Lean and Green | Part 6 of 10

Compressed Air: Leaks, Pressure and the Tag System

Measure the leakage rate, tag every leak, lower the pressure and switch off outside production. Most of it pays back within months.

Compressed air feels free because it comes out of the wall. It is the most expensive form of energy in a plant. Only about a tenth of the electricity a compressor uses ends up as useful work at the tool.

Measure the leakage

The test is simple. On a quiet day, switch off all consumers, keep the network pressurized and measure how long the compressor runs loaded within 30 minutes. With no demand, every minute of loaded running feeds leaks.

In the example plant the compressor ran loaded for 9.6 of 30 minutes. The leakage rate is 32 percent. The compressors use 720 MWh per year, so about 230 MWh, EUR 46,080 and 88 t CO2e go into leaks.

Good practice is below 10 to 15 percent. Repeat the test at least twice a year.

The tag system

A leak walk works best when the hall is quiet: a weekend, a break, or with an ultrasound device during production. Every leak gets a tag with a number, the date and its size: small, medium or large. The tag stays on the leak until it is fixed.

Open tags go on the board. Tags older than two weeks are discussed in the weekly meeting.

In the example the first walk found 46 leaks, and 38 were fixed within four weeks. Couplings, hoses, filters, drains and valve islands are the usual suspects. That is the whole system, and it works because every leak becomes visible and has an owner.

Five levers in order

  1. Fix leaks and keep them fixed. In the example the target of 12 percent saves 144 MWh, EUR 28,800 and 54.7 t CO2e per year for about EUR 9,000.
  2. Lower the pressure. As a rule of thumb, every bar costs 6 to 8 percent of compressor energy. From 7.5 to 6.5 bar the example saves about 50 MWh per year. Test first that every consumer still works.
  3. Shut off outside production. A valve per hall and the compressor off on weekends removes leakage and standby losses at once.
  4. Replace misuse. Blowing off parts with open pipes, cooling with air or cleaning workplaces with air guns: fans, brushes and proper nozzles do it with a fraction of the energy.
  5. Use the heat. Up to 90 percent of the compressor input becomes heat. More on that in the next part.

Verify with the meter

Four weeks after the leak program, the example plant read its compressor sub-meter again. Corrected for output, the saving was about 13 MWh in four weeks, more than planned.

Compressed air savings are among the fastest in any plant. They only last when the tags stay on the board.