Most plants have a quality management system. Fewer plants are managed with it. The difference is easy to see: in one plant the system is a shelf of documents that comes alive four weeks before the audit. In the other, it is how the management team decides, every month.
This series follows one plant through the change. It casts, machines and assembles aluminum housings for pumps and drives, with 260 employees and sales of EUR 46 million. It has been certified for eleven years. And it has a problem: the last external audit ended with 2 major and 9 minor findings, and recertification is due in twelve months.
A paper system and a working system
A paper system is written by the quality department for the auditor. It describes how things should be. It grows with every finding, because each finding is answered with one more form and one more signature. Its objectives read like “improve quality awareness”.
A working system is written by the people who run the processes, for themselves. It describes how things are done and is changed when they change. It shrinks when a document is not used. Its objectives have a number, a date and an owner.
A simple test separates the two. Take the management system away for one month. If nobody in the plant notices, it was a paper system.
Six numbers about the system itself
Before anything is rewritten, count. These six numbers need no software, only an afternoon.
| Number | Example plant |
|---|---|
| Process descriptions with one named owner | 12 of 31 |
| Process descriptions with a key figure and a target | 7 with a figure, 0 with a target |
| Objectives with number, date and owner | 0 of 11 |
| Controlled documents | 412 |
| Open actions that are overdue | 29 of 64 |
| Nonconformities whose cause had occurred before | 27 percent |
The cost is not abstract. Scrap and rework ran at 3.1 percent of sales, EUR 1,426,000 a year. Customers sent 58 complaints a year. On-time delivery stood at 88 percent.
What a system is not
Two misunderstandings keep paper systems alive.
The system is not the manual. The system is how the plant works: who accepts an order, who releases a part, who decides when something is wrong. The manual is a short description of it. In the example plant the manual had 84 pages. After the change it has 12.
The system is not the job of the quality manager. Each process belongs to its owner. The quality manager keeps the pattern, the register and the calendar.
A word on standards
Standards such as ISO 9001 describe what a quality management system must achieve. This series does not reproduce or summarize any standard. It explains how to build a system in plain words and in the order a plant would build it. If you plan a certification, obtain the valid edition of the standard itself and read the requirements there.
Where the plant ends up
Twelve months later the plant runs 14 processes with one owner and a one-page profile each, 186 documents instead of 412, six objectives instead of eleven, and one action register with 27 open actions, 4 of them overdue. Complaints fell to 31, scrap and rework to 2.6 percent. The recertification audit ended with 0 major and 3 minor findings. The following parts show how, step by step.