A process without an owner belongs to everybody and is improved by nobody. Before a target process goes live, it needs a small set of roles and one person who answers for the whole.
Five roles
| Role | Task | In the example |
|---|---|---|
| Sponsor | Names the owner, removes obstacles between departments | Managing director |
| Process owner | Answers for design, rules and key figures of the whole process | Head of order management |
| Case owner | Follows one case from trigger to result | Member of the order team |
| Step owner | Does a step to the standard, reports weak points | Engineer, planner, accountant |
| Process coordinator | Keeps map, register and method for all processes | Half a position in operations |
The example is the order processing of a valve plant with 4,800 orders per year. Two of the five roles were new there: the process owner and the case owner.
The case owner
In the old process, an order had six temporary owners and no permanent one. A customer who asked for the status reached whoever answered the phone, and that person started to search.
In the target process, one member of the order team is the case owner of an order from the inquiry to the invoice. The case owner does not do every step. The case owner knows where the order is, notices when it rests and is the one contact for the customer. Much of the fall in lead time from 15.7 to 5.2 days comes from this simple fact: somebody is watching.
The mandate of the process owner
The process owner needs a written mandate from the sponsor. Four points are enough.
- Designs. Changes steps, forms and rules of the process after hearing the departments.
- Decides. Sets priorities between cases when the rules do not answer, and grants exceptions.
- Measures. Reports the key figures every month and calls the process review.
- Does not lead the people. They stay in their departments, with their managers.
The fourth point prevents the most common misunderstanding. A process owner is not a new department head. The owner is responsible for how the work flows, not for who does it or how well they are trained.
Owner and line manager
Conflicts between the process owner and a department head are normal. Agree in advance who decides what.
- The process owner decides how the process runs: steps, sequence, rules, forms.
- The department head decides who does the work, with which capacity and skill.
- When both cannot agree, the sponsor decides within a week.
Choose an owner with standing. An owner two levels below the department heads will not change an approval rule.
The role matrix
For each step of the target process, a matrix names who is involved and how. Four letters are enough.
- D does the step.
- A answers for the result.
- H helps with input.
- I is informed afterward.
One rule decides the quality of the matrix: exactly one A per step. Two roles that both answer means nobody does. No A means the step belongs to nobody.
In the example, the order team does and answers for the registration of the inquiry, the quote, the order and the confirmation. The sales manager answers for the approval, which applies to one quote in five. Application engineering does and answers for the deviation check. Credit check and delivery date run in parallel and are two tasks with one A each: finance and production planning. Finance answers for the invoice.
The matrix is a relative of the well-known responsibility matrix from project work, which is explained in the article on RACI.
A process owner needs about four hours per week during the redesign and a few hours per month afterward, so ownership can sit with a line manager.
With roles in place, the target process can meet real cases. The next part covers the pilot, the training and the cutover.