Quality Management System
Build a quality management system that runs the plant instead of filling folders. 12 parts in four blocks, from purpose, scope and objectives through the process landscape, lean documents and roles to operational control, corrective action, the management review and certification as a project.
Most plants have a quality management system, and few are managed with it. The system sits in folders, comes alive before the audit and belongs to the quality department. This series shows how to build the other kind: a system that the management team uses to decide. It follows one worked example, an aluminum die casting plant with 260 employees, 31 process descriptions, 412 controlled documents and 64 open actions in four lists, through twelve months: what a system is for, who expects what and what is in scope, a policy and six objectives with numbers, a landscape of 14 processes with one owner and a one-page profile each, documents cut to 186, critical roles with deputies, risks on the profiles, control points from order to delivery, control of external providers, one register for every action, a management review that ends with decisions, and the preparation of an external certification as a project with effort and benefit in EUR. The series explains the system in its own words and its own structure. It does not reproduce any standard: for a certification, obtain the valid edition of the standard itself. It is the roof over the series on internal audits, complaint management, work instructions, supplier management and the other quality topics.
Block 1Give the System a Direction
Block 2Build the Structure
Block 3Run and Control
Block 4Check, Improve and Certify
No part found. Try a shorter word.