Cost and Controlling | Part 1 of 10

Where the Money Goes in a Plant

Six cost types and a handful of cost centers explain almost every plant. Know their size and their owners before you discuss details.

Ask an area manager what their area cost last year and the answer is often a shrug. The number exists, but it lives in controlling. Operations sees it once a month as a report, and usually too late to act.

Steering cost starts with a simple picture: how big are the blocks, and who owns them?

Six cost types

A plant that machines and assembles valve housings, with about 420 people, spends EUR 58.0 million a year:

Cost type EUR million Share
Material 31.0 53 %
Personnel 15.6 27 %
Depreciation 3.6 6 %
Other overhead 3.2 6 %
Energy 2.4 4 %
Maintenance and tooling 2.2 4 %

The picture changes the priorities. One percent less material loss is worth EUR 310,000 a year. A 20 percent energy program brings EUR 480,000. Both are worth more than most debates about a single indirect position. Start where the blocks are large and where operations has a lever: scrap and yield for material, productivity and overtime for personnel, base load and leaks for energy.

Cost centers and owners

A cost center collects the costs of one area: machining, assembly, logistics, maintenance, quality, plant administration. Its most important attribute is not the number but the owner, one named person who receives the report and can explain it.

The rule is simple: the person who can influence a cost receives its report. If the maintenance manager cannot see spare parts by machine, nobody steers spare parts. If energy is spread over all areas by floor space, no area manager has a reason to switch off machines at the weekend.

Three booking rules

Most arguments between operations and controlling are about where a cost was booked. Three rules prevent them:

  • Book where it arises. A spare part for a machining center goes to machining if the machine has its own cost record.
  • Meter what is large. Energy of the main machines and compressed air are measured, not allocated by square meters.
  • Write it down. One page of booking rules, signed by the plant manager and the controller.

A cost map in one afternoon

Take last year’s costs from controlling and put them into a simple grid: cost types in rows, cost centers in columns, owners in the header. Mark each cost type as fixed or variable in the short term.

The result fits on one page. It shows where the money goes, who is responsible, and which blocks change with volume. Every later step in this series builds on it: rates, product cost, budgets and variances.

A plant that cannot draw this map does not have a cost problem yet. It has a visibility problem, and that one is much cheaper to solve.