Incoming Inspection and Traceability
Put the inspection hours where a defect would do damage, and keep records good enough to find a lot again. 6 parts in three blocks, from risk classes and sampling plans to the flow at the dock, blocked material, skip lot release and a trace in both directions.
Checking every delivery the same way feels safe, and it is the most expensive way to miss a defect. This series follows one worked example, a plant for hydraulic valve blocks with 480 purchased part numbers from 64 suppliers and 5,760 goods receipts a year, through the whole sequence: scoring every part by the effect of a defect, how likely it arrives and where it would be found; writing a sampling plan and knowing what it accepts and what it cannot prove; organizing the flow at the dock so that nothing waits three days for a check that takes twenty minutes; blocking, deciding and closing nonconforming lots; releasing a supplier to reduced inspection and skip lot on evidence; and linking supplier lots to serial numbers so that a trace in both directions takes hours instead of days. The same plant runs through every part, from 90 inspected receipts a week to 45, and from a 31 hour trace to a 2.5 hour trace.
Block 1Decide What to Inspect
Block 2Run the Receiving Process
Block 3Trace and Prove
No part found. Try a shorter word.