Ask a head of purchasing how much the plant spends on machined parts, with how many suppliers, and how much of it runs under a contract. In many plants the honest answer takes two weeks. Spend analysis is the work that makes the data answer.
One table, twelve months
The basis is a table of paid invoices of the last twelve months, without tax. Orders show intent. Invoices show what happened. Each line needs six fields: supplier, amount, material group or item text, requester or cost center, purchase order number and contract reference.
The example in this series is a plant for industrial pumps with 380 employees, EUR 48.0 million of revenue and EUR 24.0 million of purchasing volume. Half of every euro of revenue leaves the plant through purchasing. One percent less purchasing cost is EUR 240,000 and raises the operating result of EUR 2.4 million by 10 percent.
Clean before you count
Raw data misleads. Four steps make it usable:
- Merge suppliers that appear under several numbers or spellings. The plant had 412 supplier records and 340 suppliers.
- Give every line one category. Start with the supplier, because most suppliers deliver one category. In the plant, 18 percent of the spend carried no or a wrong material group.
- Mark every line as ordered by purchasing or not, and as under contract or not.
- Check the total against the accounts. A gap of more than 2 percent has a reason you need to know.
One buyer and the controller did this in two weeks. Do not wait for perfect data. Start when 95 percent of the spend has a category.
Three sides of the cube
The same spend is read from three sides: what is bought, from whom, and for whom.
| Category | Suppliers | Spend (EUR 1,000) |
|---|---|---|
| Castings | 6 | 5,760 |
| Machined parts | 41 | 4,080 |
| Electric motors | 4 | 3,360 |
| Sheet metal and welded parts | 22 | 2,400 |
| Seals and bearings | 9 | 1,920 |
| Freight | 31 | 1,680 |
| MRO and tools | 168 | 1,440 |
| Energy | 2 | 1,200 |
| Fasteners and standard parts | 45 | 1,200 |
| Packaging | 12 | 960 |
Three categories carry 55 percent of the spend, and ten suppliers carry 49 percent. Production triggers 78 percent of the demand, logistics 11, maintenance 6 and facility 5.
The combinations say more than each side alone. Castings and motors, EUR 9.12 million, come from 10 suppliers: here the plant depends on the supplier. Machined parts are spread over 41 suppliers without a tender in years. MRO, fasteners and packaging have 225 suppliers, two thirds of all, for 15 percent of the spend.
Maverick spend and contract coverage
Two numbers show how much of the spend purchasing really steers. Maverick spend is spend that was ordered without purchasing or outside an existing agreement. Contract coverage is the share of spend under a valid frame contract or price agreement.
In the plant, EUR 2.64 million or 11 percent was maverick spend. It sat in five categories: 70 percent of MRO, 40 percent of freight, 30 percent of fasteners, 25 percent of packaging and 15 percent of sheet metal. Contract coverage was 55 percent, almost all of it in castings, motors and energy.
Maverick spend is not a question of guilt. Technicians order by phone because the official way is slower. The cure is a faster official way: a catalog, a call-off contract or a bin system that needs no buyer for the single order.
What to take from the cube
A good first spend analysis ends with five findings on one page, each with a number: concentration, fragmentation, the tail, small orders and bypass. In the plant, 9,050 of 14,600 orders were below EUR 500.
The cube does not decide anything yet. It shows where to look. The next part sorts the categories.