The most common mistake in value stream mapping happens before anyone picks up a pencil: the team tries to map the whole plant. A map needs a unit that is small enough to walk in a day and large enough to matter. That unit is the product family.
What makes a family
A product family is a group of products that run through the same or very similar process steps on the same equipment.
The tool to find families is a simple matrix: products in the rows, process steps in the columns, in the order of the flow. Mark every step a product runs through, then sort the rows until blocks with the same pattern appear.
The matrix of the example plant
The die casting and machining plant of this series makes eight products.
| Product | Steps | Pieces per day |
|---|---|---|
| H40, H60 pump housings | Cast, trim, CNC, leak test, assembly | 450 |
| C20, C25 covers | Cast, trim, powder coating | 650 |
| B10, B12 brackets | Cast, trim, CNC | 700 |
| V30 valve body | Cast, trim, CNC, leak test | 120 |
| H80 large housing | Cast, trim, CNC, leak test, assembly | 60 |
Four patterns appear at once. The covers skip machining and get coated. The brackets end after machining. The valve body is tested but not assembled.
Three rules
Similar steps, especially near the customer. Products that share the downstream steps belong together, even if they start on shared equipment upstream. Almost everything in this plant starts in die casting, so die casting does not separate families. Assembly does.
Similar work content. The processing time per piece should not differ by more than about 30 percent within a family. H80 runs through exactly the same steps as H40 and H60. But it needs 640 seconds of processing against 450, is cast in a different cell and ships to a different customer. It becomes a family of its own and is mapped later.
A reason you can write down. Choose the first family by a criterion: revenue, delivery problems, inventory or a customer complaint. The housing family stands for 50 percent of revenue, has an on-time delivery of 91 percent and takes the longest route through the plant. That is three reasons.
Scope: door to door
Map one plant from the receiving dock to the shipping dock first. Supplier and customer appear as boxes with their delivery data. Shared equipment such as the die casting cell stays on the map, with a note on the time other products take.
Keep the detail coarse. The housing stream has five process boxes. If your first draft has fifteen, you are drawing work steps.
The customer data
Before the walk, three numbers about the family have to be on the table:
- Demand per day: 450 housings, 300 of H40 and 150 of H60
- Pack quantity: returnable containers of 25
- Delivery: one truck per day
With two shifts of 450 minutes, the available time is 54,000 seconds per day. Takt time is 54,000 divided by 450, which gives 120 seconds. Every cycle time on the map will be compared with this number.
The value stream manager
A stream crosses departments, and every department has its own manager with its own targets. If nobody owns the stream as a whole, the map becomes a negotiation between casting, machining and logistics.
Name one person who is responsible for the family from door to door and reports to plant management. In a plant of this size that is a line manager with a mandate, not a new position. In the example it is the production manager of the housing area, who owns both maps and the plan.