Rework Rate
The share of units that need additional work to meet the specification.
Formula
Rework rate = Units reworked / Units produced
Worked examples
- 01Paint shop: 2,300 parts, 96 sent to the repair booth. Rework rate = 4.2%.
- 02Assembly: 820 units, 31 reworked at an average of 18 minutes. Rework rate 3.8%, rework time 558 minutes = 9.3 hours per day.
- 03Electronics: 5,600 boards, 140 touched up by hand. Rework rate = 2.5%.
Pitfalls
- Rework done at the station is often invisible.
- Rework hours are a better cost signal than the count alone.