LANGUAGE OF LEAN

The Language of Lean Lukas Breucha The Language of Lean Lukas Breucha

SMED

Single Minute Exchange of Die. A method of increasing the amount of productive time and to reduce the planned downtime to single digit minutes.

Single Minute Exchange of a Die

This series of techniques was invented by Shigeo Shingo to set-up manufacturing equipment in less than 10 minutes. Most of the time people think in one minute but is thought as single digit minutes.

So what is behind the set-up time reduction?

This method is driving to increase the net production time as much as possible by minimizing the needed time to change from one model to another. As far as you have two or more products running on your line or to simply exchange parts of your machine or equipment that regularly needs to be replaced. This is increasing the flexibility of your production and allows you to react on changes in demand more quickly.

When trying to reduce changeover tomes the typical goal is to reach less than 10 minutes. The short summary of SMED activities is to analyze each element of the changeover with the EMIPS method to see if it can be eliminated, modified or moved outside the process, integrated, tasks are parallelized or synchronized.

SMED

SMED

When looking at those three stages we can simplify it further for each stage:

Just ask yourself:

Separate:
Can this task, as currently performed, be done while the line is still running?

Convert:
Which process steps can be moved out of the changeover itself and be parallelized or completely taken out? How can you do it?

Synchronize:
How can the remaining tasks be synchronized so you need as little time as possible to complete the changeover?

I save you the story with the pit stop in formula 1 - just google it by yourself and you will find the evolution of pit stops. Quite interesting and still valuable.

So what are the benefits of SMED?

The first effect you will see on improvements of the OEE of your manufacturing facility. If this is important for you and you are numbers driven. In the end you will reduce downtimes and therefore manufacturing costs as your machines will have a greater net operating time.

With a long term perspective SMED will enable you to have smaller batch sizes, which will improve your possibilities to react faster on changes of customer demands and in addition your inventory (tied capital) and WIP (work in progress) will decrease.

Read More
The Language of Lean Lukas Breucha The Language of Lean Lukas Breucha

KATA

The term Kata is borrowed from Japanese martial arts and describes a series of movements following the flow of a fight.

The term Kata is borrowed from Japanese martial arts and describes a series of movements (routines) following the flow of a fight. It can be seen as choreography without an enemy. Translated in operations we are talking about implementing routines to achieve continuous improvements. In the lean world the term KATA is well promoted by Mike Rother - therefore customer satisfaction and personal development is improved using improvement and mentoring routines.

The improvement routine consists of four steps

  1. Determine a clear target state > vision statement

  2. Determine the current state

  3. Define the next target condition

  4. Get into action following the PDCA methodology

The goal is to start building a habit of continuous improvement by the application of the principles of Kata. Following Mike Rother - The Kata Story Board demonstrates the basics of the Toyota Kata methodology. This means nothing less than taking step by step towards continuous improvements in your organization towards the targeted state.

Using the Kata methodology gives you the advantage of defining a clear structure and clarity to the improvement process itself. The guideline is clear and easy to adapt:

  1. Remove emotions and options

  2. Create small, fast and effective PDCA cycles

  3. Stop the trial and error > deploy a clear approach with small steps

  4. Build habits that sustainably support your long-term goals

Following the Story Board

With the help of the Kata methodology you will start to build up new habits through continuous training and practicing your routines. With new habits you will reach new skills that might change your own mindest on how to look at things when focusing on continuous improvements. Therefore Kata is a universal methodology that can be utilized in any field, it will not only help you in your professional life but can also be adapted in your private life.

See one example of a KATA Story board below. You can also download a free example here.

An effective way to introduce a lasting change is to establish the routine of continuous improvement habits that strive for excellence. For your organization that should mean to work with a KATA Coach who supports you by installing regular meetings (stand ups/huddles or however you want to call it) and go through the five questions of Coaching Kata and repetitively goes through the four steps of Improvement Kata.

Therefore the five questions of Coaching Kata are:

  1. What is your targeted condition?

  2. What is the actual condition?

  3. What road blockers are in your way that prevent you or your organization from reaching your target condition?

  4. What will you do/try next to come closer to your target condition?

  5. What have you learned from previous steps?

Coaching Kata strives for a long lasting change and you can start small instead of creating a huge mountain to climb in first place. Coaching Kata is empowering everybody involved in your organization, from the shop floor up to the C-level. Kata enables people to participate and contribute to the organizations success through their own actions. In addition Kata will support you on your continuous improvement process and methodologies.

The Kata methodology can be seen as a toolkit helping you to gain a better understanding of how Kata can support you on:

  1. Developing a standardized method on how to improve solution oriented processes

  2. Training managers to see themselves as mentors, coaches and role models

  3. Implementing a problem solving routine that supports on daily basis the continuous improvement process

  4. Developing a framework for a living PDCA cycle that underlines the value of small steps to the all over defined target state

No matter what phase your in - whether you are a one person startup or multi-billion organization Kata provides a methodology that can be used to solve problems and brings you faster to the stage you want to be. The systematic approach can be implemented at all levels of CIP and all fields of industry.

Read More
The Language of Lean Lukas Breucha The Language of Lean Lukas Breucha

PPM

The PPM rate (Defect Parts per Million) indicates how many NOT OK parts have occurred per million parts delivered or produced.

Parts per million or also known as Defect Parts per Million

The PPM rate (Defect Parts per Million) shows how many NOK parts have been produced or occurred with one million parts produced or delivered. Rates can be categorized into two main processes. Lower rate on processes where defects can be easily found and higher rate on processes where defects are mainly hidden, e.g. the structure on casted parts. The PPM rate is mainly used to determine the quality capability of deliveries of manufacturing goods.

Thinking about the automotive industry with the SOP (Start of Production) there are still many failures and defects in the process and those must be eliminated through continuous improvement (CIP) measures. In order to take the customer wishes into account, PPM rates are implemented as KPIs to see the progress of your actions concerning the reduction of those defects.

If you are dealing with the automotive industry you will find a lot of PPM regulations and they are often misused as a source of income. OEMs will give you penalties for exceeding the PPM rate, this is a very common approach. Small and mid-sized companies typically sign some sort of quality agreement with OEMs or their customer, Tier 3 up to Tier 1, this is sort of a framework for PPM rates for manufacturing processes throughout the complete value stream of production.

If you have your customer knocking at your door and asking for a PPM regulation, make sure to categorize your production into major fields of operation such as casting, molding, machining, etc. Or if you have dedicated manufacturing lines for your customer try to focus on the end of line quality check and agree on which ratio is acceptable and which not. Don’t go in the details, this will only give you a higher risk of screwing it up and a wider area of attack. And finally try to agree realistic PPM rates, nothing worse than promising something you already know you can’t achieve.

Just to make sure you got this, the way PPM will be evaluated depends on the criteria defined between you and your customers. E.g. agree on with how many non-conforming parts an entire delivery will be rejected.

Until know we looked on it as supplier, so let us change perspective and see it from customer point of view. 

Supplier evaluation includes several performance measures in order to compare them and rank them properly. The PPM rate is the most meaningful evaluation to asses the quality among your suppliers. In addition to the PPM rate the number of complaints and costs per defect can be included as evaluation criteria. Specially in the automotive industry there are several rules and regulations but key is certification. You can make sure that your supplier follows several rules by being certified after standard norms, just think about EN ISO XXXX. Even when the certification process can be seen as complete waste of time and money, in the end you know that the suppliers know the rules of the game.

So what to do when the PPM rate is exceeding the agreed limit. First of all your quality management should step in. As customer I would ask for an 8D report, of course depending on the failure rate. Therefore again, agree what limits you will have and at what limit what actions will be necessary. It might also be that you will demand from your supplier to immediately conduct a sorting action.
What ever it is or you will work on make sure to follow a structured approach to successfully tackle the PPM rate. For this we recommend to read the PDCA article or the A3 article. No worries there is more that you can do but in the end problem solving in all the cases always follows the PDCA cycle.

The PPM rate is also a great example for a KPI that can measure the effect of your improvement or KAIZEN actions. You see it is a versatile KPI that effectively runs your business and shows you if you’re on track.

Read More
The Language of Lean Lukas Breucha The Language of Lean Lukas Breucha

KANO Model

The Kano Model shows competitive advantage through knowledge. Therefore it shows the connection between product features and customer satisfaction.

The Kano Model shows competitive advantage through knowledge. Therefore it shows the connection between product features and customer satisfaction.

The Kano model structures and analysis the different types of customer requirements and sorts them into basic, performance and enthusiasm requirements. On the basis of this model, which is also known as the customer satisfaction model, products and services can be further developed which customers are more likely to pay for. The model is named after its inventor, the Japanese professor Noriaki Kano somewhen around 1980.

Thinking about our daily work, the Kano Model is quite interesting for product and service development but can also be used to give some guidance for planned product changes.

Typically when start working with the Kano Model a questionnaire is used to categorize the requirements. This questionnaire then determines which customer requirements should be taken into account for a product and to what extent.

The Kano Model recognizes that customer requirements have three different characteristics that make the purchase of a product more likely if they are met:

BASIC REQUIREMENTS
These are must have requirements by customers for a product or service. There are not highly considered and they alone are not the trigger for the purchase. But if these are missing the dissatisfaction is great. Old but still working example: you wouldn’t buy a car without windshield wipers or a cellphone without internet capability. It is expected to be there.

PERFORMANCE REQUIREMENTS
Requirements that are not taken for granted but are demanded. With a growing availability customer satisfaction grows with it. Performance requirements are defined by the customer, when we stick with the example of a car that means e.g. color, horse power, all wheel drive carplay etc. These are normal customer requirements that ensure higher quality of the product.

ENTHUSIASM REQUIREMENTS
The requirements are not expected by the customer but create enthusiasm when the are fulfilled. E.g. if you buy a new car in the area of the alps and you get free snow chains of a year of free car washes. As customer you do not expect this but you are thrilled when you get it. In other terms we are talking about going the extra mile.

In addition, with the Kano Model you find also those product or service features that are insignificant for customers satisfaction or are even leading to dissatisfaction and therefore rejection of the service or product. However, the absence of such characteristics does not have a positive effect.

What we learn from the Kano Model is that those enthusiastic characteristics become basic requirements over time. You can see this changes ongoing particularly in the technical industry such as car manufacturers and features of new cars, what comes now with the basic equipment was back in time all at extra cost.

The Kano model in practice

Following the Kano approach development teams should constantly keep an eye on the current basic requirements of their customers and try to fulfill on product developments new enthusiasm functions or features.

Customer requirements are typically identified through market research. With questionnaires customers have the chance to explicitly describe their expectations as well as what they don’t need.

Checklist: The Kano model at a glance

  1. With the Kano systematic you are able to structure customer requirements into their characteristics

  2. If basic characteristics are missing, dissatisfaction will occur and the product or service will not fly

  3. Performance characteristics are showing if you understand what the customer wants and if you meet those characteristics the customer is satisfied

  4. Enthusiasm characteristics are showing if you are willing to go the extra mile - long term customer loyalty will be the award

  5. Over time characteristics will shift - so don’t make the mistake and rest on your success

If you want to find out more about the KANO Model I highly recommend Wills’ homepage and tool for KANO surveys. I share his love and believe like him that Kano model surveys should be easy to run. Find out more and visit KANOSURVEYS today.

Unpaid promotion - because it’s a great tool.

Read More
The Language of Lean Lukas Breucha The Language of Lean Lukas Breucha

A3 Report

A3 Report and why it will help in the structure of the PDCA methodology.

The term A3 report comes simply from the size of paper which is used for the documentation of the report. The structure itself follows the PDCA methodology.

In the lean manufacturing world the best known use case of the A3 report is the problem solving report. In this case the responsible person from the quality department takes the A3 report, starts the problem solving actions and follows a systematic structure that makes it possible to describe the effects that are currently leading to a deviation from the standard. Using the A3 only makes sense when you don’t know the root cause yet. If you already know the root cause don’t waste your time. Fix it and go back to normal.

Schematic structure of an A3 report

Schematic structure of an A3 report

Let us go through the different stages of an A3:

Describe the problem:
The A3 gives you the chance to initially describe the problem or symptoms - this can be done verbally or as a sketch. Don’t forget to mention when it was and under what circumstances. No matter what it must be easy to understand.

Keep in mind that the target in Lean Mgt. is always to train the people to improve their problem solving skills. Therefore if you are a quality representative try to coach the operators in this process or make a team work out of it.

The result of the description of the problem is the delta from the target state.

Root Cause Analysis:
Please be aware that your paper is only and A3 format. So either you go with an Ishikawa or a 5 Why. But not more. If you can’t conduct a root cause analysis with either on of these methods, the A3 is probably the wrong approach at all.

Counter Measures:
Following the PDCA plan your counter measures what you and your team or operators found out or might think have the most effect.

Lessons Learned:
Great you have done the job, you followed the PDCA and the root cause was found, defined measures helped and the problem is solved. No finalize the A3 report on where to find the documentation and what impact will it have on other operations as lessons learned.

When you are a quality representative using the A3 method ensure that the A3 report is also used for long term development of employees and quality standards.

With the help of the A3 report and a clear coaching through the quality department, all employees learn to recognize, evaluate and solve problems on their own. This is serving the general rule of continuous improvement (CIP)

Therefore the A3 systematic increases the problem solving competencies of your whole organization. And as already said, a problem is only the missing of an idea.

If you want to go deeper on the A3 report itself or the problem solving with the help of A3, we recommend our reading pick “Understanding A3 thinking” this book goes in the details and gives you great insights. Read our summary here. Or you can’t wait? Here is the link straight to the book:

Read More
The Language of Lean Lukas Breucha The Language of Lean Lukas Breucha

MUDA

Read and learn about the 7 kinds of waste.

MUDA – Also see Timwood

In this article we want to talk about MUDA or the 7 kinds of waste known as TIMWOOD.

The seven kinds of waste have to be discovered and eliminated in daily operations. Therefore we will be looking at the 7 kinds of waste and learn how to use appropriate lean tools to reduce these non value-adding activities.

First of all use Gemba Walks to find out more about whats happening on the shop floor. Only through the on-site inspection you can see what is really going on. It is simply not possible to record the types of waste in the conference room at the green table. The CIP Kaizen action on site is always necessary to reduce waste.

When talking about production the ultimate goal is to increase value-creating activities in the complete organization and not to reduce them. Therefore non-value-adding activities are called MUDA - Japanese for wasteful.

Overview of the 7 kinds of waste and the lean approach to avoid these

The individual parts of muda are easily remembered with a simple mnemonic aid called TIMWOOD. TIMWOOD stands for the first letters of the several kinds of waste. Lets have a look at those and some hints what it means:

T = Transport

  • Material flow

  • Product-/Value-/Process orientation

  • Just in Time material supply of workstations

  • Pull steering of production with the Kanban principle

I = Inventory

  • Just in Time or Just in Sequence material supply

  • Pull steering of production with the Kanban principle

  • Takt time

  • Linking suppliers

  • Reduction of batch sizes or production lots

  • Implementation of One Piece Flow principle

 M = Motion

  • 6 S principle   

  • Standardization

  • Fixed allocated spaces

  • Shortest ways

 W = Waiting

  • Multi machining

  • Multi process handling

  • Material flow in U-shaped manufacturing lines

  • Implementation of SMED

  • Installation of Andon Boards

 O = Overproduction     

  • Leveling of manufacturing orders

  • Mixed-Model-Production

  • One-Piece-Flow

 O = Overprocessing/-engineering  

  • Processes are not necessary

  • Kaizen activities

  • Quality circle

  • Idea Management

  • Reduction of complexity

  • Reduction of components needed

  • Reduction of unnecessary process steps

  • Reduction of hand overs and quality loops

D = Defects

  • Reduction of scrap rate or rework

  • Internal customer supplier management

  • Self-inspection

  • Poka Yoke principle

  • Automation

  • Zero Defects principle

  • Stop the line authority

  • 5S activities as part of the standard work

  • Visual Management and visual aids

S = Unutilized Staff

  • Idea Mgt.

  • Shop Floor Mgt.

  • Lean Innovation

Each of the individual elements of the 7 kinds of waste often interact with each other. If you think about your organization as a system, it is necessary to classify not only one characteristics. An approach can only be derived when several classifications of waste have been analyzed.

The 3 MUDA expressions

With the individual process sections and activities and the corresponding 7 kinds of waste, they can be divided into the following activities:

Value Adding Activities 

Kanji Muda - Waste in terms of machinery and equipment

Hiragana Muda - Work that needs to be done in order to fulfill the task but not really add value

Katakana Muda - Everything not needed

All this combined is your total workflow

As seen in real life up to 75% of non-optimized processes are non-value-adding activities which means they are pure waste and eat up your resources. Therefore it always makes sense to eliminate each of the 7 kinds of waste in order to increase productivity. To get an idea see the following picture:

66F15852-A50F-4DD6-AF31-25D8E84CD54A.jpeg

Katakana Muda (red - waste that can be eliminated immediately)

  • Waiting

  • Searching

  • Filling

  • Double work

  • Stacking of components

Kanji Muda (gray and yellow - waste based on machines and equipment)

  • Machinery movement without any function

  • Oversized machines that can produce more than the required parts during the cycle time

Hiragan muda (green - work that is necessary for the provision of services under the current conditions; value-adding process steps)

  • Return to starting position

  • Cleaning

  • Tightening

  • Manual operation of machines

So how to recognize and eliminate the 7 kinds of waste?

Muda can always only be detected at the place of action. Therefore Gemba Walks are the best way to go on the search. But one thing has to be clear - it does not have to be always big projects to reduce waste. Continuous Improvement is key - recurring CIP or Kaizen activities are very supportive to develop an eye for the 7 kinds of waste. Training makes masters.

Second - it doesn’t has to be expensive. Most actions can be implemented at low cost. E.g. make a spaghetti plot to visualize and recognize obvious unnecessary movements.

Third - always have an eye on the value-adding activities. With a trained eye from GEMBA WALKS you will have improved awareness of waste already in the planing phase of new processes. Use those lessons learned and avoid waste in the beginning.

We don’t want to go into details but there are two other types of losses that can be witnessed in an organization. Mura meaning deviation and muri meaning overload (man, machine, material equally). If you want to read more about these, have a look here.  

Let us come to an end - even when it is hard, we could keep going on and on…

But some rules:

  1. No excuses!

  2. Be creative in first place - money always comes second

  3. Never try to explain why something doesn't work, try how it works!

  4. Adjustments kills your time and ambitions. Adjustment means to fight the symptoms not the root cause!

  5. Do not worry about problems that do not yet exist.

Happy Improving!

Read More
The Language of Lean Lukas Breucha The Language of Lean Lukas Breucha

Paradigm

A paradigm is a framework for thinking about something, usually a scientific or technical discipline.

Definition:

A Paradigm is a fundamental idea about reality, frequently unquestioned and difficult to change, that conditions all our thinking about and even our physical perceptions of the world or some aspect of experience.

Paradigm / Paradigm Shift

The framework of a paradigm is to think about something and can be considered as a technical or scientific discipline. Just think about the paradigm that big lot sizes are good concerning a machining process where the machine itself has long set up times, or that lean principles only effect the shop floor while having no influence on administrative tasks.

Paradigms are often considered as things that can’t be changed and therefore negatively determine the way we think about solving problems. Just think about automation of non value adding tasks > this is truly waste. So taking a wrong paradigm and building on them will reinforce the root cause of the problem itself and bring you no benefit.

Of course there are some paradigms that are right but do not hesitate to question and challenge them.

When talking about a shift of paradigm this means nothing more than changing the perspective of one frame to another. Changing the paradigm is a challenging process just think about for how many decades people where thinking the world is flat…

Read More
The Language of Lean Lukas Breucha The Language of Lean Lukas Breucha

The 3 MU

Muda = waste, Muri = overload, Mura = imbalance. Read more about how to define and eliminate the 3 MUs.

In the lean world it is all about “WASTE ATTACK” > eliminate the 3 MUs. It is the bottom line of all KAIZEN and Lean activities. The 3 Mu come from the Japanese words muri, mura and muda. Muda is the most known as it describes waste and we discuss the 7 kinds of waste in the TIMWOOD article. Just to give you a hint TIMWOOD stand for: transport, inventory, motion, over production, over processing and defective parts. These kinds of waste are easily visible by observing manufacturing processes. It gets a little bit trickier if we talk about the other 2 Mu. Muda you get a straight forward feeling, mura and muri are more hidden. 

The best way to explain muri is that you are over stressing a system or process. If you e.g. use a forklift that has a maximum of 500kg and you are transporting 1 ton. Your forklift won’t last long. You are either overstressing or trying to do something that can’t be done. The result of it will be a loss in performance.

Mura is unevenness or variation of processes most of the time a result from muri. You can also compare it in administrative work, if you have too little or too much to do. To stick with the example of the forklift, mura would be having only 200kg to load on the forklift on one transportation and on the next route 1.400kg. The result of this variation may be that you try to load 700kg on each route even this is exceeding the max load. The result of it will be that you have breakdowns, defects, excessive motion and other wastes. In all lean management, whether it is manufacturing, logistics, healthcare or knowledge transfer focuses on getting rid of muri, mura and muda in order to improve performance. If you want to get rid of waste in a sustainable way, you have to go upstream and start looking at how products, services or the work itself is designed. You need Value Designing and Value Engineering in the widest sense of the lean terms.

A simple and easy way to make things visible is the classic GEMBA walk – go to the production and see what crime your designers and engineers have committed. Go Gemba helps you to identify and eliminate wasteful steps in assembly and set preventive measures such as Poka Yoke devices to ensure conformity of your products. If we think of designing work itself we want to achieve a continuous and smooth stream of activities. Having this in mind always helps us to redesign processes, get rid of rework, delays or overengineered process steps. Value Stream Mapping as it is done today and redesigning it to focus on fast, high quality hands-off will result in reduced costs and time to market lead times.

MURI in terms of the designing phase will be visible in the need of long working hours to meet the schedule. You will see that it also comes from MURA because the workload itself is not levelled. Who hasn’t been in the situation that you have a design release and suddenly you are twice as busy as before. In the end MURI and MURA leads to MUDA when we start making failures under the pressure of time, when we start releasing before everything has been fully tested or checked.

In the designing phase or let’s say in the creative phase it is typically hard for employees to judge what is waste and what not. It starts with unclear requirements from the customer, but yes some work needs to be done anyway. That’s one point and another one is the mainstream mindset that design is 100% creative and can’t be standardized or quantified. We all heard about Pareto which tells as that 80% of a project are carry over parts and 20% are individual solutions for the specific project.

Lean Design is more a mental rather than a technical challenge.

Carrying on with the example of lean product development, the focus should be to streamline the routine and repetitive work packages so that there is more time for the individual, creative, value-adding part of the project. To clean out your process standardization of items, design elements, documentation, software used and the wiki of Lessons Learned from other projects are just some methods to apply basic lean principles in the development process.

If you think about decentralization of organizations with a global presence, design teams usually suffer from inefficient processes and inadequate design review meetings. Think about standardization as an organization wide language to communicate. If everybody talks the same language you have transparency which rewards you with more time for the creative part.

Considering the cost of delays in time to market, troubleshooting during launch phase and failure occurrence in the field, the design team should think about the rule of ten according costs of failure.
Lean management is based on continuous improvements (kaizen) based on standards and lean design is no different.

Read More
The Language of Lean Lukas Breucha The Language of Lean Lukas Breucha

GEMBA WALK

Gemba - the Japanese Term for “the place where it actually happens”.

If you’re familiar with lean and you try to talk about it with others it is most of the time reduced on eliminating the 7 types of waste and people are feeling great when they know what TIMWOOD stands for. Don’t get me wrong it is great to have some knowledge and visibility out there but the downside is that it often leads to a quick end on taking action.

The key of lean is to fulfill the customer’s expectations and not reduce overproduction or WIP and all this by solving specific operational problems. The 7 kinds of waste are only the visible downside of weak or bad processes. They are only the symptoms but not the root cause.

This is always the tricky part in lean management. While it is mostly easy to identify waste it gets harder on seeing the root cause of waste in the process.

Lean is about learning to see!

Affiliate Ad

Learning to see is a lean must have and you can call it a real classic in the lean world. This is the holy book of value stream mapping. With value stream mapping you are very fast on describing a process and find out where MUDA appears and how to eliminate it. With VSM you have a great tool to show your given process, analyze it, smooth it out and test some options, before you even touch machinery or equipment. It gives you a blue print of your future process.”

Read more in our reading picks here.

But let’s get to the Gemba Walk Trail

To get used to standardized problem solving in the first step is to go to the place of action. You can discuss problems as much as you want but when you don’t get yourself to see it, it is worthless. This is where the Gemba Walk comes in the game. Gemba is a Japanese Term (well surprise in the lean world) and stands for the place where it actually happens. This can be everywhere and everything in the process chain, starting from typing in customer orders over work stations on the shop floor where you actually add value on something to the fulfillment process in your outbound warehouse.

Key of Gemba is not to talk in wild theories or totally abstract about problems, but to have a look where it occurs and discuss them on site (looking at the process in the real world, get rid of unnecessary power points and excel sheets! Nobody cares anyway!) Too often we want to believe the statement of a “pro” and forget about it instead of going there and have a look ourselves to gain a better understanding of the problem and make up our own opinion. 

But above the pure problem solving it is about continuous improvement and the never ending journey of learning.

The question that might raise now is: What do I have to look for?

For this more rhetorical question are countless answers. Just google Gemba in the WWW and you will find plenty of sources and recommendations on where to start and what to look for. Some points that are always included are:

  1. What is our standard? What should be and what is?

  2. Can the person doing the job explain me the standard?

  3. What is the person doing and what is he/she doing deviating from the standard to make it easier?

  4. Why do have a deviation?

  5. Do we need more material in the process?

  6. Do we need less machinery in the process?

  7. Can we do it with less resources?

  8. Are there waiting times?

  9. Do we have defective parts coming in or out the process?

  10. Are we producing defective goods?

  11. How can we identify defects?

  12. Are all documents up to date?

  13. What indicators are used/observed and how are they visualized?

  14. And so on…

As you can see, there is a countless number of questions you can ask yourself and your employees during a Gemba Walk. Each of these questions is correct, important and have a right to be asked. But don’t even think about creating an audit checklist and ask always the same.

To bring it together

Stop thinking upfront what you want to achieve with a Gemba Walk, like improving a specified process, think about Gemba Walks in first place to gain a better understanding of the process flow and start from there making your way down to the root cause of problems in the process. As already mentioned this narrows it down to three simple questions:

  1. What should happen?

  2. What is happening?

  3. Explain why!

Finally – use the chance during Gemba Walks and try to find improvements for visualization at the process. Even if you are not conducting a Gemba Walk – when you’re passing by and clearly see that something is wrong you have the chance to go straight in.

In the end it is all about time and we all know time is money.

Read More
The Language of Lean Lukas Breucha The Language of Lean Lukas Breucha

6R

6R - The right product at, the right time, at the right place, in the right quantity, in the right quality and for the right price.

Let’s have a look on the logistics in operation. Everybody crossing the way with logistics will hear about the famous 6Rs the “six right ones” they say.

  1. The right components

  2. in the right amount

  3. at the right place

  4. in the right quality

  5. at the right costs

  6. at the right time

To summarize logistics this is it. The 6 Rs show that the main task of logistics is to make material/goods/components available.

You might have heard about the 7th R > the right customer.

So we think 6R are perfectly known as they got taught for decades. But with the lean transformation all over the 7th R becomes key on hitting lean mindset in logistics. It is all about customer centric orientation of the complete supply chain. It doesn’t matter where, how and why in the end you have to start with your customer and build along the upstream your logistics set up.

And here is the most valuable point, your customers are not only outside your organization, they are among your complete organization. If everyone along the process chain sees the next step as a customer, they also have to meet the customer expectations. This gives you a great pull effect throughout the complete process chain and in addition every employee is responsible as supplier and customer, two roles in one person. With this continuous focus on the customers demand or needs, all signs from the market result in a kind of resonance throughout your complete organization and causes an effect.

Logistics made up his way from simple material supply over optimizing material flow to become a crucial part of operations. Nowadays logistics are the arteries of manufacturing industries.

The traditional way to see logistics is seen in the 6R’s as shown in the beginning. For most of the business cases the 6R’s are enough and suitable in practice. But for real operational excellence and an impact on your lean journey keep always your customers in mind.

Following the 6(7)R’s will affect 4 main areas of your production system 

  1. Smoothed production

  2. Warehouse organization

  3. Production synchronous material flow

  4. Cell production

Read More
The Language of Lean Lukas Breucha The Language of Lean Lukas Breucha

Signal Kanaban

Kanban is perfect to steer production and prevent high amount of WIP.

Every container or bin in your production facility is marked with a so called Kanban card or signal. The time the last component is taken, the Kanban is send to the source it came in production and is added to the so called Kanban Board. This board actually shows you the amount of inventory you have in production. It is a great tool to minimize the risk of overproduction and can be used to steer your production facility. Besides this it helps you to have control of your inventories itself of course . Based on the design of Kanban Cards it is possible to identify directly where the container belongs to and in what interval you have to check on it.

The checking and supply of material or components lies in the hands of the mizusumashi.

Read More
The Language of Lean Lukas Breucha The Language of Lean Lukas Breucha

Takt Time

The rate at which product must be turned out to satisfy market demand.

Takt Time is the beat of your process. When your process is perfectly balanced the complete workload and capacity throughout the complete value adding chain is best utilized to fulfill your customer demands.

So this is already it, the customer determines your Takt. Just have a look on your available net production time and divide it by the rate of the customers demand. I do the exact same thing, when I’m in the role of a project manager I want to optimize the available resources and straighten out the workflow over the expected time needed to finish the project. In the Lean World it is also important to understand the difference between Cycle, Lead and Takt Time if you are running a sophisticated Project or SIX Sigma initiative.

So let’s have a look at the differences

Lead Time VS Cycle Time

It happens very often that people mix up Cycle Time with Lead Time. Most common is the thinking that Cycle Time is the time needed between order placement and delivery while others think it is the pure time between two deliveries.

To put this straight, Cycle Time is the time from when the work is started until it is ended. This brings us to Lead Time.

Concerning Lead Time, it starts with the first contact from customer side e.g. the placement of an order and ends with the shipping.

Easy example:

Order placed by customer on July 12.

Order processed (actually fulfillment of order July 18-20.

Order shipped on July 20.

This gives you a Cycle Time of 3 days but a Lead Time of 8.

This exactly the point where value stream mapping comes into place and can help you on cutting down Lead and Cycle Time, but I will get you there in a different article.

Don’t get on the wrong path of thinking that Cycle Time is the pure value adding, it is simply the time you need for processing the order. That is the reason why should focus on Cycle Time when starting lean initiatives and make your way from there.

Takt Time

Yes it comes from Germany, TAKT comes from Taktzeit, meaning the rhythm of music. TAKT is therefore the beat of your process it is the measurement of your existing production. The Takt Time gives you the maximum amount of time to meet customer demands. In other words Takt Time is the heart beat of your customer and if you are not able to supply your customer in Takt you will bring your customer in struggle. Then you are very quickly no longer a supplier

So what is the Takt Time formula:

(Net Operation Time Available for Production)/(Customer’s Demand)

Always in the given unit of time.

Let’s make an example with the automotive industry:

Your OEM wants 1.000 cupholders per day. You have 8 hrs shift working two shifts per day. That gives you 16hrs per day. Then you deduct times for breaks, distribution time and for preventive maintenance measures, we assume 75mins per shift, this gives you:

16 * 60 = 960 minutes

960 - 150 (75*2 Shifts) = 810 minutes

810 minutes / 1.000 cupholders

= 0,81 minutes per cupholder

or in other words you have 48,6 seconds for one cupholder

Having a look on this calculation you still have to consider some factors, such as operations that are done simultaneously.

The tricky part with Takt Time is that it is based on the assumption that you have a continuous amount of demands coming in from day to day. With high fluctuations on demand you will have to readjust your Takt Time from time to time.

Takt Time is also used to calculated a couple of other parameters, such as batch size, work in progress, shifts needed or operators needed.

What to say in the end…

If you are trying to run KAIZEN actions or CIP measures the first thing to understand is what does Cycle, Lead and Takt Time stand for. Only with the right setting in the beginning your improvement efforts will show an effect.

Read More
The Language of Lean Lukas Breucha The Language of Lean Lukas Breucha

Mizusumashi

A Mizusumashi is the operator responsible for supplying a workstation and keeping production going without interruption.

Water Spider or Mizusumashi

Mizusumashi or in other terms called Water Spider is the responsible employee of the inbound logistics for supplying workstations and keeping production going without interruption.

The Mizusumashi is someone who moves quickly and efficiently from station to station in order to collect and deliver material/components to the primary members of a flow cell. Through the Mizusumashi we try to move as much of the non value adding work away from the primary process steps as possible and is centralized to the water spider.

The Mizusumashi differs from a material handler in that the sequence of operations and the way the tasks are performed are specified. A water spider’s purpose is to handle the replenishment tasks so that the production personnel can focus on the value-added tasks that create products.

Always keep in mind that a Mizusumashi has a clearly standardized process. The rounds should always stay the same as well as the replenishment tasks. They collect the finished goods from the lines, drop Kanban Cards, refill Kanban Boxes and remove waste material. All of these tasks relieve the operators in the line and keep up the production flow.

For the best utilization of a Mizusumashi a proper setup is critical. For everyone involved on the shop floor you must have clear rules. This means clear location for bins, full and empty, clear visual controls that initiates the action of the Mizusumashi and strict following of 5S rules according to designated locations of components and goods

With the help of a Mizusumashi you have the chance to minimize variation and improve the production flow. Following the lean principles you don’t want to waste time and keep up working in sequence. The key is having a position that keeps the operator in place and let them do the job without interruption.

Of course with the role of a Water Spider there is some waste involved. Often they leave their designated route to check on stations without any sign of shortage. But nevertheless in the end the buffer range for all stations will go down, which means that the fixed capital on the shop floor will shrink.

Read More
The Language of Lean Lukas Breucha The Language of Lean Lukas Breucha

U-Shape Layout

The U-shape layout describes the layout of machines and workstations in a one-piece-flow, where they are laid out in the shape of the letter “U”.

The U-shape layout describes the format of the manufacturing or assembly lines of machines and workstations following the principle of one-piece-flow which is laid out in the shape of the letter "U". The operators are working inside the "U" and with the proper supply of components or material allocation from the outside the movement is reduced to the minimum. The goal is also with the U-Shape layout to have interruption free assembly.

Using “U” Shaped Cells

Generally speaking the u-shaped layout of a manufacturing cell allows operators to easily move from one process step to the other as well as passing on parts or pre-assembled units to the following step with little effort. It is not a necessity to have the U-shaped configuration. This comes mostly from maximizing throughput on less manufacturing space (€/sqm).

The layout of assembly lines in a “U” shaped layout has several advantages:

  1. The Start en End are close together, allowing with an installed 2 container mgt. to have full visual control. Following the mizusumashi principle - one operator can handle feeding the line including supply of raw material as well as the transport of finished goods.

  2. The shortening of distances allows to share process steps, like in a chaku chaku* line, as well as reducing the wastes of transport and motion.

  3. The U-shaped layout provides you the foundation for interruption free one-piece-flow.

  4. Transparent and open communication within the work cell is easier.

  5. Value adding process is done inside the assembly line, material supply is done from the outside.

  6. Following the principles of flexible equipments - high level performance is when your machines and tables are on rollers to have a quick reconfiguration.

  7. Typically as mentioned before:, it is less floor space required than with a stretched line, as well as distances for movement are reduced.

Chaku Chaku is a takt flow oriented manufacturing process model. It means load load and describes that one operator follows the complete assembly process - walks with the good - and conducts each assembly process. To learn more about Chaku Chaku read here.

Read More
The Language of Lean Lukas Breucha The Language of Lean Lukas Breucha

CHAKU CHAKU

The term Chaku Chaku comes from the Japanese and can be translated with "load load”. Also in general it has become a term for variant of a flow or series production, and the work in it.

The term Chaku-Chaku comes from the Japanese and can be translated with "load load”. Also in general it has become a term for variant of a flow or series production, and the work in it, naturalized, at of all the workplaces involved in the production of a product following each other so that the shortest possible distances between them are possible. Since there must also be space for transport, this is usually a u-shaped or omega-shaped formation.

The basis is multi-machine work: one operator works on several process steps. It is usually his task to load and unload the material. The stations work independently without the intervention of the operator, often simple tasks are taken over by the operators in order to save on machine purchases. In practice, the operators only take over the transport from station to station, sometimes there are “mini” buffers provided at the stations, in which a machined work piece can wait for a short time.

Through the Chaku Chaku production system, also known as flow production, can be different depending on the complexity of the parts to be produced also refrain from purchasing machinery or even dismantling machines. These machine systems are then replaced by mostly simple manual workstations.

In a Chaku Chaku line the operator primarily performs the loading and starting of the stations through. The material is supplied from outside, safety measures to the employees and the ejection of machined parts are automated. The capacity of the line is mostly determined by work distributions of one to three operators flexibly. The advantage of this system is that:

  1. thus the usually high acquisition costs for complex interlinking machines

  2. and the training time of the workers employed is usually shorter, since the

  3. activities are often of a simple nature, and therefore don’t require extensive instructions and

  4. there is no training on complex machines.

Also, with the Chaku Chaku principle, the cycle time can be controlled individually, for example, if the pre- and downstream machines run at different speeds, this will be controlled by the operators.

The structure of a Chaku Chaku Line is based on the simplest production principle in which manual labour is the most important factor.

The operator has to fulfill transport, quality control and process monitoring for this. In the manufacturing process, the principle applies that the machine is maintained and not man. Expensive technologies require a high occupancy of machines, are less flexible for fluctuations.

In the simple Chaku Chaku Line it is easy to achieve the required number of units through the design of flexible deployment of operators.

Read More
The Language of Lean Lukas Breucha The Language of Lean Lukas Breucha

EMIPS Method

EMIPS stands for eliminate, minimize, integrate, parallelize, synchronize.

EMIPS stands for eliminate, minimize, integrate, parallelize, synchronize. The EMIPS method is a process improvement principle. It is implemented to undergo a structured assessment of processes or individual process steps with the goal of optimizing the approach of improvement itself.

Ad

When it comes to process improvement we recommend this book “The Art of Process Improvement” by Abdul A. Jaludi.

The Art of Process Improvement is a high level strategic book aimed at leaders looking to cut expenses, improve employee morale and maximize profits.

Read More
The Language of Lean Lukas Breucha The Language of Lean Lukas Breucha

Hancho

Read how a Hancho will support your organization as the first management level on the shop floor.

A Hancho is the first management level in a lean organization. A hancho is the technical manager or team leader (speaker - Japanese chô) in one part of the process or a small group (Japanese han) and typically consists of 6 to 10 employees. A Hancho masters all processes in his /her area, receives a slightly higher wage (5-10 %) than normal operators and is selected and appointed by the company. The hancho’s responsibilities include reacting to abnormalities and promoting standardized work and the process of continuous improvement.

In order to increase productivity the Hancho is the key player in his role as a team leader. Above the Hancho level your organization, depending on size, has the group leaders which are having a larger number of employees underneath them.

In order to implement the role of a Hancho you need define several aspects upfront. Just answer some questions to yourself:

  1. How many Hanchos do we need?

  2. What will be their daily tasks?

  3. Which qualifications are a necessity?

  4. Which employees are suitable for this role?

  5. Does the employee have the right professional and social qualifications?

At Toyta e.g. the Hancho has following tasks:

You see that most of the time is used for problem solving and the dealing with absence. In best case the Hancho is dedicated to only this tasks, because he contributes the most for a successful continuous improvement management on the shop floor.

Read More
The Language of Lean Lukas Breucha The Language of Lean Lukas Breucha

Heijunka

How to level production with the help of Heijunka.

Heijunka is a tool in the lean world that is striving for a leveled and smoothed dispatching of manufacturing demands which therefore leads to a reduction of waste. The meaning of levelling is to transform irregular incoming orders into uniform production batches. The target is to bring all demands on the smallest batch size possible based on a leveled production pattern. The Heijunka Board visualizes the predefined production plan for the production process. The beauty of it is that it enables you with little effort of control to implement a steady and synchronous flow of production.

If you are in a leading manufacturing position you already know how painful it can be to maintain a steady flow of work.

Customer demands are typically not perfectly leveled and this fluctuation needs to be translated into a defined takt that is given by your production process. To keep up with the incoming stream of orders and to avoid overproduction and therefore tied up cash, Heijunka can help you lowering the peaks and smoothing out production.

Heijunka is a well-known lean method for smoothing and reduce the over stressing of a production process. Heijunka is Japanese and means roughly translated levelling. The main reason for implementing Heijunka is a faster reaction time on fluctuating demands and improving the utilization of installed capacity.

With the help of Heijunka you minimize the sizes of batches to smallest size possible and start processing customer orders based on demand. This will support you on reducing your inventory as you will stop producing based on utilization of line capacity and then pile up finished goods without being sold.

At the bottom, Heijunka allows you to produce and deliver value to your customer at a steady pace and gives you the chance to react faster on deviations, while not overstressing the process. Therefore this method gives you always two options for levelling your production: By type or by quantity.

Balancing by type:

Go through your portfolio and define the average demand of each product. Based on the average demand the production is smoothed out to meet it. The target is to level the capacity of our line. Use Heijunka to keep up with the demands of each product of your portfolio and use it to visualize the production plan.

Balancing by quantity:

The main road blocker to establish a smooth and continuous production flow is producing in batches. The target is clear: produce only what is ordered. Therefore, Heijunka enables you to level your production by the average volume you get. By levelling your production this way, you will be able to achieve all demand by the end of the week. With the help of Heijunka you will keep your processes running without overburden it when unplanned peaks are coming in.

The Heijunka Box is a tool implemented on the shop floor in order to visualize the workload that needs to be fulfilled in order to meet the average demand. Simply spoken it has cards spread over the week for each product in a logical sequence to reach optimal flow.

The Heijunka Board

The Heijunka Board

Usually the Heijunka box is set up in a matrix with the first column separated by product type for each line, the following columns are the workdays of the week. Therefore your Matrix defines Product type and the quantity that needs to be produced on a specific day. Two ways are most common, either as boxes where cards are placed in or as a board with magnetic cards that stick on it.

Depending on your installed capacity and the team size you want to cover with Heijunka you might need multiple Heijunka boards. Typically the cards you use are having the format of Kanban cards, that are following the process of the processed good until the end and then are placed back to the collection box for new planning.

Heijunka is a great lean method that allows you to organize your workflow around average customer demand. You protect your processes and employees from over stressing due to uneven production and quantity sizes. Furthermore, it supports you on realizing a complete pull system throughout production.

Read More
The Language of Lean Lukas Breucha The Language of Lean Lukas Breucha

FiFo

FIFO is a warehousing-related principle. The parts that were stored first are picked first.

FIFO – First in First out

FiFo is a warehousing-related principle. The parts that were loaded in first are the once next in line to get picked.

Most commonly known as FiFo is that a shelf system is filled on one side with goods, which are later removed on the other side: The (strict) FiFo principle (First in - First out) works according to this method.

The FiFo storage principle is recommended when you have components of only one type in one line stored and it has to be ensured that the oldest loaded unit is set first so it will be always removed first. It is suitable for the optimized provision of goods in production and assembly and in industries in which the consideration of factors such as the best-before date of foodstuff is essential.

FiFo - First in First out

FiFo - First in First out

In accordance with the strict FiFo principle, the provision of the stored goods takes place purely under the aspect of access sequence, as it is automatically the case with a flow rack, without any further precautions being required. In the moderated FiFo principle, groups of loading units are considered to be the same (e.g. all articles with the same minimum best-before range) or criteria such as shorter withdrawal distances are used as a basis.

Read More
The Language of Lean Lukas Breucha The Language of Lean Lukas Breucha

Voice of the customer

When talking about voice of the customer (VoC) we think about the customers’ expectations which are driving product development, services and improvement of daily business..

When talking about voice of the customer (VoC) we think about the customers’ expectations which are driving product development, services and improvement of daily business.

The VoC method is there to identify and transforming customer wishes, expressed or unspoken, into a quantified and structured customer requirement catalogue. It therefore is typically used at the beginning of new product definition, it pre-defines features and functions for the further development process.

Voice of the Customer

Voice of the Customer

Also important for customer service, whenever customer service is needed. As an example for use cases think about sales process or even management process. But to simplify we talk about products.

VoC unfolds his full potential in the product definition phase in combination with Six Sigma. When Quality Function Deployment (QFD) is performed, VoC delivers valuable input.

VoC makes it possible to define the design of a product in the product development process in such a way that the customer’s expectations are fulfilled or even exceeded. The product definition starts with customer needs and not with technical product features (think about Timwood > Over Engineering). By keeping this in mind you will have a higher level of customer orientation.

A separate analysis of requirements and technical solutions will increase your flexibility on both sides, with VoC you are creating a comprehensive understanding of the market demands and the products you are offering.

When we have a look at highly innovative products VoC might not be the right choice > when the potential customers don’t know about > how can they have expectations. This gives you a large uncertainty using VoC.

So, what is the expected outcome of VoC > it will give you a complete, structured list of weighted and non-overlapping customer requirements that can be directly used for the product development process. One way to bring it in format is a so called VoC table.

Ad

This reading pick is awesome when you need a kick in the butt to turn outside-in. The focus is on the so called “reverse value chain”. Everything starts with customer wishes and based on those you develop innovative products or services.

No matter if you are a business student or manager and have to develop a company strategy, this book is just right. Not always easy to read but in summary it is all about connecting, converting and collaborating with your customers.

Read more in our reading picks here.

What needs to be done before:

You will need a defined customer target group! If you don’t know your target group or segment a VoC will never deliver meaningful results.

Before you start with a VoC Project a project team needs to be defined, it should include at the least the core product development team. In this way you will be able to bring in the knowledge of marketing, sales, product development and management, quality and production as well as other departments of your organization. If you want to go for the complete thing, think about even getting in key customers as a temporary team extension.

Like in most cases, a VoC Project-Team is a cross functional and cross departmental group of people. Therefore, you have to have a neutral moderator. It is the moderator’s job to ensure that these different interests do not lead to any falsification while collecting customer expectations and formulation towards requirements

Finally, as it will be a project, it needs management support. The Management has three main tasks:

  1. Ensure that people involved are set free of other tasks to give their full resources to the project

  2. To approve resources

  3. Approve further development of the outcome of a VoC project

Read More

Stay Connected


Ad

We want information fast and in a nutshell. We from OI recommend Blinkist* - because it’s simply the best.

* = Affiliate Link