The step list says what happens. The drawing shows where the case changes hands. A good process drawing fits on one page and can be read by everybody who works in the process, without training.
Why a house rule
Formal modeling notations such as BPMN or event driven process chains define dozens of symbols. They exist for a good reason: a model that software will execute must be exact. For improvement work, the precision gets in the way. People discuss symbols and stop discussing the process.
A small rule of your own, kept on a card, is easier to draw, to read and to keep current. Six elements are enough.
The six elements
- Lane. One horizontal band per role, never per person. The customer has the top lane.
- Step. A box with a verb and an object: enter the order. One box, one role, one result.
- Decision. A question written into the flow with two exits, yes and no. One question per decision.
- Arrow. Shows what moves next. Every arrow that crosses a lane line is a handoff.
- Waiting point. A small mark with the days written next to it, wherever work rests.
- System. The name of the system or medium in small letters under the step.
Five rules for the page
- Start with the trigger at the left and end with the result at the right.
- Draw what happens in most cases. Exceptions go on a list with their share, not into the drawing.
- Number the steps. The numbers are the same as in the step list.
- Keep it to one page. If it does not fit, the scope is too large or the steps are too small.
- Date the page and write CURRENT or TARGET on it.
The example, lane by lane
Order processing in the valve plant has seven lanes and 13 steps.
- Customer: sends the inquiry, decides on the quote, places the order, receives confirmation, goods and invoice.
- Inside sales: 1 register the inquiry, 3 calculate the price, 5 send the quote.
- Application engineering: 2 clarify the technical data, 7 check the order technically.
- Sales manager and managing director: 4 approve the quote, two levels.
- Order desk: 6 enter the order, 10 send the confirmation.
- Finance: 8 check credit and terms, 12 create the invoice, 13 check and send it.
- Production planning and shipping: 9 confirm the delivery date, 11 write the shipping documents.
How to read the drawing
The drawing is a counting tool. Five counts tell most of the story.
| What to count | How to see it | Example |
|---|---|---|
| Handoffs | Arrows that cross a lane line | 11 |
| Loops | Arrows that go back to the left | 5 kinds of queries |
| Media breaks | Neighboring steps with different systems | 7 |
| Approval levels | Steps that only say yes or no | 2 |
| Waiting days | Sum of the marks at the waiting points | 14.0 |
The sum of the waiting days must equal the waiting time of the step list. If it does not, one of the two is wrong, and finding out which is a useful quarter of an hour.
Media breaks deserve a second look
A media break is every place where the same data is typed again. In the example the inquiry arrives by e-mail and is typed into the ERP system. The technical data goes into a spreadsheet, the price from another spreadsheet back into the ERP system, the approval travels by e-mail, the order is typed again from the quote, the delivery date is agreed by phone, and shipping documents are written in a word processor.
Seven breaks, each a source of typing errors.
The symbols for material flow in production follow a different logic and belong to value stream mapping. For business processes, lanes and steps are enough. The next part puts numbers on the picture.