Skip to content
Quality Management System | Part 4 of 12

Process Landscape, Process Owners and the Process Profile

How to get from 31 process descriptions to 14 processes with one owner and a one-page profile each.

Every plant has processes, whether it has described them or not. The process landscape makes them visible on one page. The process profile makes each one manageable. Together they replace most of what used to be a manual.

From 31 descriptions to 14 processes

The example plant, a die caster with 260 employees, had 31 process descriptions. When the management team looked at them together, it found three kinds. Nine followed departments, such as “quality assurance” or “production hall 1”. Seven described single activities such as calibration or packing. Fifteen were real processes, some of them described twice or only because a past audit had asked for them.

The team followed one typical order from the inquiry to the payment, wrote every step on a card and grouped the cards. The result fits on one page.

Type Processes
Management Strategy, objectives and review. Documents, audits and system care. Nonconformity, corrective action and improvement.
Core Quote and accept orders. Launch products and processes. Purchase and control suppliers. Plan production. Produce. Ship and serve customers.
Support People and competence. Maintenance and tooling. Inspection and measuring equipment. IT and master data. Warehouse and internal transport.

Three rules shaped it. Ten to sixteen processes: more do not fit on one page or in one head. Follow the order, not the organization chart: a process starts with a trigger and ends with a result somebody needs. And test every process with two questions: can one person own it, and can its result be measured? If not, cut or merge.

One owner, by name

A process without an owner is a description. The owner is one person by name, not a department and not two people.

The profile on one page

The process profile replaces the procedure of ten pages. Here is the one for the first core process.

Purpose. Accept only orders the plant can fulfill: the part, the date and the price.

Owner. Sales manager. Deputy: inside sales lead.

Trigger and inputs. Customer inquiry or order, drawing and specification with revision, lead-time table from planning, cost calculation.

Results. Quotation, feasibility record, confirmed order with date, open points handed to engineering and planning.

Key figures. Orders confirmed with a feasibility check: 64 percent, target 100. Quotation lead time: 9 working days, target 5.

Risks and controls. An order is confirmed against an outdated drawing revision: the revision is checked against the customer portal at order entry. A date is confirmed without a capacity check: dates outside the lead-time table need the planner.

Documents and records. One procedure, four forms. Records: feasibility record, order confirmation.

How to write it

The owner writes the profile with two people who do the work, in ninety minutes. Start with the result and the customer of the process, then go back to the trigger. Choose one or two key figures the owner can influence. Name the two or three things that go wrong most often or hurt most. And list only the documents the process needs: anything not on the profile is a candidate for withdrawal.

Handovers

Most problems sit between processes. For each handover, the two owners agree on one line: what is handed over, in which state, by when. Between order acceptance and planning it reads: “A confirmed order arrives in planning with drawing revision, quantity, date and special requirements. Dates outside the lead-time table are agreed before the confirmation.”

What changed

Before, 12 of 31 descriptions had a named owner and 7 named a key figure. Now 14 processes have an owner, a profile and two key figures each, 28 in total. After twelve months 13 of them were on target, and all 28 were measured. The owners meet once a month for sixty minutes and talk only about the misses.

Newsletter

One Lean idea.
Every two weeks.