Production Planning and Control
Keep dates with a short lead time. 10 parts in four blocks, from planning levels, capacity and leveling to the bottleneck, drum buffer rope, lot sizes, Little's Law, CONWIP release, priority rules and daily control.
Many plants deliver late while their shop floor is full of material. The cause is rarely a lack of machines. It is a plan built on nominal hours, a bottleneck that waits for blanks and programs, orders released because material arrived, and a sequence decided by whoever asks loudest. This series covers the planning and control tools that fix this in a medium-sized plant: three planning levels with clear owners, capacity and load per work center, leveling of volume and mix, finding and protecting the bottleneck with drum, buffer and rope, lot sizes that respect where setups cost something, Little’s Law and work in progress limits, a release check with CONWIP, priority rules for the queue, and a daily control routine with four numbers.
Block 1Plan and See
Block 2Protect the Bottleneck
Block 3Flow and Release
Block 4Sequence and Control
No part found. Try a shorter word.