-house production and for external procurement). Creation of manufacturing networks where economically reasonable. Working groups exchange expertise.

Level 4

Consistent application of key technologies / pacemaker technologies. Consistent application of the guard rails. Investigation / determination of production locations / production networks on a platform basis for new developments. The basis for this are defined criteria such as availability of technologies, production know-how, currency influences, logistics, existing infrastructure, social and political influences. If you have a global organization: Exchange of expertise takes place in English

Level 5

All business processes are oriented towards organization wide strategic goals. Technological leadership in core and key technologies and the associated process chains has been achieved. Worldwide application and use of existing knowledge.

Project Management

Level 1

No continuous structure available

Level 2

Planning of costs, resources, milestones for individual projects is partially executed.

Level 3

Standards for project management and controlling are used. Internal and external coordination by a central office. Project decision by technology committee.

Level 4

Coordination/networking of the thematically related projects are site-related, innovation audits are implemented by the management.

Level 5

Individual projects are coordinated with the overall project landscape worldwide. Project decisions are made by the Technology Committee and Steering Committee. Production engineering in the organization.

 Influence on product development

Level 1

No systematic Simultaneous Engineering.

Level 2

Simultaneous Engineering takes place on concrete tasks value analysis projects are carried out. Preliminary technological developments do not take place.

Level 3

Joint development of product and production system begins. Preliminary technological developments take place and flow into new products.

Level 4

Comprehensive joint development of product and production system is standard.

Level 5

The product development process has been halved in time (e.g. through platform developments and rapid prototyping with a target value of 2 years). Solutions from innovation and technology projects have been incorporated into product developments.

Innovation.jpg
Read More
 

Stay connnected


Gallery Block
This is an example. To display your Instagram posts, double-click here to add an account or select an existing connected account. Learn more

Ad

We want information fast and in a nutshell. We from OI recommend Blinkist* - because it’s simply the best.

* = Affiliate Link