First Pass Yield

First Pass Yield (FPY)

The share of units that pass a process step correctly the first time, without scrap, rework or repair.

Formula

FPY = Units good the first time / Units entering the process

Worked examples

  1. 01End-of-line test: 1,200 units tested, 1,128 pass without any adjustment. FPY = 1,128 / 1,200 = 94.0%.
  2. 02Welding station: 640 frames, 22 reworked and 6 scrapped. FPY = (640 - 22 - 6) / 640 = 95.6%.
  3. 03Software flashing of control units: 3,450 units, 41 needed a second attempt. FPY = 3,409 / 3,450 = 98.8%.

Pitfalls

  • Units repaired at the station and passed on without being logged make FPY look better than it is.
  • A high final yield can hide a low FPY when rework loops are large.