Skip to content
Series | 8 parts

Value Stream Mapping

See how material and information really flow, then design a shorter stream. 8 parts in three blocks, from the product family matrix and the walk to the current state map, the lead time ladder, the eight questions of the future state, loops and the value stream plan.

A part spends minutes in the processes and days between them. Value stream mapping is the method that makes those days visible and then removes them by design instead of by a list of projects. This series follows one worked example, a family of aluminum pump housings with a demand of 450 pieces per day and a takt time of 120 seconds, through the whole sequence: why to map the stream, how to choose the product family, how to walk the flow and fill the data boxes, how to draw the current state and calculate the lead time ladder and the flow efficiency, how to answer the eight questions of the future state, how to size supermarkets and FIFO lanes around one pacemaker, and how to cut the design into loops with a plan that is reviewed every month. The example goes from 16.5 to 5.0 days of lead time. The series deepens the Flow and Just in Time module of the Production System.

8 parts

Newsletter

One Lean idea.
Every two weeks.