A register, a distribution list and five acts on release day make sure that only one version of an instruction exists at the stations.

When the assembly area of the example plant took stock, it found 46 printed instructions at its stations. Thirteen of them were outdated. Two shifts at the same station worked from two versions.

There was no mechanism that took the old sheet away when a new one was released. Document control is that mechanism. It answers one question at any time: which version is valid, and where is every copy of it?

Six elements

  • Identifier. Fixed for the life of the instruction. No version, product name or year in it. The pilot instruction is WI-A3-021.
  • Version. The first number changes with the content and requires training. The second number changes with editorial corrections and requires a notice at the shift start. Version 2.0 became 2.1 when a photo was replaced.
  • Approval. Author, owner and quality sign. The safety officer signs when a safety key point changes.
  • Register. One row per instruction with owner, release date, review interval and next review date.
  • Distribution list. One row per printed copy with number, place and issue date.
  • Withdrawal. Old copies are collected on the release day and destroyed. The master of the old version is archived as the quality system requires.

The register

The register is one list for the whole area. The next review date is calculated from the release date and the interval: 12 months for class A instructions, 24 months for short instructions. A status date shows which reviews are due within 90 days and which are overdue.

At the start, 21 of the 38 documents on file were overdue. One of the others was worse. The old instruction for station A3 had been signed as reviewed in 2025, although nobody had watched the job with it since the leak tester was replaced in 2023. A signature is not a review. A review means watching one cycle with the sheet in the hand.

The distribution list

Every printed copy gets a number, a stamp as a controlled copy and a row on the list. The instruction for A3 has two copies: number 1 at the station and number 2 in the training folder. Nobody prints further copies. A sheet that is not on the list is collected, whoever hung it up.

It is the only way to count copies out and count them in again.

Release day in five acts

  1. The training record is complete for everyone who does the task.
  2. The register shows the new version and the next review date.
  3. The new copies are printed, numbered and stamped.
  4. Old copies are collected against the distribution list, and the new ones are hung in the same walk.
  5. The collection is confirmed with date and signature, and the team hears about it at the shift start.

The order matters. Training comes first, because an unknown sheet at the station creates exactly the deviation it should prevent.

After twelve weeks

Measure Start Week 12
Class A instructions in the new format 0 of 14 14 of 14
Controlled copies of class A instructions None 31
Outdated copies at the stations 13 0
Notes and photos without registration 4 0

The four handwritten notes deserve a remark. They were the instructions operators really used, and each of them contained a key point that the official document lacked. They were not thrown away. They went into the new instructions.

Changes

Anyone can request a change with a short form: instruction, step, what should change and why. The owner answers within ten working days. In the first twelve weeks the pilot area received seven requests. Six were released, on average five days after the request, the longest after nine.

A change of content takes the same path as a new instruction: tryout of the changed steps, approval, training, release and collection of the old copies.

The cheapest audit

Once a month a team leader takes five sheets from five holders and compares identifier, version and copy number with the distribution list. It takes ten minutes, and the area knows whether its control works.

Newsletter

One Lean idea.
Every two weeks.