The target process is not invented on a blank sheet. It is derived from the current process with five moves, and the order of the moves matters: every move that comes earlier makes the later ones smaller and cheaper.
Move 1: eliminate
Ask of every step: does the customer or the law need it? If neither does, the step is a candidate for removal.
In the order processing of the valve plant, three things went. The second approval level for quotes. The technical check of orders that are identical to the quote, which is 80 percent of them. And the second check of every invoice, replaced by a sample of one in ten.
Move 2: combine
Ask whether one role or one sitting can do what two do today. Every combination removes a handoff and its waiting.
Two organization changes carried most of the effect in the example. In a daily quote cell, the case owner and an application engineer sit together for an hour and finish the quotes of the day: technical data and price at one table. And inside sales and order desk became one order team per sales region, with one case owner who follows the order from the inquiry to the invoice.
Move 3: run in parallel
Ask whether step B really needs the result of step A. In the example, the credit check and the confirmation of the delivery date ran one after the other for no reason. Started on the same day, they save two days.
Move 4: standardize
Ask whether a rule can decide in place of a person. A rule is only a rule if it has a value.
- Inquiry checklist: nine required fields before work starts.
- Approval limit: only above EUR 50,000 or above 10 percent discount.
- Credit rule: check only for new customers and above the credit limit.
- Standard lead times: planning publishes the lead time per valve family every Monday, which replaces a phone call per order.
Move 5: automate
Only now ask what software can take over. A step is a candidate when it is stable, frequent and rule based. Three small changes in the existing ERP system qualified: the quote converts into the order without retyping, confirmation and shipping documents are printed from order data, and the invoice is created at goods issue.
These changes were possible only after the earlier moves: the system can apply an approval limit only when one exists.
The target process
The result has ten steps where there were 13.
| Count | Current | Target |
|---|---|---|
| Steps | 13 | 10 |
| Handoffs on the standard path | 11 | 6 |
| Media breaks | 7 | 2 |
| Touch time in the steps, minutes | 215 | 135 |
| Waiting between the steps, days | 14.0 | 4.5 |
With queries expected to fall from 60 to 20 per 100 orders, the office lead time falls from 15.7 to 5.2 working days and the work per order from 230 to 140 minutes.
Compare and make the case
Put current and target side by side, number by number, then translate the difference into money. The 90 minutes per order are 7,200 hours per year on 4,800 orders, valued at EUR 432,000 with EUR 60 per hour.
Be honest about these hours. They are a benefit only when somebody decides what happens with them. The valve plant decided not to fill two open positions, which is EUR 192,000 with effect on cash. The invoice now leaves two days earlier, which reduces receivables by EUR 500,000 and saves EUR 30,000 of interest at 6 percent. Against EUR 222,000 per year stands a one-time effort of EUR 96,000 for analysis, pilot, system changes and training. The payback is 5.2 months.
The design is still a guess at this point. Before it meets reality, the process needs people who are responsible for it. That is the subject of the next part.