The easiest energy saving in most plants is also the most invisible one: everything that runs when nothing is produced.
Measure it on a Saturday
Read the main electricity meter twice on a Saturday afternoon, one hour apart. The difference is the base load in kW. If your supplier sends a 15-minute load profile, you can read it directly as the flat line on weekends.
In the example plant the base load is 280 kW. The plant produces 5,000 hours a year, so it stands still for 3,760 hours. That is 1,053 MWh, a quarter of all electricity, EUR 210,560 and about 400 t CO2e per year, spent on nothing.
What the walk finds
A walk through the halls without production usually finds the same things:
- machining centers in standby with coolant pumps and chip conveyors running,
- compressors running only to feed leaks,
- washers heating their baths all weekend,
- lights and ventilation in empty halls,
- test benches that are never switched off.
The cause is rarely technical. Nobody owns the switch, and people fear the Monday morning.
Shutdown and restart in one standard
Write one standard per area that covers both directions. For each machine or system: what happens at the end of the last shift, how long the restart takes, and who does it.
In the example the machining centers go into standby with pumps and conveyors off and need a 20-minute warm-up program on Monday. The washer heating switches off and a timer starts it at 04:00 so the bath is ready at 06:00. Compressors go off and the hall valves close.
Test the restart once with the team and measure it. The warm-up is almost always shorter than everybody feared, and that measurement ends most of the resistance.
The target
The target base load is what must run for safety and infrastructure: security, IT, frost protection, emergency lighting. In the example that is 160 kW. Reaching it saves 120 kW over 3,760 hours: 451 MWh, EUR 90,240 and 171.5 t CO2e per year, for about EUR 24,000 of timers, switches and time to write the standards.
Keep it alive with one number
After four weeks the example plant reached 196 kW, after twelve weeks 162 kW. What kept it there was a single routine: maintenance reads the main meter every Monday morning and writes the Sunday base load on the board.
Any week above 200 kW gets a short look at what was left running. Holiday weeks get their own shutdown list. One number, read every week, keeps the whole routine alive.