Skip to content
Series | 6 parts

Value Analysis and Value Engineering

Bring the cost of a product down through its functions without taking from the customer what the customer pays for. 6 parts in three blocks, from the cost statement and the function tree to function costs, ideas, the requirements matrix and the confirmed saving.

A request to cut ten percent from every part produces thinner walls, cheaper suppliers and unhappy customers. Value analysis asks a different question: what does the product do for the customer, what does each of these functions cost, and what is it worth? This series follows one worked example, a coolant pump with 12,000 units per year, a unit cost of EUR 220.00 and a target cost of EUR 196.00, through six steps: how to choose the object and state the cost per component, how to describe functions as verb plus noun and arrange them in a function tree, how to spread the cost across the functions and compare it with their importance for the customer, how to find and rate ideas per function, how to translate customer requirements into technical characteristics, and how to set target costs and track the saving until controlling has confirmed it. Value engineering applies the same steps to products that are still being designed. Standards such as EN 12973 and VDI 2800 are named and explained, not reproduced. The series builds on Cost and Controlling for the calculation and complements Innovation Management, Quality Tools and Supplier Management.

6 parts

Newsletter

One Lean idea.
Every two weeks.