Many plants start their energy work by buying a large metering system. A year later they have hundreds of data points, a dashboard nobody opens and the same base load as before.
The better question is not how much to measure. It is where a decision depends on a number.
Five levels
A practical meter concept for a mid-size plant has five levels:
- Plant: electricity, gas and water at the main supply. Read monthly, and ask the supplier for the 15-minute load profile.
- Building or hall: electricity per main distribution, read weekly.
- Utilities: compressors, cooling, heating and ventilation, read weekly.
- Big consumers: machining centers, washers, test benches. Fixed meters on the largest, read daily for the board.
- Process: single machines and their states. Loggers for one week when you analyze a step.
The ten largest consumers often use 70 to 80 percent of the energy. Start there.
One meter list
Every meter belongs on one list: number, location, what it measures, unit, who reads it, how often, and where the data goes. In the valve block example the list has ten meters, from the main electricity meter E0 to the water meter W0, which is read every Sunday night.
A meter without an owner on that list is a cost, not a measurement.
Check the balance
The sub-meters should add up to the main meter within 5 to 10 percent. A larger gap means a missing meter, a wrong conversion factor or a reading error. Check the balance every month. It is the simplest quality check of your data.
Always link to output
An energy figure alone says little. 352 MWh in April is neither good nor bad until you know that the plant made 52,000 good parts in the same month.
Read every energy figure together with the good parts of the same period. The result, energy per good part, is the number that goes on the board. Use good parts, not produced parts, so that scrap shows up in the figure.
The data you already have
Before you buy anything, collect what exists:
- twelve months of bills for electricity, gas and water,
- the load profile from your electricity supplier,
- counters on compressors and running hours on machines,
- output and scrap per month from production.
Then add one clamp-on logger, a few hundred euros, and put it on the three largest consumers for one week each. The profiles usually show more waste than anybody expected.
Read the season
Gas consumption per part can triple in winter because of heating. Compare each month with the same month of the previous year, or separate heating from process energy with a sub-meter on the washer.
A good meter concept grows with the questions. Expand where the data shows a need, not where a catalog shows a product.