Waste heat from compressors, washers set by habit, pumps at fixed speed and old lighting: how to find and rank the heat and building measures.

In many plants heat is produced in one place and needed in another, and the two never meet. Compressors blow warm air into the yard while the washer next door burns gas to heat its bath.

Connecting the two is often the largest single measure in the plant.

Find the sources

Walk the plant with a simple question: where is something warm that nobody needs warm?

  • Compressors: up to 90 percent of their electrical input becomes heat, often at 60 to 70 degrees Celsius in oil-cooled machines.
  • Cooling circuits: hydraulics, spindles and coolant systems remove heat to the outside air.
  • Furnaces and dryers: exhaust air and hot surfaces.
  • Washers: open lids and uninsulated tanks lose heat to the hall.

In the example plant the three compressors produce about 400 MWh of usable heat per year.

Find the needs

Then ask where heat is bought: hall heating in winter, washer baths, hot water. In the example the washer and the hall heating use 1,800 MWh of gas per year.

Heat recovery from the compressors to the washer and the hall heating saves about 300 MWh of gas, EUR 18,000 and 60 t CO2e per year. The investment of EUR 45,000 pays back in two and a half years. It is not a quick win, but it is one of the most reliable investments in the plant.

Test the temperature

Process temperatures are often set by habit. The washer in the example ran at 80 degrees Celsius because it always had. A cleanliness test at 60 degrees, done with the quality department, showed the same result.

Together with lids and insulation, the lower temperature saves 180 MWh of gas per year for EUR 8,000. Write the new value into the standard so that it does not drift back.

Electricity in the building

Two measures appear in almost every plant:

  • Variable speed drives on pumps and fans that run at fixed speed against a valve. In the example the cooling pumps save 90 MWh per year with a payback of about 1.2 years.
  • LED lighting with presence and daylight control in halls that still use old tubes. In the example hall 2 saves 120 MWh per year. The payback of almost three years is long, but the lights last 15 years.

Cut first, then electrify

Many plants plan to replace gas with heat pumps or electric heating. That is a good direction, but the order matters. Every kilowatt hour of heat you no longer need is one you do not have to electrify. Recover the waste heat and lower the temperatures first, then size the new system for the demand that remains.

Heat measures need more engineering than switching off machines. Start with the numbers: a list of heat sources and heat needs, each with temperature and MWh per year, shows the best pairs within an afternoon.