Capturing the As-Is Process: Workshop, Workplace Visits and Tracked Cases

How to record the current process with the people who do the work and check it against real cases with dates, times and volumes.

The current process is not written down anywhere. It is in the heads of the people who do it, and each of them knows only a part. Capturing it takes two sources: the people in a room and real cases with dates.

Who sits in the room

Invite one experienced person per role, not the managers. People in the work know what is really done. Managers know what should be done. Add the process owner, who listens and does not defend, a facilitator from outside the process and one person who types the step list as it emerges.

Prepare a wall of about six meters. Draw one horizontal lane per role, the customer at the top. Put the trigger at the left edge and the result at the right.

The sequence of the workshop

The valve plant found 13 steps this way, on a normal day and including the workarounds.

  1. Follow one typical case. Each role writes its own steps on notes, one verb and one object per note: register the inquiry, calculate the price.
  2. Place the notes in the lanes in the order of time. Draw the arrows last.
  3. Ask at every step: what do you need to start, which system do you use, what do you hand over, and to whom?
  4. Ask at every arrow: how long does the case rest here, and why?
  5. Collect exceptions on a separate sheet with their share of cases. Do not draw them.
  6. Read the wall aloud from left to right until every role agrees.

Go and see

A wall of notes shows the sequence. It does not show the private spreadsheet in which the application engineer keeps his own valve data, or the mail folder in which quotes wait for approval. For that, sit next to each role for an hour and watch three real cases. In the example, the visits revealed seven places where data was typed again, from e-mail into a spreadsheet and from the spreadsheet into the ERP system.

Times and volumes

Each step needs two times. Touch time is the minutes somebody works on the case in this step. Waiting time is the working days until the next step starts. The roles estimate both for a typical case, and five cases per step are timed as a check.

Section of the process Touch time Waiting
Inquiry to quote, steps 1 to 5 95 minutes 5.5 days
Order to confirmation, steps 6 to 10 75 minutes 5.5 days
Goods issue to invoice, steps 11 to 13 45 minutes 3.0 days
Total 215 minutes 14.0 days

Volumes come from the system: 4,800 orders per year, between 310 and 480 per month. The shares of special cases matter just as much. In the example, 80 percent of the orders equal the quote, 20 percent of the quotes are large or carry a high discount, and 15 percent of the orders come from new customers or exceed the credit limit. These shares become the raw material of the redesign, because a check needed for one case in five should not be done for five in five.

Track real cases

Estimates are polite. Dates are not. Take 30 to 50 closed cases of the last three months, in the order of their numbers, and read the start and end of each section from the systems. The valve plant tracked 50 orders.

The average office lead time was 15.7 working days, the fastest order needed 8 days and the slowest 27. The step list had predicted 14.0 days of waiting plus the work. The gap had a cause: queries. In 21 of the 50 orders at least one question went back to the customer or to a colleague, 30 queries in total.

The next part turns the wall into a drawing that fits on one page.