Ask five managers how their projects connect to the strategy and you get five presentations. The X-matrix answers the same question on one sheet of paper.
Four quadrants around a center
The matrix has an X in the middle and four lists around it:
- South: three to five-year targets, for example lead time from 18 to 8 days.
- West: annual breakthrough objectives, for example pull between assembly and pre-assembly, lead time 13 days by December.
- North: top-level improvement priorities, the projects that deliver the objectives, for example Kanban loops for 120 part numbers, changeover time on two presses halved.
- East: measures to track the priorities, for example number of part numbers in pull, changeover minutes, stock in days.
On the far right, a column of owners and team members shows who works on each priority.
The correlations
The corners between the lists hold dots that show which elements are linked: which annual objective serves which long-term target, which priority serves which objective, which measure tracks which priority, who works on what.
Reading the dots is where the value lies:
- An annual objective without a link to a long-term target is a favorite project.
- A long-term target without any annual objective will not move this year.
- A priority without a measure cannot be reviewed.
- A person with dots in six rows is overloaded, whatever the plan says.
A small example
A plant with the lead time target defines two annual objectives: pull between assembly and pre-assembly, and a 50 percent reduction in changeover time on the two bottleneck presses. Four priorities serve them: Kanban loops, a supermarket next to assembly, quick changeover workshops, and a revised daily planning routine. Five measures track them. Six people own or support the work, and two of them appear in three priorities each. That is the first discussion the matrix triggers.
How to build it
Build the matrix in a workshop with the leadership team, on paper first. Fill south, then west, then north, then east, then the correlations. Expect two or three rounds. Most of the work is deleting, not adding.
Keep the matrix to one page. If it needs more, the organization is trying to do too much.
Below the top level
Each owner of a priority can build a smaller matrix for the next level, with the priority as the objective. Two levels are usually enough for a plant. More levels create paper, not alignment.
The matrix shows the plan. Catchball, the topic of the next part, turns it into commitments.