Skip to content
Quality Management System | Part 5 of 12

Lean Documented Information: What a System Really Needs

How to count documents, decide what stays and control the rest, with a plant that went from 412 to 186 documents.

Standards for management systems speak of documented information and leave it to the organization how much it needs. Most plants answer with far too much. The example plant of this series had 412 controlled documents for 260 employees. Of these, 147 had not been opened or revised for three years.

Count before you write

Before a single document is rewritten, count what exists.

Type Before After
Manual 1 1
Process profiles 0 14
Procedures 38 9
Work instructions 196 104
Forms 141 58
Lists, specifications and other 36 0
Total 412 186

The manual shrank from 84 to 12 pages. Twenty procedures were replaced by the one-page process profiles, nine were withdrawn. Of the work instructions, 58 described machines and parts that no longer existed, and 34 were duplicates per machine group. Of the forms, 49 were filled in by nobody or read by nobody. The 36 lists and specifications turned out to be records or external documents: they are kept, but not controlled as documents.

Four questions for every document

The process owner decides, with four questions.

Does somebody need it to do the work the same way every time? Would a trained person make a mistake without it? Does a customer, a law or the standard you follow ask for it? Was it opened or changed in the last three years?

Control in six rules

Control means that the right version is at the workplace, somebody answers for it, changes are decided and old versions are gone. The plant does it with six rules.

One register. Every controlled document is one row with number, title, type, process, owner, version, release date and next review.

One owner. The process owner releases the documents of the process. The quality manager checks form, number and register entry.

A review interval. Profiles and procedures every year, work instructions and forms every two years, and at every change.

Distribution. Released documents are read on screens at the workplaces. Printed copies exist at 14 listed places and are exchanged by the document controller.

Changes. Anyone can request one, the owner decides, the version history shows it.

Withdrawal. Withdrawn documents leave the screens the same day and are archived as read-only.

Documents and records

A document says how something is to be done. A record shows what was done and what came out. The work instruction for the leak test is a document. The leak test result of one housing is a record.

Documents change with a new version. Records never change: they are corrected visibly, not rewritten. Documents need release and review. Records need a place, protection, a retention period and a rule for disposal.

The plant wrote a short list: which record, which process, where it is kept and for how long. Order reviews and release records are kept for ten years, audit reports and management reviews for six. These are the plant’s own decisions, not a recommendation. Retention periods follow from laws, contracts and customer requirements that differ by country and industry, and they should be checked for each case.

The saving

Each controlled document costs about 1.5 hours a year to review, release and distribute. With 226 documents fewer, the plant saves 339 hours or EUR 20,340 a year at EUR 60 per hour. That is the smallest part of the benefit. The larger part is that people trust the documents that remain.

After twelve months the register lists 186 documents, and four forms are past their review date. The quality manager shows this number in every monthly meeting, per process owner. How a single work instruction is written, tested and trained is covered in the series on work instructions.

Newsletter

One Lean idea.
Every two weeks.