Process KPIs, Review and Register: Making Process Management Permanent

Key figures with targets and reaction limits, a monthly process review, a process register and a simple maturity rating for every process.

One redesigned process is a project. Processes that stay good are the result of routine: a few numbers, a regular meeting and a list that shows where every process of the plant stands.

Key figures with two values

After the rollout, the numbers of the baseline become the instruments of the process owner. Each one gets a target and a reaction limit. The target says where the process should be. The limit says when the review asks for a cause.

Key figure Target Reaction limit
Office lead time 5.2 days 6.5 days
Orders confirmed within 2 working days 85 % 75 %
First pass rate 84 % 78 %
Queries per 100 orders 20 28
Cost per order EUR 140 EUR 155

These are the values of the order processing in the valve plant of this series. Three to five numbers per process are enough.

Ten months in the example

The plant started at 15.7 days, a first pass rate of 58 percent and 60 queries per 100 orders. Rule changes and the pilot brought the lead time to 12.1 days in month three. The cutover in all regions followed in month five with 7.2 days. Changes in the ERP system went live in month seven, and in month nine the targets were reached: 5.2 days, 84 percent and 20 queries.

The monthly process review

The process owner meets one person per role once a month for 45 minutes. The agenda is always the same.

  1. Actions of the last review: done, late or dropped. Five minutes.
  2. Key figures against target and reaction limit. Ten minutes.
  3. The top three reasons for queries and for cases off the standard path. Fifteen minutes.
  4. Proposals for changes to steps or rules, with a decision by the owner. Ten minutes.
  5. Actions with owner and date. Five minutes.

How to keep such a meeting short is covered in the series on meetings and facilitation.

The process register

The register is the list of all processes on the map: owner, cases per year, key figures, maturity, date of the last review and next step. The valve plant keeps 14 rows. A process coordinator with half a position looks after the register and the method. Every change to a step follows one short path: proposal, decision by the owner, update of the drawing, training, date of effect.

Twice a year the managing director and all owners meet as a process board and decide which process gets attention next.

A simple maturity rating

To compare processes, rate each one on six criteria from 0 to 4: not there, started, in use in parts, in use everywhere, kept current and improved.

  • Defined. Trigger, result, customer and scope are written in a profile.
  • Owned. One owner with a mandate across departments.
  • Documented. A current drawing, rules and standards for the key steps.
  • Measured. Three to five key figures with targets, every month.
  • Reviewed. A regular review with decisions and dated actions.
  • Improved. Weak points are listed, changes follow the path and show in the numbers.

The total of 24 points puts a process on one of four levels: unmapped up to 5 points, described from 6 to 11, owned from 12 to 17, steered from 18.

Order processing started at 4 points and stood at 21 after ten months. The plant as a whole reached an average of 11.9: one process steered, seven owned, five described and one unmapped.

The rating shows the process board where the next effort goes. It is not a certificate.

Where to go from here

The valve plant chose customer service and engineering change as its next two processes. Both are described in their own series, on complaint management and on engineering change and part approval. The method stays the same: profile, capture, six numbers, weak points, five moves, an owner and a review.